Concrete Overlays and Applications

Slides:



Advertisements
Similar presentations
Chp12- Footings.
Advertisements

Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
2013 Concrete Pavement Construction at MnROAD Tom Burnham, P.E. Minnesota Department of Transportation TRB AFD40 Monthly Seminar September 12 th, 2013.
Highway Engineering Pavement Types
European Asphalt Pavement Warranties Scan September 14-28, 2002.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Concrete Overlays ITD Project Development Conference Spring 2011 Jim Powell, P.E
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
No. 18 of 19 Geosynthetics in Asphalt Pavements by Prof. S.F. Brown FEng University of Nottingham The information presented in this document has been reviewed.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Pavement Design CE 453 Lecture 28.
The Rehabilitation Solution for Alabama’s Concrete Pavements
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Surface Rehabilitation Treatments
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PCC Overlays of HMA Pavements
Session 3-6 HMA Overlays.
Chapter 5 Patching and Edge Repair
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Pavement Maintenance II
Underground Systems: Hydraulic Design
Pavement Distresses Flexible Pavement
Extending Asphalt Pavement Life Using Thin Whitetopping Mustaque Hossain, Ph.D., P.E. Department of Civil Engineering Kansas State University.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Analysis and Design
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
April 19, 2005 PPTG Meeting Education Efforts for the PPTG How to share our knowledge and experience with others.
Early Performance of Concrete Pavement Overlays in Minnesota Tom Burnham, P.E. Minnesota Department of Transportation 15 th Annual TERRA Pavement Conference.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Michigan Department of Transportation Pavement Demonstration Program Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis.
Pavement Types Dr. TALEB M. Al-ROUSAN.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
MODULE 1-2 Introduction to HMA Pavements. Learning Objectives Describe the types of (HMA) pavements Identify the role of each pavement layer Discuss key.
What is a Resource? Any physical or virtual entity of limited availability A new or reserve supply that can be drawn upon when needed Something that one.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Harold L. Von Quintus, P.E., ARA Jagannath Mallela, ARA
Using Reflective Crack Interlayer-
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
GEOTEXTILES IN TRANSPORTATION APPLICATIONS
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Russian Engineers Training March 2011
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Protecting Your Pavement Investment Jeff Stokes. 4 R’s for Paving Success 1 Risk Management Identifying and minimizing your risk factors 2 Right Repair.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
European Asphalt Pavement Warranties Scan
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Design and Control of Concrete Mixtures CHAPTER 2
Presenters: Sumon Roy1 and Badrul Ahsan1
Surface Preparation before laying Hot Mix
Pavement condition index calculation
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Introduction to Pavement Design
Pavement Preservation
PASER Ratings for TwinCATS Planning Area
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Pavement Structural Analysis
Pavement Structural Analysis
NRRA Pavement Workshop 2019
Presentation transcript:

Concrete Overlays and Applications Pennsylvania Concrete Conference, January 27, 2009 Dale S. Harrington P.E., Representing - National Concrete Pavement Technology Center

Concrete Overlay Guide second edition Contents Overview of Overlay Families Overlay types and uses Evaluations & Selections Six Overlay Summaries (11”x17 “sheets) Design Section Miscellaneous Design Details Overlay Materials Section Work Zones under Traffic Key Points for Overlay Construction Accelerated Construction Specification Considerations Repairs of Overlays Second Edition September 2008

Overlay Committee (17 Members) Andy Bennett, Michigan Department of Transportation Jim Cable, P.E., Iowa State University Dan DeGraaf, Michigan Concrete Paving Association Jim Duit, Duit Construction Co., Inc., Oklahoma Todd Hanson, Iowa Department of Transportation Randell Riley, Illinois Chapter ACPA Matt Ross, Missouri/Kansas Chapter ACPA Jim Shea, New York State Chapter ACPA Gordon Smith, Iowa Concrete Paving Association Sam Tyson, Federal Highway Administration Leif Wathne, American Concrete Pavement Association Jim Grove, CP Tech Center Matt Zeller, Concrete Paving Association of Minnesota Jeff Uhlmeyer, Washington State DOT Kevin Maillard, OHM Advisors Robert Rodden, American Concrete Paving Association Shannon Sweitzer, North Carolina Turnpike Authority

System of Concrete Overlays Thinner Thicker Concrete Overlays Unbonded Concrete Overlay of Concrete Pavements Unbonded Concrete Overlay of Asphalt Pavements Unbonded Concrete Overlay of Composite Pavements Unbonded Overlay System Bonded Overlay System Bonded Concrete Overlay of Concrete Pavements Bonded Concrete Overlay of Asphalt Pavements Bonded Concrete Overlay of Composite Pavements Bond is integral to design Old pavement is base Page 1

Why Concrete Overlays? Consistently provide cost-effective solutions Constructed quickly and conveniently Few preoverlay repairs are necessary Placed using normal concrete pavement construction practices Can be opened to traffic within a short time using standard mixes Easy to repair Cost-effective maintenance tool and valuable rehabilitation tool Can serve as complete preventive maintenance or rehabilitation solutions or can be used in conjunction with spot repairs of isolated distresses Ask the group what the reasons might be to consider concrete overlays. The reasons listed here are perhaps the primary reasons, but there are undoubtedly many others. Life-cycle costs is one tool that brings together several of the key factors: initial investment, anticipated service life, overlay and maintenance costs over the roadway's life. Page 2

Versatile and Sustainable Solutions As long as the original pavement is stable and uniform for a concrete overlay to be placed, it can be replaced or recycled as needed for maintenance and/or rehabilitation cycles. The concrete overlay system can be sustained for 100 years or longer. The original pavement will provide a continuing return on the owner-agency’s investment. The owner is maintaining and building equity in the pavement system. Page 2

Pavement Preservation and Rehabilitation Involves investing in a carefully planned system of regular routine maintenance, preventive maintenance and minor rehabilitative actives Extend the life of existing pavements Highway agencies are increasingly relying on a proactive approached called pavement preservation Major Rehabilitation Page 3

Preventive Maintenance Extends the service life by applying cost-effective treatments to the surface of structurally sound pavements such as partial and full depth repairs, dowel bar retrofit, diamond grinding and/or thin bonded overlays. Page 3

Minor Rehabilitation Is used when some structural capacity needs to be restored or added to a pavement but major rehabilitation is not required. Typical application could include some spot elements of pavement preservation in conjunction with either a bonded overlay or a thinner (4” to 5”) unbonded overlays Page 3

Major Rehabilitation Involves structural enhancements that extend the service life of an existing pavement and improves its load-carrying capability. Pavement preservation techniques are typically used in conjunctions with a new unbonded concrete overlay of 5-in. or greater. However, thicker bonded overlays have been used. Page 3

Overlay Solutions for Rehabilitation and Maintenance Page 3

Uses and Advantages- Bonded Overlay of Concrete 2”–5” thickness Use when existing pavement is in good structural condition with some surface distress. Use to eliminate any surface defects; increase structural capacity; and improve surface friction, noise, and rideability. Where vertical clearance issue. Typically used directly over concrete without additional repairs except for spot-repairing of severely deteriorated areas. Pages 4, 12-13

Bonded Concrete Overlay over Concrete Where any of the above distress are present, their severity and extent should be considered to determine if a bonded overlay is appropriate. Working cracks to be repaired or sawed since they will reflect through. Page 12

Bonded on Concrete Keys to Success Bond is important for good performance as a monolithic pavement. Concrete aggregate used should have thermal properties similar to that of existing pavement to minimize shear stress in bond. Matching joints with underlying pavement allows structure to move monolithically. Existing joints must be in fair condition or be repaired Timing of joint sawing is important. Cut transverse joints full depth +1/2” and longitudinal joints at T/2. Curing should be timely and adequate, especially near the edge, due to the surface-to-volume ratio and the risk of early-age cracks. Width of transverse joint of overlay to be equal to or greater than underlying crack width of the existing pavement. Pages 4, 12-13

Page 12

Surface Preparation for Bonded Overlay Bonding is Critical Shotblasting Milling

Cleaning the Surface to Prepare for Bonding Sweeping surface followed by compressed air cleaning in front of the paver. Air blasting or water blasting is only necessary to remove material that cannot removed any other way. Water or moisture should not be on the surface prior to paving or de-bonding can occur. Page 13

Pull Off Test (bridges) Bonding is Important: Overlay opening strength (compressive or flexural) can be a good surrogate criteria for bond strength. Maturity methods for strengths can be helpful for early opening conditions. Some states are relying on actual bond measurements to increase confidence in quality of the bond. Accuracy of the test results are sensitive to the how the test is run. Shear Test Pull Off Test (bridges) Page 53

Uses and Advantages- Bonded Overlay of Asphalt or Composite Pavements 2”–5” thickness Use when existing pavement is in fair or better structural condition with surface distress. Use to eliminate any surface defects; increase structural capacity; and improve surface friction, noise, and ride. Where increased traffic requires more structural capacity. Where vertical clearances are needed. Pages 4, 14-17

Bonded Concrete Overlay of Asphalt Pavements Spots of distress that aren’t visible can be determined through evaluation such as the stiffness of the asphalt pavement and subgrade support conditions. Localized areas of weakness can be strengthen through patching. Milling can remove a number of asphalt surface distresses. CONCRETE RESURFACING OF ASPHALT PAVEMENTS Page 14

Bonded Concrete Resurfacing of Composite Pavements Asphalt is a good reflector of underlining concrete pavement condition. A review of the existing profile grade line should be conducted and areas of significant deviation investigated through analysis of core samples in the laboratory. CONCRETE RESURFACING OF ASPHALT PAVEMENTS Page 16

Bonded over Asphalt/Composite Keys to Success Bonding is critical Small square panels reduce curling, warping, & shear stresses in bond (1.5 times thickness). Mill if necessary to correct crown, remove surface distresses, improve bonding. Be sure to leave 3” of HMA after milling. HMA surface temperature below 120 F before paving. Transverse joints must be sawed T/3 Joints in the overlay should not be placed in wheel paths, if possible Application of curing compound or curing methods must be timely and thorough Pages 4, 14-17

Milling: Bonded Overlay of Asphalt or Composite Pavements The three main objectives of milling: to remove significant surface distortions that contain soft asphalt material; to reduce high spots to help ensure minimum resurfacing depth and reduce the quantity of concrete needed to fill low spots; to roughen a portion of the surface to enhance bond development between the new concrete overlay and the existing asphalt. (don’t leave a thin lift) Page 15

Milling: Bonded Resurfacing of Asphalt or Composite Pavements Direct placement without milling is recommended when rutting in the existing asphalt pavement does not exceed 2”. Any ruts in the existing pavement are filled with concrete, resulting in a thicker concrete overlay above the ruts. A minimum of 3"–4" of asphalt should be left after milling because of the reliance on the asphalt pavement to carry a portion of the load. Page 15

Unbonded Overlay System Thicker overlays- real pavement Over concrete, asphalt, or composite Not considered monolithic Existing pavement is considered base Bonding is good! Unbonded Concrete Overlay of Concrete Pavements Unbonded Concrete Overlay of Asphalt Pavements Unbonded Concrete Overlay of Composite Pavements Unbonded Overlay System

Uses and Advantages - Unbonded Overlay of Concrete Pavements 4” - 11” thickness Use when existing pavement is in poor condition or better. Use to restore structural capacity of the existing pavement and increase pavement life equivalent to full-depth pavement. Results in improved surface friction, noise and ride. Overlays 6” or greater have been used successfully on ASR when underlying pavement and subbase are stable. Overlays on “D” crack pavements have had mixed results depending on the amount of localized distress. Pages 5, 18-19

Unbonded on Concrete Can the existing concrete and its subbbase provide a uniform strength platform and, if not, what actions are necessary to obtain that uniformity. Page 18

Unbonded Overlay of Concrete Pavements Keys to Success Full-depth repairs are required only where structural integrity is lost at isolated spots. Separator layer (normally 1” asphalt) is important to isolate unbonded overlay from underlying pavement and minimize reflective cracking. With heavy truck traffic, adequate drainage design may be important to reduce pore pressure in asphalt separation layer. Some states are experimenting with geotextile materials for separation layer. Faulting of 3/8 in. or less in the existing concrete pavement is not a concern when asphalt separation layer is 1 in. or more. Shorter joint spacing helps minimize curling and warping stresses. Transverse joints at 1.5 times thickness for <5” and 2 times thickness 5” or greater up to 15’. No need to match joints with those of the underlying concrete pavement. Pages 5, 18-19

Asphalt Separation Layer Page 18-19

Innovations for Unbonded Overlays -Geotextile Interlayer- 5 mm-17 yrs Page 35

Uses and Advantages - Unbonded Concrete Overlay of Asphalt or Composite Pavements 4” - 11” thickness Restores or enhance pavement structural capacity, resulting in improved friction, reliability, and noise reduction Eliminates deteriorated pavement condition severe rutting, potholes, cracking, shoving, and pumping when composites indicate past D-cracking and ASR, Used when underlying pavements and subbase are stable and uniform except for isolated areas that can be repaired. Pages 5, 20-23

Unbonded on Composite Pavements Tented panels with significant movement can be repaired to relieve the pressure and provide uniform support before construction of an overlay. Faulted panels that do not exhibit continuing movement have proven to provide adequate support for concrete overlays. Edge drains have also been successfully used to reduce the progression of faulting. Pages 5, 22

Unbonded Over Asphalt/Composite Keys to Success Milling may be required to eliminate surface distortions of 2 in. (5.1 cm) or more Complete repairs at isolated spots where structural integrity needs restoring Concrete patches in the existing pavement should be separated from the overlay with a thin layer of fabric or other bond breaker; or joints should be sawed in the overlay around the concrete patch perimeter Surface temperature of existing asphalt pavement should be maintained below 120ºF (48.9ºC) when placing overlay Partial bonding between the overlay and the existing asphalt pavement is acceptable and may even improve load-carrying capacity Pages 5, 20-23