Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
IBL Loading Activity Overview Franck, Maarten, Coralie, Didier Loading tool workshop University of Geneva, Aug 31 st 2011.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Loading and QA activities Introduction, Workflow, Tooling, Tasks UniBe – UniGe regular IBL-Upgrade meeting D. Ferrère Aug, 11 th 2011.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
PROTOTYPE January, 27 th 2016 Valery AKHNAZAROV Diego ALVAREZ Christophe BAULT Andrea CATINACCIO Daniel DOBOS Heinz PERNEGGER Danilo GIUGNI Eric VIGEOLAS.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 IST development status  Seattle  Composite Design.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
IBL project for DT Science-Techno Tea
Detector building Notes of our discussion
T2K Upgrade First look at TPC constraints (WAGASCI)
Ti/SS transitions A.Basti INFN-PISA*
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
WG4 – Progress report R. Santoro and A. Tauro.
Super FGD - Target Design
Phase II Collimators : design status
Presentation transcript:

Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)

Saga of the IBL Staves Topics to be discussed IBL project & its challenges Stave design and its history… Stave manufacturing & Testing From a bare object up to integration What we’ve learnt…(still learning!)

Saga of the IBL Staves IBL project & its challenges Beam pipe Current PIXEL detector IBL location (envelope in blue) PIXEL after de integration @ CERN

Saga of the IBL Staves IBL project & its challenges IBL project is really short in time (driven by LS1) Beam pipe is now part of the IBL Envelopes are tight ( ID=56mm < IBL < OD=85mm…see next!) Tricky operations in the pit (insertion thru 7m long pipe called IST) 14 Staves (detectors) cooled @ -40°C with an evaporative CO2 system IST (ID85mm) IPT (ID58mm)

Saga of the IBL Staves IBL project & its challenges IBL overview 14 Staves (or Local support) arranged cylindrically around the IPT (one of the two key structures, or Global supports) The IST (or IBL Support Tube) is a 6.6m long cylinder tied to the PIXEL The IPT will position the Staves and support their services IST cutout (to look at the IBL package) IPT with services

Saga of the IBL Staves IBL project & its challenges IST and IPT manufacturing challenges IST and IPT manufacturing (both carried out in Seatlle) Material is a prepreg of K13C (same as for Staves!) Driven by weight reduction (extremely rigid CFRP… fiber around 900 Gpa) IST is 0.45mm thick, 6600mm long, 5 segments jointed in a second step IPT is 0.45mm thick, except in its central area (Staves)… 0.325mm thick!! IST prototype segment IPT proto assembly with rings

Saga of the IBL Staves Stave design and its history Main design requirements (Stave) As usual the outstanding features are: Lightweight(X0), Stiffness, Stability Support 2 types of modules to be cooled down to -40°C all way long (650mm) Stave fixation to “Global structure” driven by the IBL insertion into the pit! Radiation hardness for every material (350 MRad at maximum) Overall Stave planarity should be within +/- 150 µm (see later…) Cable bus (flex) bonded to Stave due to tight envelopes Stave IPT

Saga of the IBL Staves Stave design and its history IBL Stave evolution over the last 4 years (coordinated by CPPM Marseille) Based on the PIXEL experience, several concepts have been studied… … on CFRP type for omega shape (M60 vs K13C), carbon foam (Poco vs K9), cooling pipe (CFRP vs Titanium) and the stave shape! Everything led by the material optimization, reliability… and manufacturing

Saga of the IBL Staves Stave design and its history IBL Stave Design and details… A bare stave (w/o module) is 748 mm long 3.5mm thick, and weighs about 26 g Made of 12 parts glued together K9 foam choice after LBNL investigations: Low density (0.22 g/cm3)… but good Thermal conductivity (40 W/m.K) Stave end parts made of peek CF (inspired by PIXEL staves…) CFRP Face plate inserted between foam and Module Prevent TH grease penetration, increase the stiffness, and allow for HV protection (parylene coating)

Saga of the IBL Staves Stave design and its history Some details on design… Developed by Wuppertal, gluing tests on 2 samples (between Ti pipe and foam)… Clearly shows glue penetration issues This led to some new ideas (face plate in K13C/RS3)… thanks to developments by SLAC + Seattle (avoid the grease underneath module to be soaked up by carbon foam) Short length proto by SLAC (tested @ UniGe) Layup of K13C facings (Omega and face plate) [0°/90°/0°] Overall thickness: 195µm (quite thin) K9 CNC machined Tomography of K9 K9 plates from Allcomp

Saga of the IBL Staves Stave design and its history Some details on design… Thermal Grease is scraped over the module surface by means of mask and centering tools (see next) Tested without the face plate (grease tends to be soaked up or diffused into the foam pores) Grease being applied onto the Stave face plate + scraping over the mask… All those testes performed on prototypes led to the validation of the STAVE before mass production Result of thermal grease “footprint” when mask is taken out (in this way, the grease amount is well known)

Saga of the IBL Staves Stave manufacturing & Testing Manufacturing was done in Germany (led by Wuppertal with IVW)… An initial target of 32 bare Staves + 10 protos to be manufactured (a bit less to be loaded at the end of the history) Based on the PIXEL Stave experience (molds, counter molds, CNC machining) Graphite material used for molds … …due to high temperature curing (@120°C)… Co curing was abandoned (material saving OK, but delimitation still an issue… further developments needed! Such a work (12 pieces to be assembled) is long process and difficult for mass prod. Remachining of foam Tomography of first proto PIXEL shape legacy Now it’s a V-shape due to Flex bonding CFRP wrapping @ 12 bars pressure CFRP Omega at 195µm (good homogeneity)

Saga of the IBL Staves Stave manufacturing & Testing Main steps of the Stave manufacturing…. K13C/RS3 prepreg unrolling (for Omega + face plate shaping) K9 foam machining (6 blocks per stave) End blocks machining (peek CF) Stave is complete 12 steps are needed to complete 1 bare Stave (post machining required some fine tuning…)

Saga of the IBL Staves Stave manufacturing & Testing First lessons from the Stave “pre production” step (improvements on fabrication process) Strip on cooling pipes found on 2 staves  vacuum bag removal during stave gluing process was suspected First staves prototypes showed cracks on Omega  Machining process was changed successfully … no crack observed afterwards …

Saga of the IBL Staves Stave manufacturing & Testing Thermal qualification (on “Stavelet” + Stave full length proto) Several dummy staves were tested to select the best design (thermal grease, glue…) 2 final staves equipped with Si heaters + CO2 cooling TFOM (Thermal Figure Of Merit) < 15°C.cm2/W (30°C.cm2/W is the maximum) 350 thermal cycles [-30°C; +40°C], 50 cycles [-40°C; +50°C], 10 pressure cycles [1;66 bars] and pressure shock up to 150 bars! No TFOM change has been seen! Si heaters + thermal sensor (over full length)

Saga of the IBL Staves Stave manufacturing & Testing Some metrology results… An extensive campaign of metrology was done to record any change in planarity before and after thermal cycling (with and w/o Flex glued to the Stave) After Stave Module loading, thermal cycling is performed systematically to select things… so far, the deformations are close to the limits, but still OK! Metrology at UniGe Staves with modules

Saga of the IBL Staves Stave manufacturing & Testing Some detailed FEA were done to “help” designing the Staves The policy was to get several lab working on Stave FEA to X-Check results (CPPM, LAPP, CERN, INFN Milano, UniGe) Both mechanical and Thermo mechanical FEA have been carried out (ANSYS, Abaqus) Tests on prototypes to get to the “MODEL calibration”… Flex Extensive FEA’s to validate the choice of the Face plate option (1 ply, 3 plies, a few cut out at module location…). For ∆T= -60°C, the ∆Zmax =15 µm… instead of 65 µm w/o face plate! No measurement of TH deflection has been done on proto Flex

Saga of the IBL Staves Stave manufacturing & Testing Comparison between Test and FEA (mechanics, simply loaded stave) Stave is held by its handling frame (used from early step to final integration) A concentrated loading is done at the ¼ of stave length (see below) Stave with Flex weights Stave onto the handling frame: “final” boundary conditions … Tends to lift up slightly loading Better than 15 % difference

Saga of the IBL Staves From a bare object to Integration The first phase is about “Module Loading” onto the stave… Aluminum jigs have been designed and successfully tested on the first protos Every step of the process is safely recorded in a Data Base (useful in case of pb) Precision is given by the jig thru the Handling frame Loading jig (main tool) Stave on its handling frame

Saga of the IBL Staves From a bare object to Integration The main steps of the loading process… Now ready for final QA (electrical tests, thermal cycling, metrology…) Repair on module is still doable… but risky!

Saga of the IBL Staves From a bare object to Integration Integration onto the IPT @ CERN (building SR1) Pretty long object (the cooling line brazing is done before integration)… 7m long! A dedicated Integration Stand is under fabrication (UniGe is responsible)… sort of multi purpose object to …Integrate, store, insert thru the IST the IBL package Brazing technique under testing @ CERN + Brazing Stand The Integration stand Multipurpose container (MPC) + Loading stand (central area)

Saga of the IBL Staves From a bare object to Integration Integration onto the IPT @ CERN (building SR1) Stave are assembled first, then the services are connected …and tested! The challenge is to insert a stave with very close neighbors (< 0.9mm clearance… so envelope check will be an issue! Loading stand IBL _ MPC (6.6 m long) Envelope checks IPT Stave Handling frame Loading stand IPT

Saga of the IBL Staves What we’ve learnt… Over the 4 years of manufacturing… Stave manufacturing is a lengthy operation difficult to “duplicate” among institutes (tooling, jigs, know how…)… so to be thought about for the next Upgrades! Material procurement was always tricky (K13C, foam, pipe…)…even if for the layup we took advantage of the IST-IPT business! So many pieces to glue together… but at the end, the result is pretty satisfactory (planarity, rigidity… and close to FEA predictions!). Main drawback is about the brittleness of the Omega + Face plate (due to very high modulus fibers)… special care applied to the post machining Towards the next years… Still some challenges to be faced on Stave Integration (envelope issues) About K13C layup…is it really needed ?? Seems to be “too much”… Think about even thinner cooling pipe, and smaller diameters?? To save further material… Try to optimize the amount of glue… especially at cooling line joint … but the feeling that we are close to some current limits / mechanics…(material, glues, ?) Optimize the links (number of fixations) to the Global structures (like IST) is challenging