BCAL: we’re rolling out the barrel and having a barrel of fun! z. papandreou university of regina presented at the GlueX Collaboration Meeting, held at.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Status of CLAS12 PCAL project
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Scintillating fibre tracker First SHiP Workshop Zurich, 12 June, 2014 Vladimir SHEVCHENKO, on behalf of Kurchatov Institute SciFi group, Moscow, Russia.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PHOBOS TOF Construction Status
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
SPARRO Group, University of Regina 1 Barrel Calorimeter Status Quo Zisis Papandreou University of Regina GlueX Collaboration Meeting JLab, December 11-13,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Z. Papandreou, GlueX Collaboration Meeting, May 11, BCAL Construction First Article work has begun: crew in place.
Tracker Summary Alan Bross MICE CM October 10, 2007.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
GlueX Detector Review, October 2004 BCAL GlueX Detector Review Newport News, Virginia October 20-22, 2004 George J. Lolos University of Regina.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
BCAL R&D Rheanne Filby, Blair Jasper, Gergana Koleva, Blaine Langman, Tasha Summers Vitaly Kovaltchouk, George Lolos, Zisis Papandreou GlueX Collaboration.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
BM&N STS ladders assembly in VLHEP
Plans for this week MWPC: wire stretching today
University of Wisconsin
Upgrade activities at Clermont-Ferrand
SuperB meeting, Frascati
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
SciFi option for neutrino target tracker
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Tagger Microscope Detector & Electronics Status
Status of the EUDET Prototype
HL-LHC upgrade at IPHC news
Plans for the 2004 CSC Beam Test
Presentation transcript:

BCAL: we’re rolling out the barrel and having a barrel of fun! z. papandreou university of regina presented at the GlueX Collaboration Meeting, held at Jefferson Lab january 28, 2009 on behalf of the GlueX-Regina Team: J. Chan, B. Giesbrecht, K. Janzen, S. Katsaganis, D. Kolybaba, S. Krueger, B. Leverington, T. Li, G. Lolos, E. Plummer, A. Semenov, I. Semenova, Y. Sun, K. Vuthitanachot, Y. Yongzhe, A. Heinrichs, L. Sichello, A. Watson

overview schedule & invoicing facilities, personnel, materials, document control fibres: QA testing matrix construction progress procedures transmission uniformity summary Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25,

schedule & invoicing Construction Prototype: signed May 6, 2009 Planned completion date: September 25, 2009; actual October 23, 2009 Production Modules: signed August 7, 2009 Delivery dates: first 4: Feb 10, 2010 now: April 10, 2010 Project Progress Readiness review: JLab inspection/site visit to Regina (Nov 4) quality issues in Construction Prototype → build Module 01 alone Reporting: EVMS, bi-monthly Invoicing: is smoothing out 3 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

facilities, personnel, materials, documents Facilities  Construction 1300 ft 2 ; Fiber & Sensor QA 1100 ft 2  Presses and Swager: operational  Fibre sorting table: operational  Detector lab (two stations): operational  Underground lab (overflow): operational  New Storage (500 ft 2 ): ready Personnel  Construction Manager: Dan Kolybaba; officially on board October 1  Undergraduates:  full time/contract: 4x 12-month Engineering Industrial Interns, 1x Engineering CoOp, 2x 0.5 Physics = 6 (4 of them on construction and 2 on fibre QA), + one permanent staffer (recent B.Sc. graduate) for project’s duration Materials, Machining  Incidentals, Consumables: weekly inventory and replenishment  Fibers: first 8 shipments clockwork; minor packaging and shipping issues resolved!  Lead: first 2 (of 4) large shipment from Vulcan received, 3rd in early Feb, 4th in April - check quantity before 4th  Epoxy: supply regular, contract in place  Spare parts: in hand for everything except swager (JLab will handle)  RMS: 46 top plates + 8 base plates + 2 modules machined, contract will be put in place next week  Crates: disposable, design is done, work on 1st crate starts today! 4 Document Control  Checklists: in place  Hardcopy logbooks: in place  E-log: operational, web access  Excel Worksheets: implemented for build stats, epoxy tracking, fibre tests  Traveler docs: done  Web site: password: operational  Versioning system: in place  Manual: written after 1st 4 modules Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

fibre QA tests First Article: bench reference Production: Condition/packaging (checklist, pictures) Diameter, Spectral Response Attenuation length: LED, photodiode current N pe at 200cm: 90 Sr, PMT, external trigger Contract Specifications: Diameter: 1.00mm, RMS<2% Attenuation length: >300cm, RMS<10% Light output: >3 p.e., RMS<15% 5 Nearly 300,000 fibres on hand! fibres per day at each station Goal is to test ~1% from each shipment Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

fibre spectral response qualitatively the spectra measured at Regina agree with the Kuraray data integrals are close, but shapes are different response is acceptable and scales by distance in a similar fashion spectra from production fibres have been acquired; they look nominal 6 Kuraray brochure Kuraray Batch JS072 Fibre K06-3 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

fibre attenuation length 7 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, but fibres meet specs Category ACategory B Noticeable lot-to-lot variation Large Shipment-to-shipment change nd dye change Kuraray and Regina results track each other

fibre light output 8 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, but fibres meet specs Small lot-to-lot variation Small Shipment-to-shipment change nd dye change Kuraray and Regina results almost track

fibre attenuation-Npe correlation 9 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 Shipments 1-6 Shipment 7 Npe at fibre’s end Npe at fibre’s midpoint

simulated fibre performance spread 10 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 BCAL coordinates attenuation accounted for Poisson + Gauss Negligible effect!

construction prototype Procedure changes (deliberate) Press adjustments, leveling Lunar lander feet No vaseline! →problems Poly sheet, foam rubber, fettuccine 11 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 Difficult, slow, errors made Proven: “surplus” lead/rolling Proven: swaging Proven: procedure changes Proven: press plate contact Poly 0.006”, Rubber 1/8” Lunar Lander feet Front edge Back edge 2 mm

lessons learned Building sensitive to amount of glue, lead shape and lead rolling We have learned and overhauled procedures and re-trained! control glue, changed lead swaging, re-check before laying use alignment posts, runner & wire with the new lead, swaging and laying is going well controlling gluing time and ram sequence Prototype 2: Green-blue fibres jumped lead layer 12 dead fibres? Remarkable build: height within 1mm everywhere! Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 Alignment posts required press anchoring; this contributed to front/back height asymmetry Rubber foam also contributed to asymmetry Lunar lander feet did not help; they have been dropped Back to thicker (2” total) press plate

construction prototype matrix build - visually 13 Side A/B colourSide A/B b/w Blow up Issues: profile mismatch jumped tracks kink in lead sheet Fix: patch Fibre clean up (Machined at RMS, Oct ; traveler docs provided) Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 kink patch

faces - comparison ‘Ruler’ test: spectacularly poor! Effect resembles cross talk ‘Top 40’ layers good except at a few spots We believed we can do even better. JLab believed as well. 14 Side ASide B Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

‘Beauty’ and the ‘Beast’ 15 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 CP Mod 01 ‘orange bands’ Beauty Beast

‘orange bands’ 16 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, have been seen in Prototype 2: BCF-20 fibres CP: SCSF-78MJ fibres Mod01: SCSF-78MJ fibres Nothing remarkable about the Kuraray fibres: attenuation, Npe, spectral nominal Pressing cannot cause this effect Machining cannot either (vertical passes) Gluing preparation appears nominal It could be epoxy oxidation: will check wavelength under UV LED excitation spectral Npe attenuation length

optical transmission setup Objective: measure light transmission through finished modules, in order to test optical uniformity of each module Method: it is based on a 4 x 9 4cm 2 grid, stable (few x ), easy, fast, portable (use at RMS), and yields reproducible results Next: method has been applied to Construction Prototype and soon to Prototype 02 and Module Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 Light source: Winston Cone, UV LED, low voltage supply Readout: Winston Cone, photo-diode, picoammeter Aluminum mask with four sets of bolts to base plate, to allow for overlapping pattern coverage

optical transmission tests 18 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010 Construction Prototype Source: UV LED (380 nm) at 3V (supply in constant current mode) Light intensity at exit of Winston Cone is ~330 μA Measured by taping both WC together Stable: change only in 3rd digit over 30 min Measurements with dry-dry, grease-dry, grease-grease contact: grease necessary at input, makes small difference at output Transmission throughput around 1/100 of incident light

construction - summary & proposal matrix layup facilities are operational; two-press build started in January 2010 students are now fully trained: new, strict protocols lead rolling and runner-post-wire alignment careful placing of thick press plate plus high density polyethylene minus lunar feet epoxy and ram sequence control drawings are near final, travellers ditto transmission uniformity method finalized fibres: within specs module progress: Module 01: machined, transmission tests & traveller pending Module 02: constructed, will be shipped to RMS for machining/transmission/traveller Module 03: construction in progress (near layer 110) Module 04: construction in progress (near layer 20) First four modules to JLab in early April 19 Z. Papandreou & GlueX-Regina Team, GlueX Collaboration Meeting, January 25, 2010

Roll out the barrel, we'll have a barrel of fun Roll out the barrel, we've got the blues on the run Zing, boom, tararrel, ring out a song of good cheer Now's the time to roll the barrel, for the gang's all here Beer Barrel Polka available as ringtone