California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.

Slides:



Advertisements
Similar presentations
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Advertisements

D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CEM-512 Value Engineering Highway Project: South Interchange.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
N.C. Department of Transportation Southeastern Rail Highway Safety Conference Presented by Michael J. Shumsky, P.E. NS/CSXT Mainline Grade Separation November.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Los Angeles City Hall Advance on click. The city hall was built in It is 32 stories high and 454 feet tall. For many years by law it was the tallest.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007 Los Angeles County Metropolitan Transportation Authority.
1 RTD TOD Program University of Denver November 2004.
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
Jason Hade, Regional Planner Kern COG Workshop – November 21, 2002 High-Speed Rail for the Kern Region Kern Council of Governments.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk.
Anaheim Regional Transportation Intermodal Center Project Update.
Department of Transportation Final Recommendation of SR-710 Pasadena Working Group Regarding Proposed Alternatives for SR-710 North Project Council Meeting.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
The Roads Ahead Leroy D. Alloway, Director Community Development.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Los Angeles County Metropolitan Transportation Authority ACEC-LA Luncheon February 12, 2014 Frank Quon, P.E. Executive Officer, Highway Program.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY Municipal Meetings September 2006.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
- Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole February 20, 2008.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
Department of Transportation Submittal of Comments to Caltrans Regarding the Draft Environmental Impact Report/Environmental Impact Statement and Proposed.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
II. Facility Program, A. Providers HOUSTON INTERMODAL CENTER/MULTIMODAL TERMINAL.
Julie A. Gutierrez Assistant City Manager January 13, 2014 City Council Funding for Pasadena Participation in a Five City Alliance to Hire Technical Experts.
CAHSR Board Meeting August 6, 2009 Section Update Los Angeles to San Diego (via the Inland Empire) Slide 1 of 10.
Exposition Light Rail Phase 2 - Recommendation for Alternative Siting of Maintenance Facility within the City of Santa Monica.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
1 The Future of Organics Management in Palo Alto City of Palo Alto Public Works Operations March 8, 2010.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Reno Area / Rail-Transit Options March 24, 2016 Reno Area Rail-Transit Options by Lawrence Meeker HNTB Corporation Reno Area Rail-Transit Options by Lawrence.
Alternative Alignments Public Meeting
Connecting and Transforming California
Potomac Yard Metrorail Station
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Regional Rail What is Missing? Metro-North NJ Transit LIRR
New Public Transport Infrastructure
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
White Flint North Entrance Feasibility Study
AN INVESTMENT IN CALIFORNIA’S FUTURE
Presentation transcript:

California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation

California High-Speed Train Project Program EIR/EIS Designs Existing Union Station L.A. River East Union Station South (Through) Program EIR/EIS completed in 2005 Large number of Union Station options examined: –Existing Union Station –LA River East –Union Station South (Through) –Cornfield Site –LA River West –Union Station South (Stub) Selected Option: –Existing Union Station

California High-Speed Train Project Project EIR/EIS Focused Project EIR/EIS started in 2007 Began by once again looking at large number of station options, including: –Union Station (Aerial and Tunnel) –Vignes Street (Aerial) –West Bank of LA River (At-Grade / Trench) 3 options advanced to Alternatives Analysis –Union Station Aerial –Union Station Deep Tunnel –West Bank of LA River

California High-Speed Train Project Union Station – AA Options Los Angeles Union Station City of LA Piper Technology Center Metro Regional Rebuild Center Metro Red Line Yard Current Metrolink / Amtrak Alignment Proposed LAUS Run-Through Tracks Aerial / Deep Tunnel Options in HST Station Options Above / Below LAUS At-Grade Option into West Bank HST Station Option Los Angeles – Palmdale Alignment Alternatives County Jail Complex Metro Gateway Bldg.

California High-Speed Train Project LAUS Design Options Aerial HST Station West Bank HST Station Deep Tunnel HST Station

California High-Speed Train Project LAUS Design Options West Bank HST Station Aerial HST Station Community Issues to north / south of LAUS Focus on connections to existing transit lines (Amtrak, Metrolink, Metro) Railroad operations issues Eliminated: Property / Community Impacts Deep Tunnel HST Station Eliminated: Constructability HST Station Concept

California High-Speed Train Project Union Station – South Approach South Approach to Union Station has evolved through Study: –Program EIR/EIS Alignment (2005) –5% Design (2007) –10% Design (2008) –15% Design (2009)

California High-Speed Train Project CHSTP – 15% Design at LAUS Metro Regional Rebuild Center County Jail Complex Piper Tech Center Metro Headquarters Building Maintenance Facility

California High-Speed Train Project Page 9 On , LA Metro staff sent PB four possible LAUS platform and track alignments for further evaluation, including two “Vignes Street” alignment options and two re-aligned LAUS elevated track/platform options In November 2009, the Authority agreed to include an alternate LAUS HST station alignment option in the DEIR/EIS A LA City Council resolution requested the Authority to study more than one potential site for the HST station and include a “Vignes Street” alignment City of LA and Metro Requests

California High-Speed Train Project City of LA / Metro Working Group Four concepts submitted by City of LA/Metro for review: –Vignes Street (South) –Vignes Street (North) –Union Station (Skewed) –Union Station (Tight Curve) City and Metro requested the Authority to determine the optimum alternative considering impacts to existing structures & County Jail rebuild plans

California High-Speed Train Project Union Station (Skewed Options) Positives: –Shorter distance to LA River Corridor Negatives: –Structural support of skewed platforms –Conflicts with Metro Gold Line –Tighter curves to north of station Conclusion: Skewed options are not viable

California High-Speed Train Project Vignes Street (South) Positives: –Shorter distance to LA River Corridor –Fewer construction impacts to existing Union Station tracks Negatives: –Impacts to Metro headquarters, Metro Maintenance Facility, LA County Jail –Tighter curves to north of station –Longer connections to Metro Rail, Metrolink, Amtrak –Complex bridge design over US-101

California High-Speed Train Project Vignes Street (North) Positives: –Shorter distance to LA River Corridor –Fewer construction impacts to existing Union Station tracks Negatives: –Impacts to Metro headquarters, Maintenance Facility, LA County Jail –Tighter curves to north of station –Longer connections to Metro Rail, Metrolink, Amtrak LA-A Project Team refined both “Vignes” Concept Designs – Option 1 and Option 2

California High-Speed Train Project Vignes Street Design Option #1 Metro Regional Rebuild Center County Jail Complex Piper Tech Center Metro Headquarters Building Maintenance Facility

California High-Speed Train Project Vignes Street Design Option #2 Metro Regional Rebuild Center County Jail Complex Piper Tech Center Metro Headquarters Building Maintenance Facility

California High-Speed Train Project Staff Recommendations Vignes Design Option #1 appears to have fewer impacts than Option #2 and is therefore recommended to be added and evaluated through the DEIR/EIS as a design alternative Further refine/evaluate 15% Design Aerial LAUS Option to minimize impacts to Arts District (Design Option #3)

California High-Speed Train Project Union Station (Tighter Curves) Positives: –Fewer impacts south of US-101 Negatives: –Lower Operating Speeds Potential modification to 2009 design is similar to this concept but has acceptable curve radii and operating speeds but crosses above 1 st Street Bridge

California High-Speed Train Project Union Station Design Option #3 Metro Regional Rebuild Center County Jail Complex Piper Tech Center Metro Headquarters Building Maintenance Facility

California High-Speed Train Project Next Steps Advance/evaluate LAUS Design Options: –Further evaluate Vignes Street Design Option #1 –Further evaluate Design Option #3 (Aerial LAUS Option with tighter curves to minimize impacts to Arts District) Revise/issue Administrative Draft EIR/EIS – Spring 2010 incorporating the two “best” LAUS HST Station alternatives