1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.

Slides:



Advertisements
Similar presentations
BRINGING MOBILITY TO CONTRA COSTA COUNTY PRESENTATION TO THE CONTRA COSTA COUNTY BOARD OF SUPERVISORS APRIL 16, 2013 Randell H. Iwasaki Executive Director.
Advertisements

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Steve Heminger Executive Director Metropolitan Transportation Commission Greater Vancouver’s Livability Forum June 1, 2009 TOLL: The Four Letter Word of.
Smart Growth: Big and Small Steps in the Bay Area Steve Heminger, Executive Director Metropolitan Transportation Commission National Governors Association.
Transportation 2030 Plan for the San Francisco Bay Area Steve Heminger, MTC Executive Director Sue Lempert, MTC Commissioner San Mateo Cities & Counties.
The Carquinez Strait Bridges The Future of Northern California By Jennifer Moore May 12, 2003.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
Steve Heminger Executive Director Metropolitan Transportation Commission Transportation Research Board Executive Committee June 17, 2005 TOLL: The Four.
Developing a Regional Express Lane Network Hercules City Council Meeting April 28, 2009 Doug Kimsey MTC Planning Director.
Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.
Transportation 2030 Plan for the San Francisco Bay Area: Action Plan Update.
Innovative Financing Schemes Steve Heminger Executive Director, MTC Sonoma Transportation Summit June 21, 2006.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
MTC Advisors Orientation September 5, Welcome… …and thank you, for serving as an advisor and working with MTC on “regional” transportation issues.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Regional Transportation Emergency Management Plan BARCFirst, BENS & BRMA Joint Infrastructure Symposium June 25, 2009 Radiah T. Victor, Sr. Program Coordinator.
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
The Bay Area Transportation Challenge: An Overview Steve Heminger Executive Director Metropolitan Transportation Commission September 2007.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California Municipal Finance Conference April 3, 2006 Steve Heminger Executive.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
1 Transit Efficiency & Effectiveness: Is There Another Way to Skin the Cat? Commission Workshop Steve Heminger May 25, 2006.
Bay Area Earthquakes – Utility & Lifeline Issues Bay Area Earthquakes – Utility & Lifeline Issues JEANNE PERKINS Consultant, ABAG Earthquake and Hazards.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
Challenges and Choices San Francisco Bay Area Long Range Plan Therese W. McMillan Deputy Executive Director, Policy Metropolitan Transportation Commission.
Steve Heminger Executive Director Metropolitan Transportation Commission May 2010 Financing California’s Transportation System.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
A New TOD Policy for Regional Transit Expansions Steve Heminger Executive Director March 11, 2005.
Local Pots of Gold Local Pots of Gold Maintaining Fiscal Constraint for Local Funds in the TIP Srikalyani Srinivasan Metropolitan Transportation Commission.
Achievements & Challenges Contra Costa County Transportation Town Hall May 25,2006 Bay Area Transportation:
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
B A Y A R E A T O L L A U T H O R I T Y 1 Toll Increase Recommendation for the State-owned Bay Area Bridges BATA Oversight Committee January 13, 2010.
1 Regional Measure 2: Capital Program Update October 14, 2009 Programming and Allocations.
1 Round One Public Outreach Workshops Fall 2005 Presented to: Women’s Transportation Seminar 2007 Annual Conference May 2, 2007 Presented by: Therese McMillan.
A Strategy to Improve Public Transit with an Environmentally Friendly Ferry Service San Francisco Bay Area Water Transit Authority Implementation and Operations.
Funding Infrastructure in A Weak Economy TRANSPORTATION: Funding Infrastructure in A Weak Economy Steve Heminger Executive Director, MTC California Institutional.
1 Climate & Transportation: Change is Coming Steve Heminger Executive Director Metropolitan Transportation Commission December 2010.
Metropolitan Transportation Commission & Bay Area Toll Authority January 19, 2006 Steve Heminger Executive Director Metropolitan Transportation Commission.
Steve Heminger Executive Director, MTC AMPO Annual Conference Washington, D.C. – October 23, 2003 Playing in Traffic: A New Look at Management and Operations.
Opportunity Knocks Creative Funding Approaches From The San Francisco Bay Area Therese W. McMillan Deputy Director, Policy Metropolitan Transportation.
Transportation Planning: A Field in Flux Steve Heminger, Executive Director Metropolitan Transportation Commission April 2004.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Bay Area Toll Bridges By: Rachel Sanders and Zeltzin Lucas.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
1 Caltrans District 4 - ABAG Workshop - INFRASTRUCTURE INTERDEPENDENCIES January 31, 2012 California Department of Transportation (Caltrans) www. dot.ca.gov.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Transportation 2035: S.F. Bay Area Targeting Health through Environment Metropolitan Transportation Commission Therese W. McMillan, Deputy Executive Director,
B A Y A R E A T O L L A U T H O R I T Y 1 Toll Increase Options for the State-owned Bay Area Bridges BATA Oversight Committee Public Hearing on Proposed.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Transportation Infrastructure Perspective Ross Chittenden Deputy Executive Director, Contra Costa Transportation Authority.
I-80 California Goods Movement
21st Century Transportation Committee Finance Subcommittee
Playing in Traffic: A New Look at Management and Operations
Transportation System Management & Intelligent Transportation Systems
SB 1 Funding Overview and Regional Impacts
Major Initiatives in Hampton Roads
Presentation transcript:

1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director

2 Back to the Future?  California Toll Bridge Authority  Separate from the California Division of Highways – predecessor of Caltrans

3 Bay Area’s Network  The Metropolitan Transportation Commission (MTC) is the regional transportation planning organization for the San Francisco Bay Area  400 miles of carpool lanes  1,400 miles of highway  19,000 miles arterial streets  7,000 miles of transit routes

4 Bay Area’s Toll Bridges  The Bay Area Toll Authority (BATA) oversees seven state-owned toll bridges in the San Francisco Bay Area  San Francisco-Oakland Bay  San Mateo-Hayward  Dumbarton  Richmond-San Rafael  Carquinez  Benicia-Martinez  Antioch * * Golden Gate Bridge owned and operated by the Golden Gate Bridge, Highway and Transportation District (GGBHTD)

5 Bay Area’s Toll Bridges

6 Toll Structure and Revenues  Toll Structure  Regional Measure 1 (1989)$1  Seismic Surcharge (1998)$1  Regional Measure 2 (2004)$1  Seismic Surcharge (2007)$1 Total Auto Toll $4  Annual Toll Revenues  Regional Measure 1 (1989)$130 M  Seismic Surcharge (1998)$120 M  Regional Measure 2 (2004)$120 M  Seismic Surcharge (2007) $120 M Total Annual Revenues$490 M

7 Earthquakes  1989 Loma Prieta  6.9 Magnitude  60 miles from SF

8  $8.7 Billion Retrofit Program on the following bridges:  San Mateo-Hayward (2000)  Carquinez (2002)  Benicia-Martinez (2002)  Richmond-San Rafael (2005)  San Francisco-Oakland Bay (Under Construction) Toll Bridge Seismic Retrofit Program

9 Seismic Retrofit Program Status Seismic Retrofit Projects- AB144 Budget (7/2005) Current Forecast Budget (4/2008) Variance San Francisco-Oakland Bay Bridge East Span Replacement 5,487 5, San Francisco-Oakland Bay Bridge West Approach Replacement San Francisco-Oakland Bay Bridge West Span Seismic Retrofit Richmond-San Rafael Bridge Seismic Retrofit Benicia-Martinez Bridge Seismic Retrofit Eastbound Carquinez Bridge Seismic Retrofit San Mateo-Hayward Bridge Seismic Retrofit Other Costs192 0 Program Contingency Total (in $ millions)8,685 0

10 SFOBB East Span Seismic Safety Replacement Project Skyway SAS YBI Transition

11 SFOBB East Span Seismic Safety Replacement Project

12 Oakland Touchdown Contract

13 Oakland Touchdown Contract

14 Skyway

15 SAS E2/T1 Foundations

16 SAS T1 Tower Foundation

17 SAS Contract

18 SAS Contract

19 Yerba Buena Island – Labor Day 2007

20 Yerba Buena Island Detour Contract

21 Yerba Buena Island Detour Contract

22 SFOBB West Approach Project

23 SFOBB West Approach Project

24 Accountability  AB 144 established the Toll Bridge Program Oversight Committee, composed of Director of the California Department of Transportation (Caltrans), and the Executive Directors of the California Transportation Commission (CTC) and the Bay Area Toll Authority (BATA), to be accountable for delivering the SRP. WILL KEMPTON Director California Department of Transportation STEVE HEMINGER Executive Director Bay Area Toll Authority JOHN F. BARNA, JR. Executive Director California Transportation Commission

25  $2.4 Billion Congestion Relief and Capital Improvement Program including: Regional Measure 1 Program  San Mateo-Hayward Bridge Widening (2003)  New Carquinez Bridge (2004)  Richmond-San Rafael Bridge Trestle Replacement (2005)  Richmond-San Rafael Bridge Deck Overlay (2006)  New Benicia-Martinez Bridge (2007)  I-880/SR-92 Interchange Reconstruction (Construction)

26 Regional Measure 1 Program Status

27 New Carquinez Bridge (2003)

28 Benicia-Martinez Bridge (2007)

29 Benicia-Martinez Bridge (2007)

30 880/92 Interchange Project

31 Regional Measure 2 Capital Project Program Project Funding (in $ millions) Ferry Programs$197 Bus Programs$157 Transbay Terminal$150 BART Tube Seismic$143 Dumbarton Rail$135 Interstate 80/680 Improvements$100 E-BART Extension$96 BART-Warm Springs$95 Interstate 580 Corridor$65 Caldecott Tunnel 4 th bore$51  The RM2 funding program is primarily oriented towards transit alternatives  RM2 provides partial funding to projects, balance provided by project sponsor  If funding or project fails, BATA can reallocate funding to different project in the same bridge corridor

32 Regional Measure 2 Operating Program  RM2 provides a key source of funding for a variety of new transit services  Operating cost payments are subordinated to debt service Project Annual Funding Cap (in $ millions) Regional Express Bus (S)7.4 Alameda Ferry7.2 Dumbarton Rail6.2 Regional Express Bus (N)3.9 Albany Ferry3.6 South SF Ferry3.4 Vallejo Ferry3.1 Water Transit Administration3.0 AC Transit3.0 Muni Metro2.5 Golden Gate2.4 Owl Bus2.1 Napa Transit0.4

33 BATA’s Debt Portfolio  Current BATA debt portfolio is $5.2 billion  $2.3 billion fixed rate debt  $2.9 billion variable rate debt  The weighted cost of the entire “AA” portfolio is $ 4.20%, as of May 2008  BATA’s goal to deliver the entire $12 billion toll construction program within the $4.00 toll structure DebtPrincipal (in $ millions) % Fixed2,30044% Variable2,90056% Total Debt5,200

34 BATA’s Efficient Credit 9/24/ /24/2004 1/24/20053/24/20055/24/20057/24/20059/24/ /24/2005 1/24/20063/24/20065/24/20067/24/20069/24/ /24/2006 1/24/20073/24/20075/24/20077/24/20079/24/ /24/2007 1/24/20083/24/20085/24/2008 RESET DATE RATES PRO FORMA TARGET ROLLING AVERAGE ALL IN COSTS RBI BENCHMARK

35 BATA’s Strong Credit RatingOutlook FitchAA-Stable Standard and Poor’sAAStable Moody’sAa3Stable

36 FasTrak ® Electronic Toll Collection System

37 Strong FasTrak ® Account Growth

38 Increasing FasTrak ® Usage

39 Expanding FasTrak ® Options

40 Regional HOT Network  HOT Network introduces pricing; revenue pays to expand carpool lane and express bus systems  Demonstration HOT lanes in Alameda, Santa Clara Counties 40

41 Regional HOT Network Study  HOT network could:  Help manage HOV lanes  Reduce delay and emissions  Be phased in by 2025  Pay for itself over 30-years, freeing up STIP revenue  Must be approached as a regional network  New institutional arrangements required for governance and revenue pooling

42 Unfinished Business  Dumbarton and Antioch Bridge Retrofits  Bike/Pedestrian Access – 2 ½ bridges to go  Regional Measure 3  Open Road Tolling  Asset Ownership?