1 The Peninsula Subdivision For The Hampton Roads Partnership Quintin C. Kendall Resident Vice President—State Government Affairs July 17, 2009.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

KEVIN B. PAGE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION VIRGINIAS RAILROADS A STAKEHOLDER IN TRANSPORTATION DEVELOPMENT.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
STATE OF NEW YORK Andrew M. Cuomo Governor New York State DOT Joan McDonald Commissioner Presentation by NYSDOT to the Transportation Border Working Group.
1 LIMBA Presentation November, Project Overview Brookhaven Rail Terminal: Contributing to Long Island’s Freight Transportation Future U S Rail of.
Railroads and Ethanol Association of American Railroads September 27, 2007.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
California Transportation Commission Glendale, California July 25-26, 2007 Business Plan 2008 Capitol Corridor Joint Powers Authority (CCJPA)
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Oregon Passenger Rail EIS Project Leadership Council Hal Gard, Rail Administrator, ODOT John Sibold, Cascade Rail Corridor Director, WSDOT Salem, OR June.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
CSX’s I-95 Corridor for the Virginians for High Speed Rail March 13, 2007.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
High Speed Rail on the Horizon State Public Transportation Partnerships Conference Westin Hotel, Seattle, WA August 3 - 5, 2010 Paula Hammond Secretary.
Port of Oakland. Northern California’s ‘Capitol Corridor’ on Union Pacific Railroad The busiest intercity passenger route in the country outside the NEC.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
1 1 1 Partnering with the Freight Railroads – Passenger Service SCORT – 2009 National Meeting September 21, 2009 Partnering with the Freight Railroads.
1 1 CRTPA Board Meeting 09/20/2010. CSX Corporation (NYSE: CSX) CSX Transportation – serves every major population and industrial center east of the Mississippi;
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
An Introduction to AIPRO for the members of AASHTO/SCORT March 15, 2011.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
1 Rail Infrastructure Spending Railroad investments to meet growing demands Brian Sweeney BNSF Railway International Legislators Forum Deadwood, SD June.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Modeling the Interaction Between Railroad Freight Schedule Adherence and Asset Utilization Yan Dong* Joseph M. Sussman** Carl D. Martland** * Transport.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Northeast Corridor - Overview Regional Plan Association Spring 2010.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Texas Freight & Rail Studies Mark Werner, P.E. Transportation Planning & Programming Multimodal Section.
Drive Safe Hampton Roads Thelma Drake, Director September 27, 2013.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
U.S. Freight Railroad Infrastructure: Current and Future Issues Craig F. Rockey Vice President - Policy and Economics Association of American Railroads.
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Northern Lights Express Minneapolis-Duluth/Superior Passenger Rail Alliance December 16, Northern Lights Express Minneapolis-Duluth/Superior Passenger.
Summary and Wrap-up Discussion 8 July 2015
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Linking Northern, Central and Southern California to the world and the nation.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
March 31, 2016 Area Transportation Partnership Fergus Falls, MN.
VA/NC Compact Passenger Rail Update Kevin Page Chief Operating Officer Rail and Public Transportation January 9, 2012.
Virginia Rail Program Update Virginia-North Carolina High Speed Rail Compact Commission Meeting March 21, 2016 Jennifer Mitchell Agency Director.
Status of the Rail Industry Presented to the General Services Administration Washington DC March 2015.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Michigan Update Michigan Association of Rail Passengers
2017 SCORT Conference Washington, DC
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
AASHTO Spring Meeting Portland, Maine May 2017 Jennifer W
APTA High Speed Rail Policy Forum December 2, 2015
VIRGINIA RAILWAY EXPRESS
March 31, 2016 Area Transportation Partnership Fergus Falls, MN
About Rio Grande Pacific Corporation
Presentation transcript:

1 The Peninsula Subdivision For The Hampton Roads Partnership Quintin C. Kendall Resident Vice President—State Government Affairs July 17, 2009

2 2 2 Status of Peninsula Passenger Rail Service, Pre-Stimulus  Newport News is currently served by two Amtrak train sets  Phase I of Virginia State Rail Plans contemplated extending three additional Washington-Richmond regional trains to Newport News, for a total of five daily trains, by 2015 and an additional four trains providing hourly services during peak periods by 2020  New service assumed Richmond Terminal improvements, new station at Newport News, operating speeds of 70 mph and on-time performance greater than 85%  $14 million available to fund 30% preliminary engineering and design for needed capacity projects between Fredericksburg and Newport News, but no funding programmed for $ million necessary for construction

3 3 3 Status of Peninsula Passenger Rail Service, Post-Stimulus  An additional $10 million secured for 30% preliminary engineering and design for Richmond area  Virginia’s stimulus proposal accelerates RF&P capacity projects (third/fourth main lines) and Richmond area improvements, which were originally planned to begin in 2012  Stimulus proposal also includes Hampton Roads service, with no specified alignment, pending completion of Tier I Draft EIS this summer  Cost estimates between $330 million and $844 million depending on route and service  Improvements necessary to accommodate higher speed rail will require extensive modeling to ensure proper capacity is added  Higher speed rail requires more capacity, Class 6 track, signal upgrades; appropriate scheduling will critical for introduction of any new service

4 Of the 57 daily Amtrak trains operated on CSXT, the Newport News trains are some of the poorest performers

5 Any given train’s performance is largely driven by three factors  Physical characteristics of the operating territory – Single/double track? – Signal System?  The operating mix of train traffic – How many trains? – What kinds of trains?  The validity of schedules – Can they be reliably maintained? – Do they adjust for known activities?

6 CSXT’s DC to Richmond segment – the RF&P – is one of our busiest multi-use, double track corridors  110 miles of double track with centralized traffic control  48 daily passenger/commuter trains – 18 Amtrak trains – 30 VRE commuter trains – 38 daily MARC trains adjacent to line  daily freight trains

7 In contrast to the DC to Richmond segment, the corridor from Richmond to Newport News is 61% single track  Single and double track with Automatic Block Signals  Amtrak trains – 4 Richmond to Newport News  Freight Trains – 12 – 15 Fulton to Newport News – 16 – 27 Rivanna Jct to Fulton – Predominantly coal trains up to 1.5 miles in length – Moving far slower than Amtrak

8 The differences in actual and minimum run time, and speeds, are much larger on the Peninsula than on the RF&P  Limited infrastructure  Maintenance work affects all operations on single track  Reliability low for both passenger and freight trains, but freight train impacts are extreme

9 Speed Differentials: An Illustration Coal Train 1 50 mph Track A Coal Train 2 50 mph Track B Passenger Train 79 mph 44 miles

10 Passenger Rail Reliability on Peninsula Subdivision revolves around CSX coal volume  The recent surge in export coal was totally unanticipated – Unprecedented year over year growth from 2007 to 2008  Followed decade-old trend of significantly declining loads – In 2006, NPN coal exports dipped to their 3 rd lowest level in 25 years – Accordingly, planners programmed scarce capital maintenance dollars for other, more needy areas (More on this later) 3 rd Lowest in 25 Years 4 th Highest in 25 Years

11 Congestion in Richmond needs to be addressed to ensure reliable service to the Peninsula  Conflicting routes – North-South: Intermodal, merchandise, unit, and passenger trains – West-East-West: Coal moves between Clifton Forge & Newport News; returning empties via BBRR – West-South: Coal moves between Clifton Forge and Wheelwright/Hopewell – West-North: Coal moves between Clifton Forge and RF&P destinations  Grain run-arounds at Fulton Yard  Turning locomotives at AY  Industrial switching  Amtrak moves over SAY

12 Passenger service between Richmond Staples Mill Station and Newport News has significant issues. The key to improving performance and adding more Amtrak service is to reduce the potential conflict locations  Richmond Terminal — Fulton  Newport News Terminal  Peninsula Subdivision — Acca

13  Currently a single track route by Acca  Crosses flow at AY  Single track Bellwood Sub – Rivanna Connection route Acca Yard Passenger movements today have conflict areas  New East Side Acca Bypass  Double Track Bellwood Sub – Rivanna Sub Connection Route

14 Fulton Yard Area passenger movements offer similar challenges  Main on north side of the yard is operated under ABS Rule 251 Egypt to R Cabin  New 3 rd Main to be constructed between R Cabin and Beulah  Parallel movement for: – Newport News and Fulton turn trains – BBRR/Clifton Forge bound trains – Amtrak trains  Tide / Passenger  BBRR / Passenger New 3 rd Main

15 Potential Peninsula Sub conventional rail improvements include new sections of double track and universal crossovers  Double Track connecting Newport News Terminal to Oriana with new universals at Hampton Roads and Oriana– provides 25 miles of continuous DT to Toppings.  A new DT segment at White Oak with center universal crossover.  Universal crossovers added to the Norge – Diana DT segment. New Univ. Crossovers

16 The focus in Newport News is to eliminate the interaction between coal and passenger movements  Today, Amtrak passengers detrain on the south side of the terminal  Equipment must be repositioned to the north side for storage  The proposed configuration redirects all passenger activity to the northern side of the property

17 Guidelines for Partnerships to Expand Co-Mingled Freight and Passenger Rail  Access to host railroad track and property must be negotiated between the parties on a voluntary basis  Designing for safety is paramount and separate tracks will be needed to segregate freight and conventional passenger rail from high speed rail at sustained speeds in excess of 90 mph  Service to rail freight customers must be reliable and protected and cannot be compromised; adequate capacity must be maintained and, in some cases, built to address future freight growth

18 Guidelines for Partnerships to Expand Co-Mingled Freight and Passenger Rail  New infrastructure design must fully protect the host railroad’s ability to serve its existing customers, both passenger and freight, and locate future new freight customers on its lines  Host railroads must be adequately compensated, especially in regard to the significantly higher maintenance cost associated with enhanced track infrastructure that will be required for high speed rail  Host freight railroads need to be fully protected against any and all liability that would not have resulted but for the added presence of high speed passenger rail service