Brewery Cogeneration A Cogeneration Solution For A Medium Size Brewery Presented by: Oliver McRae Professor: Xi Lin ME304 – Energy & Thermodynamics Wednesday,

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

WHAT IS STEAM PRO? Thermoflow, Inc.
Lecture 05: Chapter 2 Review
DIRECTION DE LA RECHERCHE Marc FLORETTE Jeudi 29 mai 2008 The advantage of mCHP as a high efficiency gas solution for the residential market Gas industry.
ISAT Module V: Industrial Systems
Financial Model.
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
Exhaust Heat Recovery Systems
Heat Recovery for Commercial Buildings
Technical Conference Avoided Cost Modeling January 6, 2015.
Turbinator Electric CHP Team of Ammonia Based Fertilizer Production
Professor: Jeffery Perl Mentor: Dennis O’Brien Team Members: Jinrong Chen, Kei Simmel, Hantao Wang, Marzena Zarycki Scribe: Kei Simmel.
By Mark Foley.  Combined Heat and Power is the generation of electricity and usable heat simultaneously from the same fuel input.  Electricity primarily.
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Generation and Control of Vacuum in Furnace
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Steam Generation Efficiency
Capture of Heat Energy From Diesel Engine After Cooler Circuit (2006 Annual Report) Mark Teitzel Alaska Village Energy Corporation
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
“Energy Efficiency Guide for Industry in Asia”
Marine Steam Power Plant Heat Balance By Steven Gelardi
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
CHAPTER 6 Estimation of Manufacturing Costs Don Scott ENCH 430 2/7/06.
Energy Recovery System Hadi Fattah Chris Korkuch Scott Lacey Ryan Neary Colin O’Neill.
ECO for Fuel Economy and Emissions Reduction – Proven to Reduce total fuel burn, Decrease Particulate and GHG emissions – Apply to Power, Transport or.
POWER GENERATION TECHNOLOGIES
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Cogeneration.
Professor: Jeffery Perl Mentor: Dennis O’Brian Team Members: Jinrong Chen, Kei Simmel, Hantao Wang, Marzena Zarycki Scribe: Hantao Wang.
Turbinator Electric CHP Team of Ammonia Based Fertilizer Production
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Resource Utilization Analysis Fuel Selection Steam Demands Combined Heat and Power.
Operation and Maintenance
Quantifying Cycle Isolation Losses and Integration with On Line Systems Feedwater System Reliability Users Group 2015 Meeting San Antonio Ken Porter Rich.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Unit 4 Exercise – Gas Vapour and Combined Power Cycle
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
\ ME 200 L32 Today’s Class 8.3 Exams not picked up this week may be recycled! \ ME 200 L32 Utility Power Generation Self Study Assignment 8.2 Today’s Class.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Carbon Neutral Energy from Waste Gasification Presented by Allen Medearis and Trip Dacus April 14, 2010 University of Tennessee at Chattanooga.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
Circular Flow of Income
Professor: Jeffery Perl Mentor: Dennis O’Brian Team Members: Jinrong Chen, Kei Simmel, Hantao Wang, Marzena Zarycki Scribe: Hantao Wang.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Energy Management and Planning MSJ0210 Energy generation 2 Eduard Latõšov.
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Investment Appraisal. A means of assessing whether an investment project is worthwhile or not Investment project could be the purchase of a new PC for.
Thermal Energy Storage Thermal energy storage (TES) systems heat or cool a storage medium and then use that hot or cold medium for heat transfer at a later.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
1 11. PROFITABILITY EVALUATION OF NEW POWER PLANT ALTERNATIVES Asko Vuorinen.
Innovations in low temperature heat to power generation Prof. Jeremy Miller Group Research and Solutions Manager.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Energy Management and Planning MSJ0210
Exhaust Heat Recovery Systems
Seminar On Energy Audit Submitted To: Submitted By:
Process Economics Factors that affect profitability
PRIEN / PIAA Meeting April 30, 2009 Pfizer Caguas
Thermodynamics Cycles.
Power Plant Technology Energy Conservation in Power Plants (Lecture 2)
A biomass based 5 MW power plant operates on fuel wood
Results of the European Chemical Industry 2015
Biomass-fired combined heat and power for district heating
Heat Pumps For Energy Efficient / Economical Hot water Generation
Lecture Objectives Review what we learned about Eclectic Energy Production Learn about Thermal Comfort Introduce Psychrometric Chart.
Generation of Eco-friendly Steam in Power Plants
Presentation transcript:

Brewery Cogeneration A Cogeneration Solution For A Medium Size Brewery Presented by: Oliver McRae Professor: Xi Lin ME304 – Energy & Thermodynamics Wednesday, October 16 th, 2013

Agenda  Background  Project Definition  Data Acquisition, Interpretation & Equipment Selection  Thermal Calculations  Financials  Questions & Feedback 2

Background An Overview Of The Energy Sector In Jamaica 3

The electricity sector in Jamaica is in dire straits.  Equipment is aging and results in inefficient power generation.  Fuel cost is high.  Energy theft.  Affects many industries:  Healthcare.  Education.  Manufacturing.  Almost all civil services.  Stagnates economic growth. 4

Project Definition Crafting An Engineering Solution For High Cost Energy 5

Red Stripe suffers financially because of the cost of energy.  Red Stripe Jamaica Limited is the Brewer of the world renowned lager, Red Stripe.  Power comes from the Jamaica Public service Company.  Number six heavy fuel oil (process steam) is purchased from the single local refinery PetroJam.  High electricity and process steam requirements. 6

Data Acquisition, Interpretation & Equipment Selection An Examination Of Electrical Demand Requirements & How To Meet It 7

Data from the SCADA system was extracted and examined. 8 Red Stripe Energy Requirements Electricity HFO 1,466,282 kWh/MonthTotal Steam 24,069,189 kg/year 17,595,382 kWh/YearTotal Fuel 2,358,095 liters/year 7,266,076,727 Btu/month 87,192,920,720 Btu/year

Two 1.131MW gensets are needed based on the energy requirements. 9 Electricity Mean Power Requirement2,007.2 kW Max Available2,262.0 kW Propane Air mixer60.0 kW Required17,595.4 MWh Required with mixer18,121.3 MWh Max Available19,828.7 MWh Capacity Factor95 % Max Available with cap18,837 MWh Average Genset load96.2 % Efficiency41.5 % Fuel required for electricity148,994,181,758 Btu/year

The GE Jenbacher JMS 416 is selected because it meets the requirements. 10 Electrical output1131 kW Recoverable Thermal output 120C1155 kW Energy input2636 kW Fuel consumption277 m3/hr Electrical efficiency42.9 % Thermal efficiency43.8 % Total efficiency86.7 % Exhaust gas mass flow rate, wet5,993 kg/hr Exhaust gas volume, wet4,734 m3/hr

Thermal Calculations The Determination Of The Amount Of Process Steam Available From The Engine 11

Calculating steam enthalpy. 12 Steam Enthalpy Water Steam 95C175.4C, 9 bar Enthalpy398,102 J/kg2,773,900 J/kg Enthalpy Difference 2,375,798J/kg Enthalpy Change Required Btu/kg Boiler Efficiency 84% Btu/kg Yearly Steam Demand kg Mean Hourly Steam Demand kg/hr Actual Mean Hourly Steam Demand kg/hr

Calculating enthalpy of incoming and outgoing exhaust gas. 13 Exhaust Gas Enthalpy Temperature (K)OxygenCO2Nitrogen 5%17%78%Composition 66319,97325,31419,476Molar Enthalpy ,75412,07410,709Molar Enthalpy Molar Mass Exhaust Enthalpy 1, Parts Exhaust Enthalpy 2, Parts Part Enthalpy Part Enthalpy kJ/kgExhaust Enthalpy kJ/kgExhaust Enthalpy 2

Energy rate balance. 14 The following formula was used to calculate the available saturated steam at the required pressure of 9 bar.

Allocating both engine available steam and additional steam. 15 Primary Heat Exchanger Process Streams Exhaust Gas Water/Steam Mass Flow RateTemperatureEnthalpy Mass Flow RateTemperatureEnthalpy Incoming Outgoing Process Steam Available from engine1503kg/hr Additional Fuel for Steam 84% efficiency3,331,476Btu/hr Additional Steam required1243kg/hr 29,203,718,954Btu/year Total fuel required178,197,900,712 Btu

Financials The Confirmation Of The Quality Of This Investment 16

Financial metrics validate the undertaking of the project.  Year 0 ~$401,000,000  IRR Using Future Cash Flows = 83.8%  Savings increase yearly.  Payback happens within two years. 17

Current charges in Jamaica. 18 Current Electricity per year17,595,382kWh Elec Cost per Kwh$34.88JMD Total Elec Cost613,814,481JMD HFO energy content36,976Btu/L Liters of HFO Liters HFO Cost per liter$76.34JMD HFO Cost$180,016,972JMD Total Energy Cost$793,831,453JMD

Projected Project fuel costs in Jamaica. 19 Propane Energy content24,225Btu/L Fuel required7,355,950Liters Cost per Liter$48.00JMD Total Fuel Cost353,085,624JMD Total Energy Costs Prime Power398,909,361JMD

Project experiences payback in 15 months with a strong IRR. 20 YearYear 0Year 1Year 2 Fuel $0$264,814,218$367,209,049 O&M $0$34,367,803$47,198,449 Expected Expenditure using current procurement $0$793,831,453$817,646,397 Capital Outlay $400,886,720$0 Money Paid to Utility $0$198,457,863$23,031,475 Operating Savings -$400,886,720$296,191,569$380,207,424 Total Cost for Year $400,886,720$497,639,884$437,438,973 Net Cash Flow -$400,886,720$296,191,569$380,207,424 Net Internal Rate of return 83.8 % Payback Period 15.3months *Abbreviated from 6 years

Next Steps Acquire More Data From Red Stripe Get More Accurate Data From Manufacturers & Model System With Additional Equipment (eg. Steam Accumulator) Add More Variables To Increase Accuracy Investigate Grid Tie Solution Implementation 21

Questions & Feedback 22