E: Track II Project level analyses Robert Lempert, RAND 1.

Slides:



Advertisements
Similar presentations
D: Initial Uncertainty Analysis for Water and Energy Sectors Robert Lempert, RAND Nicholas Burger, RAND 1.
Advertisements

The Energy-Water Nexus Bringing Together Different Perspectives Water Climate change is a key driver of water systems. Current focus is water sufficiency.
David Purkey, SEI Rob Lempert, RAND
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Financial Model.
B280F Introduction to Financial Management
Scenario Discovery Robert Lempert Director RAND Pardee Center on Longer-Range Global Policy and the Future Human Condition CEDM Project Meeting May 21,
CODE Project WP3 – Modelling support for cogeneration across the EU27.
Engineering Economic Analysis Canadian Edition
Operations Management Decision-Making Tools Module A
Alan Hamlet Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington March, 2001 CIG Water Resources.
F O U R T H E D I T I O N Financial Analysis in Operations Management © The McGraw-Hill Companies, Inc., 2003 supplement 5 DAVIS AQUILANO CHASE PowerPoint.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
EE535: Renewable Energy: Systems, Technology & Economics
AETS/March 2006 Dominica Geothermal Project and Interconnection with Neighbouring Islands Assessment and Cost-Benefit Analysis March 2006 A E T S Application.
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
Enhancing the Climate Resilience of Africa’s Infrastructure ACPC Role.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
The Importance of Hydropower and the Dam of Włoczławek
Fundamentals of Corporate Finance, 2/e ROBERT PARRINO, PH.D. DAVID S. KIDWELL, PH.D. THOMAS W. BATES, PH.D.
Trolley Case Study Overview: March, 2003 CO 2 Emissions Reduction Potential for Santiago, Chile Center for Clean Air Policy (CCAP) Cambio Climatico y Desarrollo.
A: Overview of project analysis and workshop contributions July 3, :00 pm to 3:30 pm David Purkey, SEI Robert Lempert, RAND 1.
46 mini/micro hydro plants KP Pakistan
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Hood River County Monthly Meeting Presentation Toni E Turner, M.S., P.E., Project Manager and Technical Lead.
Capital expenditure decisions: an introduction
Project Planning and Capital Budgeting
Estimating and Comparing Costs and Benefits of Adaptation Projects in Africa – Project AF47 Participating organisations: Energy and Development Research.
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Overview of the Colorado River Basin Water Supply and Demand Study Urban Water Institute 19 th Annual Water Policy Conference August 22-24, 2012 San Diego.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Methods for Developing Robust Climate Adaptation Plans in the Energy Sector David Groves Water and Climate Resilience Center.
Information Needs for Developing Robust Adaptive Strategies Robert Lempert Director, RAND Pardee Center for Longer Range Global Policy and the Future Human.
Economics of Alternative Energy Sources and Globalization Nov Orlando, Florida The Economic Feasibility of Bio-energy Generation for Peak Demand.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Overview of WEAP. Water Evaluation and Planning System WEAP A generic, object-oriented, programmable, integrated water resources management modelling.
Idaho’s Water Energy Resources and Hydroelectric Potential Douglas G. Hall, Program Manager INL Hydropower Program August 2006.
Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Deeper Insights from System Dynamics Models Mark Paich Lexidyne Consulting 10/9/08.
1 Scenarios and More California Water Plan Advisory Committee Meeting April 14 th, 2005.
Improving Decisions in a Complex and Changing World: New Approaches to Climate Change Decisionmaking Under Uncertainty Robert Lempert, Debra Knopman, and.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
WEAP Demand Management
Water Management and Climate Change in the US- Mexico Border Region Robert Lempert Senior Scientist RAND September 27, 2008.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
Biomass GEM assumptions Erwan Hemery 12 May 2009.
Diversification of Energy Power Plants in the North of Chile Matías Raby.
Introduction and Overview
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
Best Practices Consortium
Developing Capacity Alternatives
Introduction and Overview
Distributed Generation Adoption Decision Making Under Uncertainty
The French nuclear Bet Quentin Perrier WORKSHOP
Stevenson 5 Capacity Planning.
Energy Storage.
Presentation transcript:

E: Track II Project level analyses Robert Lempert, RAND 1

Project Has Two Tracks Analyses consistent across basins and power pools (Track I) WaterEnergy 2

Project Has Two Tracks Analyses consistent across basins and power pools (Track I) Project level analyses (Track II) – Conduct five case studies, each focusing on a specific project – Goals of project-level analyses: Benefit managers of the projects studied Enrich response options analysis in basin-level studies Develop widely usable tools Bank and others can use 3

Initial Case Study Considers Malawi’s Lower Fufu Hydro-Power Project Project basics: –Hydropower (90 MW) –Estimated cost: $600M Performance metrics –Firm power (MWh / yr) –Levelized energy cost (US$/ KWh) 4

Analysis Builds on Data in 1995 Prefeasibility Report Estimates from 1995 report: –Capital cost: $118.75M –Annual fixed operating costs: $1.78M/year (roughly 1.5% of capital cost) 5

Analysis Will Stress-Test Project Across Wide Range of Plausible Futures Analytic Approach –Use hydrological and financial model to evaluate performance metrics under many future conditions (climate and other uncertain variables) –Identify cases where performance is unacceptably low –Consider design choices that can reduce vulnerability in as many cases as possible Design choices include –Plant capacity –Height of dams –Diameter of supply tunnels 6

Built Simple Analytic Framework for Evaluating the Robustness of Lower Fufu Hydropower Project WEAP model of hydro project Excel-based hydropower project cost model By project specification and climate and other assumptions: Firm yield Unit costs Alternative hydropower project specifications Which project specifications are most robust in terms of firm yields and energy costs? Climate change hydrologies Capital costs O&M costs Other assumptions Financial and other assumptions Excel model of hydro project costs 7

Simulated Hydropower Production Over Time: Historical Climate 56 GCM Projections + Historical Historical 8

Simulated Hydropower Production Over Time: 56 Climate Projections 56 GCM Projections + Historical Historical 9

Average Hydropower Production Varies Across Climate Projections 56 GCM Projections + Historical Average Annual Hydropower Production Range: 530 – 644 GWh 10

With Current Project Configuration Hydropower Unit Costs Vary Across Climate Projections Annual costs assuming 5% annual interest rate and 40-year payback period: –$12.4M (capital costs) + $1.3M (O&M costs) = $13.6M/year Annual production range: –530 – 644 GWh Range in Energy costs: –0.021~ $/kWh 11

Next Steps to Consider on Fufu Case Studies Additional uncertainties – Hydraulic efficiency (nominal is 88%) – Infrastructure cost parameters – Financial terms – Larger instream flow requirements (reduce diversion potential) – Demand for power at required price Alternative project designs – Larger and smaller supply tunnels – Larger and smaller generating capacity – Alternative energy sources 12

Some Criteria for Choosing Next Four Case Studies Project in one of the seven basins considered in Track I analyses Project between pre-feasibility and feasibility study phases Sufficient data in pre-feasibility study to inform the simple, excel-based model Interest among relevant decision makers 13