CTC 475 Review Matching period and interest interval Continuous Compounding.

Slides:



Advertisements
Similar presentations
Applications of Money-Time Relationships
Advertisements

Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Present Worth Analysis
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Present Worth Analysis
Engineering Economics Outline Overview
Chapter 5: Evaluating a Single Project
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
CTC 475 Review Comparing Alternatives Alternatives can be developed from various proposals Planning horizons must be the same (LCM, Shortest Life, Longest.
Rate of Return Analysis
TM 661 Engineering Economics for Managers
InvestmentWorth Investment Worth. Given a minimum attractive rate-of-return, be able to evaluate the investment worth of a project using Net Present Worth.
Internal Rate of Return (Multiple Rates of Return Problem) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. May 31 Capital Budgeting Decisions.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
CTC 475 Review Evaluating alternatives Evaluating alternatives Ranking Method (PW, AW, FW) Ranking Method (PW, AW, FW) Incremental Method (PW, AW, FW,
Flash back before we compare mutually exclusive alternatives.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
CTC 475 Review Is a certain cash flow economically feasible?
Stocks & Stock Market Primary Market - Place where the sale of new stock first occurs. Initial Public Offering (IPO) - First offering of stock to the general.
CTC 475 Review Matching period and interest interval Matching period and interest interval Continuous Compounding Continuous Compounding Continuous Flow.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Applications of Money- Time Relationships MARR by PW Method r r All cash inflows and outflows are discounted to the present point in time at an interest.
FINAL EXAM REVIEW Spring Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Intro to Engineering Economy
5- 1 Outline 5: Stock & Bond Valuation  Bond Characteristics  Bond Prices and Yields  Stocks and the Stock Market  Book Values, Liquidation Values.
Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
FINAL EXAM REVIEW Fall Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present Worth.
Establishing the Planning Horizon
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Chapter 5 Rate of Return Analysis: Single Alternative 5-1.
Comparing Projects Using Time Value of Money
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Two ways to account for inflation in PW calculations: (2) Express cash flow in then-current dollars and use inflated interest rate Where: i f = i + f +
Evaluating a Single Project
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
ENGINEERING ECONOMY DR. MAISARA MOHYELDIN GASIM Chapter 4-3 Comparison of Alternatives Present Worth Analysis.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
Some Basic Truths You can’t add or subtract two cash flows that occur at different points in time. You can’t compare two equivalent values that occur at.
12/17/2015rd1 Engineering Economic Analysis Chapter 15  Selection of a MARR.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Engineering Economics, Ejaz Gul, FUIEMS, 2009 Engineering Economics Lecture # 8 MARR, Analysis of Alternatives.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
ENGM 661 Engineering Economics for Managers InvestmentWorth Investment Worth.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Chapter 5: Evaluating a Single Project
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Variations in Present Worth Analysis
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
CTC 475 Review Is a certain cash flow economically feasible?
Capital Budgeting Techniques
Steps of the Incr. Analysis Process
Chapter 5: Evaluating a Single Project
Chapter 5: Evaluating a Single Project
Presentation transcript:

CTC 475 Review Matching period and interest interval Continuous Compounding

CTC 475 Methods for Determining if an Alternative is Economically Feasible

Objectives Know the various methods for determining if an alternative is economically feasible Be able to use any method for economic feasibility studies

Methods for Economic Feasibility Studies Present Worth (PW) Annual Worth (AW) Future Worth (FW) Internal Rate of Return (IRR) External Rate of Return (ERR) Savings/Investment Ratio (SIR) or  Benefit/Cost Ratio (B/C) Payback Period Method (PBP) Capitalized Worth Method (CW)

Present Worth Convert all cash flows to a single sum equivalent at time zero using the MARR

Annual Worth Convert all cash flows to equivalent uniform annual costs (EUAC) over the planning horizon using the MARR

Future Worth Convert all cash flows to a single sum equivalent at the end of the planning horizon using the MARR

Internal Rate of Return Determine the interest rate that yields a future worth (or present worth or annual worth) of $0

External Rate of Return Determine the interest rate that yields a future worth explicitly assuming reinvestment of recovered funds at the MARR

Savings/Investment Ratio or Benefit/Cost Ratio Determine the ratio of the PW of the savings (+cash flows) to the present worth of the investment (-cash flow)

Payback Period Determine how long at a zero interest rate it will take to recover the initial investment

Capitalized Worth Method Determine the single sum at time zero that is equivalent at i=MARR to a cash flow pattern that continues indefinitely

Equivalent Methods PW AW FW IRR ERR SIR or B/C

Nonequivalent Methods PBP CW

When is an alternative feasible? PW > 0 AW > 0 FW > 0 IRR > MARR ERR > MARR SIR or B/C > 1

Net Cash Flows It’s a good idea to use net cash flows (one cash flow at each period). It doesn’t matter with respect to whether a project is feasible or not; however, absolute numbers (ERR and SIR) may differ

Determining MARR For a company, MARR > Cost of Securing Additional Capital Capital----Debt Capital and Equity Capital Debt (borrow money or sell bonds) Equity (sell stock or company earnings)

Approaches for Establishing MARR Use company’s historic rate of return Add a fixed % to firm’s cost of capital Different MARR’s for different planning horizons Different MARR’s for different magnitudes of initial investments Different MARR’s for new ventures and cost- improvement projects Use MARR as a management tool Use avg. stockholder’s return on investment for all companies in the same industry group

Example (MARR=10%) EOYCash Flow 0-$100 1$50 2$0 3$60 4$0 5$100

Present Worth PW= -$100+$50(P/F 10,1 )+$60(P/F 10,3 )+$100(P/F 10,5 ) PW= -$100+$50(0.9091)+$60(.7513)+$100(0.6209) PW= -$100+$45.46+$45.08+$62.09 PW= +$53 PW>0

Future Worth FW= -$100(F/P 10,5 )+$50(F/P 10,4 )+$60(F/P 10,2 )+$100 FW= -100(1.6105)+50(1.4641)+60(1.2100)+100 FW= -$ $73.20+$72.60+$100 FW=+$85 FW>0

Future Worth-Alternate Method PW=+$53 FW=PW(F/P 10,5 ) or PW(1.1) 5 FW=$53(1.6105) FW=$85 FW>0

Annual Worth Find A given P AW=PW(A/P 10,5 ) AW=$53(.2638) AW=$14 Find A given F AW=FW(A/P 10,5 ) AW=$85(.1638) AW=$14 AW>0

IRR-Find i that gives a FW=0 FW = -$100(F/P i,5 )+$50(F/P i,4 )+$60(F/P i,2 )+$100 = 0 i (%)FW 10+$85 9+$88 11+$81 15+$66 20+$41 25+$10 30-$27 Interpolate to get an IRR = 26.4% IRR>MARR

IRR For some types of cash flows, there can be more than one IRR You’ll explore this in project 6 The ERR avoids this problem The ERR value will be between the MARR and IRR

ERR: Set FW of + using MARR = FW of – using ERR; solve for ERR FW(+) = $50(F/P 10,4 )+$60(F/P 10,2 )+$100 = $ FW(-) = $100(1+ERR) 5 $100(1+ERR) 5 = $ (1+ERR) 5 = $2.458 ERR=19.7% ERR>MARR Check: MARR=10%; ERR=19.7%; IRR=26.4%

SIR or B/C SIR=PW(+)/PW(-) PW(+) = $50(P/F 10,1 )+$60(P/F 10,3 )+$100(P/F 10,5 )= $153 PW(-) = $100 SIR=$153/$100=1.53 SIR>1

PBP-Payback Period If MARR=0 how many periods does it take to get your investment back? At 1 year; $50<$100 At 2 years: $50<$100 At 3 years: $110>$100 PBP is 3 years

PBP-Advantages No interest calculations No decision regarding MARR Easy to understand Reflects manager’s viewpoint when capital is limited Future cash flows are uncertain anyway Rough measure of liquidity

PBP-Disadvantages Ignores concept that money has a time value Ignores + cash flows beyond the PBP  Ignores long-term gains Best to use as a secondary method

Capitalized Worth Present value that would pay for the first cost of some project and provide for its perpetual maintenance indefinitely, or Present worth of some cash flow pattern that repeats indefinitely For this class CW=AW/MARR=$14/0.1=$140 $140 at 10% interest would give you $14 every year forever

Capitalized Worth An indefinite series does not occur in real life; however, this method is sometimes used when considering projects w/ extremely long lives (>=50 years)  Bridges  Highways  Forest harvesting  Endowment funds

Next lecture Example showing all methods