Economic Principles of PPP Valuation CAPITAL BUDGETING.

Slides:



Advertisements
Similar presentations
Total interest, initial amount borrowed or lent
Advertisements

Fin351: lecture 5 Other Investment Criteria and Free Cash Flows in Finance Capital Budgeting Decisions.
Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
Session 7 Topics to be covered: Capital Budgeting 101
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Compound Interest Suppose you invest $100 in an account that will pay 10% interest per year. How much will be in the account after three years? – Year.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
LECTURE 1 : THE BASICS (Asset Pricing and Portfolio Theory)
1 Finance: Net Present Value 8.1 ECON 201 Summer 2009.
Chapter 4: Time Value of Money
Valuation Under Certainty Investors must be concerned with: - Time - Uncertainty First, examine the effects of time for one-period assets. Money has time.
Stocks and Their Valuation Chapter 10  Features of Common Stock  Determining Common Stock Values  Preferred Stock 10-1.
CHAPTER 12 THE CAPITAL BUDGETING DECISION Capital Expenditures Decision §CE usually require initial cash outflows in hope of future benefits or cash.
International Capital Budgeting Chapter 18
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
4. Project Investment Decision-Making
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
1 (of 30) IBUS 302: International Finance Topic 16-International Capital Budgeting Lawrence Schrenk, Instructor.
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Decision Criteria NPV IRR The Payback Rule EVA Mutually Exclusive Projects The case of multiple IRRs.
Chapter 9 An Introduction to Security Valuation. 2 The Investment Decision Process Determine the required rate of return Evaluate the investment to determine.
Financial Projections (1) – Assumptions and Cash Flow MHR 308 Summer 2002.
Fin351: lecture 4 Other Investment Criteria and discounted Cash Flow Analysis Capital Budgeting Decision.
Economic Tools to Evaluate Culling Decisions for Breeding Cattle and Replacements.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 NPV and IRR  How do we decide to invest in a project or not? Using the Annuity Formula  Valuing Mortgages.
Costs & Break-Even GCSE Business Studies tutor2u™
Summary of Last Lecture
Ch11. Project Analysis and Evaluation. 1) Scenario and other what-if analyses Actual cash flows and projected cash flows. Forecasting risks (estimation.
Lecture 15-2 Building Financial Models Material for Lecture 15-2 –Read Chapters 13 and 14 –Lecture 15-2 Farm.xlsx.
9 - 1 The financial (monetary) value of any asset (investment) is based on future cash flows. However, the value of a dollar to be received in the future.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Steve Paulone Facilitator Sources of capital  Two basic sources – stocks (equity – both common and preferred) and debt (loans or bonds)  Capital buys.
1 Microeconomics Lecture 11 Capital market Institute of Economic Theories - University of Miskolc Mónika Orloczki Assistant lecturer Andrea Gubik Safrany,
Section 36.2 Financial Aspects of a Business Plan
INTERNATIONAL FINANCIAL MANAGEMENT EUN / RESNICK Fifth Edition Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
FINC3240 International Finance
CHAPTER 9 Capital Investment Decision Basics
Multi-Period Analysis Present Value Mathematics. Real Estate Values Set by Cash Flows at different points in time. Single period Analysis revisited 
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
10-1 The Basics of Capital Budgeting Should we build this plant?
1 Prentice Hall, 1998 Chapter 11 Cost of Capital.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
1 THE INTERNAL RATE OF RETURN (IRR) is the discount rate that forces the NPV of the project to zero.
NPV and the Time Value of Money
Measuring the Economy. The Economy as a Circular Flow Resources FirmsHouseholds Goods and Services Expenditures Income.
Duration 1 hour 30 mins Investment Analysis. Topics to be covered Review of last session Investment background Capital budgeting Methods.
Circular Flow in Economics
CORPORATE FINANCE I ESCP-EAP European Executive MBA
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Review of the Previous Lecture Business Fixed Investment –Cost of Capital –The Determinants of Investment –Taxes and Investment.
BNFN 521 INVESTMENT APPRAISAL Lecture Notes Lecture Three.
Chapter 10 Choices Involving Time Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Discounted Cash Flow Valuation. 2 BASIC PRINCIPAL Would you rather have $1,000 today or $1,000 in 30 years?  Why?
Farm Management Multiple Choice Non-Math The present value formula for estimating land prices (PV = annual net returns ÷ discount rate) assumes.
Budgeting Tools Enterprise Budgeting Partial Budgeting
FINANCIAL PLANNING Business Studies Calculating revenue, costs and profit.
FINANCIAL MANAGEMENT FINANCE & BANKING: CHAPTER 3 FINANCIAL MANAGEMENT.
Financial Planning Skills By: Associate Professor Dr. GholamReza Zandi
ECON 201 Lecture 4-5(a) Finance: Net Present Value & Benefit/Cost Analysis.
Real Estate Principles and Practices Chapter 16 Investment and Tax Aspects of Ownership © 2010 by South-Western, Cengage Learning.
PRESENTATION ON FINANCIAL COMPONENT OF A BUSINESS PLAN BY AHMeD Hussain Khan.
Chapter 5 Interest Rates. Chapter Outline 5.1 Interest Rate Quotes and Adjustments 5.2 Application: Discount Rates and Loans 5.3 The Determinants of Interest.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets Ch. 3: Decision Rules © Harry Campbell & Richard Brown School of Economics The.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Managerial Finance Session 5/6
Financial Appraisal of Project
Presentation transcript:

Economic Principles of PPP Valuation CAPITAL BUDGETING

Economic Valuation Means Valuations of Investment projects, like PPP Projects It is also known as Capital budgeting. This shows how capital fund or investment is used Examples are : PPP Expressway,, PPP bridge, Housing projects, etc..

Principles of Valuation 1.Finding present value of benefits materializing over its lifetime and present value of costs incurred over the lifetime. 1.Comparing the rate of return of the invested capital with the opportunity cost of the capital.

Principles of Valuation: Financial – Simple one period case EXAMPLE OF AN INVESTMENT DECISION Country A wants to start a PPP Housing Project and buys land worth Tk 8.5 billion with the assumption that it will sell land next year when land value will rise to Tk. 9.3 billion. Common men usually will calculate 9.4 % profit (9.3 – 8.5 )/ 8.5= 9.4% profit. However this calculation is wrong.

Principles of Valuation: Financial - one period case Finding Present Value of Tk9.one year later. Formula used, PV = 9.3/ (1+ 0.1) (Assuming rate of interest is 10%) PV becomes equal to Tk8.45

Principles of Valuation: Financial - one period case Net Present Value of Investment = = The value of the PPP investment is –0.05 when all the benefits/values and all the costs are converged in time scale. E.g., at time zero or present time

Benefit /Cost Ratio of the project B/C ratio = Present Value of Benefit/ Present value of cost 8.45 / 8.5 = 0.99 Unviable PPP project as B/C is < 1 It is better to use money in alternative investments like buying government bonds or keeping money in FDRs.

Principles of Valuation: Financial – multi-period case 2 nd Example Country A wants to start a PPP Housing Project and buys land worth Tk 8.5 billion with the assumption that it will sell a part of the land at Tk 5 billion one year later and remaining at Tk 4.5 billion two year later.

Principles of Valuation: Financial – multi-period case Finding Present Value (PV) of Tk 5 billion one year later Formula used, PV = 5/ (1+ 0.1) Assuming rate of interest is 10% PV becomes equal to Tk 4.54 billion

Principles of Valuation: Financial – multi-period case Finding Present Value of Tk4.5 billion two year later Formula used, PV = 4.5 (1+ 0.1)**2 (Assuming rate of interest is 10%) PV becomes equal to Tk3.72 billion

Principles of Valuation: Financial – multi-period case Cash-flow at time zero is: = = The value of the PPP investment is – 0.24 when all benefits and costs where converged into a singular time. E.g., at time zero e.g., present time.

Calculation of B/C ratio in multi-period case B/C = Present Value of Benefit streams/ Present Value of cost streams B/C = 8.26/ 8.50 = 0.97 Unviable Project,

General formula for Calculating Benefit-Cost or B-C Ratio In this measure, Present Value of the Benefit stream is divided by Present value of the cost stream. n { Bt = B1/(1+ri) + B2/(1+ri)**2 …upto n t =1 n { Ct = C1/1+ri + C2/(1+ri)**2 …upto n t =1 If the ratio{ Bt / { Ct > 1, the project is said to be viable that is, benefit outweighs cost.

Net Present Value (NPV) In this measure, Present Value of Benefit Stream is subtracted from Present value of cost stream. n { Bt = B1/(1+ri) + B2/(1+ri)**2 …upto n t =1 n { Ct = C1/1+ri + C2/(1+ri)**2 …upto n t =1 If NPV ={ Bt - { Ct > 0, the project is said to be viable – benefit outweighs cost.

Limitations of B/C ratio and NPV Both B/C ratio and NPV provides some numerical value about the viability of the Project. However none of the B/C ratio and NPV allows us to compare the project benefit to the cost of the fund e.g., using money for alternative use or keeping money at bank at certain rate of interest.

IRR or Internal Rate of Return (IRR) is the most widely used indicator. IRR is a rate at which “net present value of benefits – costs” is zero 0 = { Bt – Ct =B1-C1/(1+irr) +B2-C2/(1+irr)**2 t =1..n upto n IRR is that value that makes NPV = 0 This means that if prevailing bank interest rate (ri) is below (irr) then NPV > 0.

Suppose for 8% value of IRR, NPV becomes zero Now if we use a figure of 6%, NPV will turn to be a positive number rather than zero. As irr is in the denominator. On the other hand if we use a figure of 10%, NPV will turn to be a negative number rather than zero.

Example of IRR Calculation Land Purchase 1st Example We had a cash flow 0 = / (1+irr)

Continuation of IRR Calculation Or, or 8.5 = 9.3 / (1 +irr) or irr = 9.3 or 8.5 irr = 9.3 – 8.5 = 0.8 or irr = 0.8 / 8.5 = 9.4%

Example of IRR Calculation Land Purchase 2 nd Example: NPV = = 5.0 / (1 +.1) / (I+0.1)**2 0 = 50,000 / (1 + irr) + 45,000 / (I +irr)**2 Using Excel Program, irr = 8%

Internal Rate of Return It shows the maximum interest rate that an enterprise could pay on the capital invested and still break-even financially ( e.g, NPV is either zero or positive). IRR is that rate that equalizes present value of the initial investment (-ve cash-flows) with the present value of the future cash flows (+ve cash-flows).

IRR is regarded as the most complete measure of the return on investment from the view point of investor.

COST Estimates: Different components of costs Listing of all costs (local, foreign, capital, recurrent, material, service): Construction cost Consultancy cost Incremental Administration cost »Cont. to next slide

Initial working capital cost Taxes and duties Cost of monitoring, reporting of the project etc.

BENEFIT Estimates Listing all sorts of revenue like: main products, by-products, Direct and indirect benefits etc.

Format for Capital Budgeting Capital budgeting format can be developed in Excel program

Time Periods in Years …… 14 Revenue Revenue Total Revenue Variable Cost-1 Variable cost-2 - Total Variable cost Total Fixed cost Total Cost Format of Financial Analysis of PPP Projects - Part 1

Time Periods in Years …… 14 (TOT REV – Total Cost) Gross Profit Value Addition/contributi on to GDP (REV – Intermediate Cost) Continuation of Financial Analysis Format - Part 2

Time Periods in Years …… 14 FINANCING Loan e.g., 70% of total PPP cost - Repayment Principal Interest Total Equity 30% - Continuation of Financial Analysis Format - Part 3

Time Periods in Years …… 14 INVESTMENT COST Machinery Cost - Structure Cost - Physical Contingency & misc. cost - Total - Working Capital - Total Investment and Working Capital - Continuation of Financial Analysis Format - Part 4

Time Periods in Years …… 14 Total Revenue --- Total Cost --- Gross Profit --- Loan - Principal and Interest Repayment (Equal Annual Installment) Equity - Total Investment & Working Capital - Cont. to next slide Summary of Complete Format For Financial Analysis - Part A

Time Periods in Years …… 14 CASH FLOW Gross Profit – Principal - Interest Per period Cumulated B/C Ratio - Excel gives result when Formula applied to cash-flow (per period) NPV - Excel gives result When formula applied to cash-flow (per period) FIRR (%) - Excel gives result When Formula applied to cash-flow (per period) Complete Format For Financial Analysis - Part B

Practical Lessons

SENSITIVITY ANALYSIS This is done to test robustness or sensitivity of the measure to critical variables. For example, what would be the effect on IRR for say 10% rise in investment costs or 10% decline in sales revenue. Sensitivity analyses allow identifying design options so as to reduce risks.

ECONOMIC ANALYSIS Reasons: Due to various distortions in the prices of inputs and outputs, true “scarcity” of the resources is not reflected. For example, due to un-competitive labor market, labor wages are artificially blown -up. Similarly, due to over-valuation of local currency compared to the foreign currency, imports are artificially made cheaper. Therefore these need to be corrected.

ECONOMIC ANALYSIS A conversion factor is used to adjust wages and salaries. A Shadow exchange rate factor is used to convert non-tradable to tradable. Similarly in case of exportable and imported products, corrections are made for taxes and transfers. Once corrections are made, B/C ratio, NPV and EIRR are calculated in the usual manner( same as financial analysis).