South Canal Hydro Project Electric Fish Barrier 01 March 2013 by Jim Heneghan Renewable Energy Engineer Delta-Montrose Electric Association.

Slides:



Advertisements
Similar presentations
Installations need to prevent damage to local fish stocks and will normally include protective screens and the addition of a new or upgraded fish pass.
Advertisements

Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
MONTANA UPDATE Mark Lere, Habitat Bureau Montana Fish, Wildlife and Parks.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Weirs and Canal Intakes By: Nell Kolden and Taylor Barnett Thursday April 12, 2012 CIVE 717.
Small-Scale Fish Screen Selection Workshop
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Wastewater Treatment & Collection System Improvements.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
Hydropower 1700 ’ s ~ Early 1800 ’ s Bernard Forest de B é lidor, Architecture Hydraulique,
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Houghton College/NextEra Solar Array. Solar Array Details 2.5 MW system covering 11 acres 2.92 million kWh production (equivalent to powering 270 homes.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Dams: Past, Present, and Future
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
HYDROPOWER DAMS By Hydro Power Group PYP 6 – Sekolah Ciputra
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Hydro electric (Hydel) Power Plant
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
Progress Update: Evaluation of Federal Facilities in WIPs and Milestones CBPO Management Board March 6, Jim Edward, EPA Greg Allen, EPA.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Operations & Maintenance Considerations Dave Lawson Electrical Maintenance and Operations Supervisor.
Middle Fork Project Project Description April 25, 2006.
Hydropower Activities Midwest Electric Consumers Association June 11 and 12, 2013.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Ontario Waterpower Policy Initiatives The importance of being earnest Paul Norris President Ontario Waterpower Association.
Water Power By: Andrew Paulshock.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Biggest hydroelectric power plants in world
Western Colorado vs. Eastern Colorado Where does your water go? Constance L. Danner 29 November 2005.
A New Spin on Energy. What is hydroelectric Power? A way to use the force of falling water to create electrical energy At its base is the conservation.
Hydroelectric Power Steph Mecham Chris Rhoades Dylan Welch.
Environmental Management Module V
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA.
Project Status South Delta Improvements Program Project Status November 2003.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Micro-hydropower for the home, farm, or ranch: A brief overview
Non-Federal Development at Reclamation Facilities.
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Senate Resources Committee & House Energy Committee Prepared by Alaska Energy Authority 1 /25/2011.
Reclamation and Hoover Dam It’s All About The Water.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Christopher Melson Department of Civil and Architectural Engineering University of Wyoming.
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
Assoc. Prof. Dr. Tarkan Erdik
Building a Fishway for Sturgeon
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Potholes Supplemental Feed Route Project
Water Reclamation Plant Feasibility Study Update
PPL1.6 Pumping Plant Project Overview
Flow Regulation on the River Awe
Hydro electric (Hydel) Power Plant
Hydro electric (Hydel) Power Plant
Background Lee County has about 180,000 pounds of nitrogen to remove from the Tidal Caloosahatchee. There are limited locations near the stream outfalls.
Presentation transcript:

South Canal Hydro Project Electric Fish Barrier 01 March 2013 by Jim Heneghan Renewable Energy Engineer Delta-Montrose Electric Association

Uncompahgre Project Details Gunnison Tunnel Completed of 4 Original Bureau of Reclamation Projects Irrigation water for agriculture in the Uncompahgre Valley Uncompahgre Project Irrigates approximately 80,000 acres Hydroelectric Generation Potential recognized from project onset

Hydro Project Milestones DMEA & UVWUA Agree to Partner 01 Feb LOPP Application to USBR  DMEA & UWUA only applicants August LOPP negotiations begin  DMEA/UVWUA Agreement finalized March NEPA scoping meeting  Colorado Parks & Wildlife recommends fish mitigation December 2011 – Draft EA  Comment period through Jan 2012 Feb Final EA & FONSI  Preconstruction Requirements March 2012 – Notice to Proceed

Hydro Project Details Final Design Site 1 = 4 MW o 1000 cfs maximum o 54 feet of head Site 3 = 3.5 MW o 1000 cfs maximum o 48 feet of head Project Budget o $22 million Project Timeline o Construction March 2012 – July 2013

Uncompahgre Project & Fish Fish Entrained in Irrigation Infrastructure West Portal – Start of the South Canal after 5.8 miles of tunnel East Portal – Gunnison Tunnel Intake fed by flows from the Gunnison River

CPW Fish Count South Canal fish are counted and evaluated - CPW’s sampling results indicate South Canal has fish population equivalent to gold medal status - Pre-Hydro, substantial fish losses incurred annually after canal dewatering

Hydro Project & Fish Impact of Hydro on S. Canal Fish - Fish entrainment into newly constructed hydro facilities would be potentially harmful to S. Canal fish - Screening at the East Portal would prevent annual losses and prevent entrainment into the hydro facilities

Electric Fish Barrier Why an Electric Fish Deterrent System? Gunnison River is a gold medal trout fishery – substantial ecological and economic value Gunnison Tunnel has allowed fish losses to the irrigation system since its inception UVWUA had operational concerns with traditional irrigation water screening methods Access to the Gunnison Tunnel inlet is difficult Traditional screens need maintenance of mechanical parts and regular cleaning Debris plugging of traditional screens may potentially damage the tunnel Smith Root system uses electrical field to deter/guide fish away from the tunnel intake DC pulsators housed in the tunnel gate house generate the electricity Current is carried to the suspended electrodes Electrical field at the electrode and extends for about 5 feet into the water

Electric Fish Barrier Fish Barrier Structure Concrete pylons in place on the upstream bank -Concrete deadman in the foreground - Concrete base for steel structure in the middle of the picture

Electric Fish Barrier Fish Barrier Structures - Concrete deadman in foreground - Concrete base for steel structure in middle of picture

Electric Fish Barrier Fish Barrier Structures - Steel structure installation underway on downstream bank

Electric Fish Barrier Fish Barrier Structures - Steel structure installed on the upstream bank

Electric Fish Barrier Fish Barrier Electrodes - Catenary cables aloft while steel electrodes are installed - Electrodes are 3” in diameter and range in length from 12 ft – 16.5 ft

Electric Fish Barrier Fish Barrier Electrodes - Installation continues with fiberglass “spacers” installed on the bottom of the electrodes - Because electrodes consist of anodes and cathodes, spacers are needed to prevent contact of two or more electrodes

Electric Fish Barrier Fish Barrier Installed - Operate during irrigation season. - Emits an electrical field = 2.0 – 4.0 volts per inch. - Deters fish by creating an “uncomfortable environment”; doesn’t shock them.

Electric Fish Barrier Fish Barrier Installed - Fish swimming toward the tunnel are guided back to the river (toward the left in this picture)

Thank You Q & A