Flood Management and Recovery 2011 Loddon and Campaspe flood Phillip Hoare Manager Business Services Goulburn-Murray Water.

Slides:



Advertisements
Similar presentations
China: Water Management and Accounting Project May 22-24, 2006 Hague.
Advertisements

Flood Loss Assessment APFM methodology
EWater Road Show 21 Feb – Part 3 of 5 Dr Peter Wallbrink Source Project Director, eWater Building the new integrated modelling system for Australia.
Flood Risk Management Helping us help you Gordon Trapmore - Flood & Coastal Risk Manager Devon & Cornwall Kevin Barnes - Flood Resilience Team Leader.
N  E  R  R  T  C National Emergency Response & Rescue Training Center LRGVDC Multi-Agency Coordination Center (MACC)
Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
Skill Transformation for Operational Staff in Modernised Delivery Systems Geoffrey Enever Manager Customer Service Goulburn-Murray Water.
COMMUNITY EMERGENCY PREPAREDNESS LEADERS AND THEIR ROLE IN A DISASTER JANUARY 2014 Sandy City Emergency Management.
Severe Winter Weather Warning and Preparedness 2014 Meg Pirkle, P.E., Director of Operations Georgia Department of Transportation.
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
Preparing for the Rainy Season SFWMD Operations & Actions.
RPC Involvement in the Recovery after Tropical Storm Irene Presented by Tom Kennedy (Southern Windsor County RPC) and Susan Schreibman (Rutland RPC) on.
Cain Trist General Manager - Operations & Response
The use and management of water in Goulburn Valley.
Kansas City Industrial Council Hydrology and Hydraulics
Overview of the Victorian Floods Trevor White Director Operations Victoria State Emergency Service APCO CONFERENCE 2011.
EPR-Public Communications L-05
1 Presentation for WALIS Forum Mark Taylor Manager SLIP Emergency Management Program FESA September 2006 The document and its contents are confidential.
Greg Carter GoA Partnership Symposium. Format AENV role in emergency management AENV role in emergency management AENV role in the field AENV role in.
Rapid Response Network External Agencies Workshop 26 th January 2011 Middleton Railway Paul Armitage Tony Firth.
1 Flood Risk Management Session 3 Dr. Heiko Apel Risk Analysis Flood Risk Management.
Water savings in the Goulburn Murray Irrigation District T he journey from 2000 to 2012 Stephen Harding and Ian Moorhouse Irrigation Australia Conference,
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
IS-700.A: National Incident Management System, An Introduction
WhatIf? Modelling Tools Providing quantitative decision support tools and services to address complex organizational and societal issues. Simulation modelling.
Session 16: Distribution of Geospatial Data 1 Distribution of Geospatial Data in the Public Environment Hazard Mapping and Modeling.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Adressing Floods and Drought in GEF supported TDA/SAPs IWC-7 October 2013 Peter Bjornsen, UNEP-DHI Centre.
INITIAL PLANNING CONFERENCE FOR ARF DiREx 2015
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Climate Change, Extreme Floods, and Dam Safety in Korea
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
Childhood Neglect: Improving Outcomes for Children Presentation P30 Childhood Neglect: Improving Outcomes for Children Presentation Child neglect and supervision.
Modernisation Implementation Lessons An Operational Viewpoint Geoffrey Enever Head of Customer Service Goulburn Murray Water DM#
1 RAPID RESPONSE NETWORKS Working with external agencies to protect heritage collections Colin Atkinson Flood Incident Management Team Leader.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Assessment of Damage and Losses after Disasters (PDNA)
Issues surrounding the Red River Flood of Outline Introduction Impacts of the flood Flood protection works Manitoba Water Commission (MWC) Current.
Meteorological & Hydrological data for water resources development.
International Workshop on Flash Flood Forecasting – Costa Rica March 2006 WORLD METEOROLOGICAL ORGANIZATION Weather, Climate and Water INTERNATIONAL WORKSHOP.
Crisis Management Crisis: any situation that has the potential to affect long-term confidence in an organisation or product and may interfere with its.
Impact Assessment Impact Assessment Guidelines for Class 1 Emergencies.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
Flood Forum Victoria 14 November 2014 Presented by: Joe Buffone Deputy Commissioner Director Risk & Resilience.
Reservoirs – Emergency Planning Workshop Image courtesy of HR Wallingford.
Flood Forecasting and Warning Services Bureau Initiatives Flood Forum Victoria – Mildura November 2014 Elma Kazazic, Regional Hydrology Manager –
International Levee Handbook Overview of the handbook Chapter 6 – Emergency Management and Operations.
Looking At It From Both Ends Of The Pipe.... Key Points  My Background.  Development of a 3 waters bylaw at New Plymouth District Council (NPDC) –Current.
The Common Assessment Framework (CAF) & Lead Professional (LP)
Response to an Emergency Training for 211 Staff in Ontario Updated September
„ZONE 2010“ Opening Exercise Col. Eng. Ivan Koleňák MoI-Directorate General of the Fire Rescue Service of the Czech Republic.
“Creating communication pathways to help incorporate local knowledge into emergency management and decision making” Andy Sheehan Victorian Flood Forum.
OPRC Level 3 Spill Management Roles & Responsibilities.
Evacuation Procedures City Council October 20, 2015.
WATER RESOURCES DEPARTMENT
March 2012 Flood event – Community Engagement. Todays discussion 1.Summary of the event 2.Impact on the community 3.Opportunities for engagement 4.Key.
Flood Management Constitution Ministry of Energy
Determining Flood Management Constitution in Ministry of Energy
Central Coast Flood Events Bella Coola Valley during 2010 & 2011
Flood Monitoring Tools 2011 OFMA Annual Conference
Scottish Borders Resilient Communities Initiative
Scottish Government Responsible for environment & flooding issues
DISASTER RESPONSE PLANNING IN SAMOA
Disaster Recovery Operations
Presentation transcript:

Flood Management and Recovery 2011 Loddon and Campaspe flood Phillip Hoare Manager Business Services Goulburn-Murray Water

Tullaroop Reservoir – photo taken of outlet tower on 9 September Storage level is 100%. Tullaroop Reservoir – photo taken of outlet tower on 5 July Storage level ~ 4%. Recent history

Approx 60% chance of exceeding median rainfall in Nov-Jan period Median rainfall for Loddon catchment is 88 mm Total rainfall received during Nov-Jan period was 397 mm at Cairn Curran 97.8 mm fell on 14 Jan Bureau of Meteorology forecasts

Overview Major areas of concern were quickly evident Lake Eppalock % rainfall in December/January Cairn Curran 93% - air space only approx 10,000ML Record flows passing storages on both systems Major impacts d/s communities & irrigation areas a certainty

The ‘Inland Sea’

State arrangements for emergency management Victorian State Emergency Services (SES) lead agency –Responsibility to coordinate emergency response Bureau of Meteorology (BoM) –Responsible for flood warnings Municipal Councils –Responsible for community awareness, information systems, identifying and treating risks Water Authorities (G-MW) –Operating assets appropriately

Campaspe system Lake Eppalock – 304,650ML capacity Fixed crest spillway Peak January inflow 137,900ML/d Peak outflow 80,300ML/d Total January inflow 10 times previous record 180 times average

Laanecoorie spillway

Laanecoorie spillway after flood

Eppalock spillway road after water had receded

Ovens Goulburn Broken Murra y Campaspe Loddon Bullarook Irrigation Areas Torrumbarry time to prepare - natural carrier interaction/ operation - many “fronts” at once Loddon Valley major asset damage - historic role/ expectation - unauthorised works - supporting control Rochester Campaspe rapid impact - office inundated - community angst - storage management - warnings

Irrigation Areas -What we do in floods “Flood Mode” Intention replicate natural conditions prevent cross catchment flows Actions channel system ‘shut down’ floodways opened subways inspected/ monitored responded to issues &requests Complexities !!!! Simple !!

Rochester Hospital Murray Goulburn Factory Echuca Campaspe River Rochester township

G-MW Rochester Office – morning Saturday 15 January 2012

Regulator washed out from flood water

Flooding – Kerang Power Station

Kerang township

The recovery - Initiatives Issues to address Infrastructure damage Irrigation demand Customer contact Infrastructure status Dewatering Resources

Initiatives Integrated “Live” system information Centralised phone management Coordinated residual water management

Initiatives – Data integration Various systems – Enormous data Integrated system analysis –Information - Made available / displayed spatially using GIS system – DEKHO Information users –G-MW incident control room & call centre –Regional offices & operational staff –Construction crews –Other control agencies – SES, Council –Customers & Media – Web based information

What it looked like Service requests & severity This area still had irrigation demand in place – no floods This area still had irrigation demand in place Highlighted area to do works to allow water deliveries to occur

Web based system status

Initiatives – Phone management Customer contact – 24/7 Modernisation – Central System Operations Operational staff focused on response Customers service Responsive Consistent access to current data and ICC

Initiatives – Residual water Dewatering – 2012 Hotline Coordinated agency approval Mapping Media Timeliness Water quality Capacity

Lessons – Incident establishment Initial stages Incident triggers – clear & concise Preparedness – Scenario training ICC – Administration & IT Communication – Situation reports Local knowledge – Control agencies Staff & public safety

Lessons -Response Effective incident management = Information The value of integrated accessible info Call centre - 24/7 contact management Established operating procedures Cost – financial accounting ~$5million

Lessons - Recovery Communications Removing residual water Review & improve practices / knowledge Be part of community process Events>>>>design = unanticipated outcomes Recognise staff Communications

Questions? Phil Hoare

Overview Major areas of concern were quickly evident Lake Eppalock % from rainfall in December/January Cairn Curran 93% - air space only approx 10,000ML No ability to create air space in Lake Eppalock as fill and spill reservoir and irrigation outlet limited to 1,000ML/d Pre-release in Cairn Curran commenced on Wednesday 12 January Orders in operational areas reduced to nil Waranga Channel cuts across flood plain – expected issues Channel system was placed in “Flood Mode”

Loddon system Cairn Curran Reservoir – 147,130ML Gated spillway Peak January inflow 90,100ML/d Peak outflow 80,000ML/d Peak Tullaroop discharge 32,620ML/d Peak Laanecoorie discharge 195,000 ML/d Total January inflow 6 times previous record 100 times average

Loddon and Campaspe Flood Response & Recovery- Presentation G-MW - Who we are The story/event Response & recovery –Storages –Irrigation areas Impacts Lessons Questions

Dam operations

Response & recovery storages Essentially Identify triggers for incident management Establish team Monitor and route flows Monitor dam safety Ensure public safety Provide data to relevant agencies Repair damage Community info – clarify assumptions/angst Review operations & consider improvements Response Recovery

Gravity irrigation system v’s natural flow Natural land gradient south to north (storages to Murray River) Irrigation network east to west (Eildon to Boort) Gravity system - Design follows contours channel banks – above natural surface reducing capacity Infrastructure provisions at conflict points design criteria What happens when event > design

Integrated live system information Infrastructure status online Location and status of support requests Channel status Inspected Y/N Operational Y/N Monitor progress

Inspection status

Monitoring recovery

Flood Damage - Channel bank

Ovens Goulburn Broken Murray Loddon Bullarook Campaspe Regulated river systems 14,000 customers in 6 irrigation areas (channel network & pumped supply) Channel network Perth Sydney

Complexities Irrigation continues Natural carriers part of system Interference Limited access - intelligence and response Asset failures – physical & design Domestic and stock & dewatering Data collection, prioritisation & sharing across agencies, staff, customers Communications & power out. Not so Simple !!