MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES - 1987 Stormwater amendments.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Session 1 Outline Overview of Phase II What is expected? What should we be doing today? What are others doing? Suggested steps to move your program forward.
MS4 Permit and Storm Water Management Program Overview
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
NPDES Stormwater and the Town of Wrightsville Beach.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
TOWN OF NEW CASTLE PHASE II ANNUAL STORMWATER REPORT GP Effective May 1, 2010 Expires: April 30, 2015 Reporting Period: March 10, 2014-March 9,
City of Puyallup Planning Commission Presentation February 8, 2012.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
YOUR SCHOOL AND YOUR WATERSHED LORNA ROSENBERG- US EPA MID-ATLANTIC OCT 1-2, 2014 CHESAPEAKE BAY SCHOOLS WORKSHOP – SHEPHERDSTOWN, WVA.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
New Boise Area MS4 Permit Boise City Council Budget Workshop August 15, 2012.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Training Approach and Expectations 2/6/20161 Training Approach and What to Expect.
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
North Hennepin Community College MS4 Plan October 24, 2014.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Hampden Township Stormwater Management Program
Municipal Separate Storm Sewer System (MS4) Permit
STORMWATER MANAGEMENT
Summit County MS4.
Sacramento County Stormwater Quality Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

MS4 Stormwater Permit Program and Great Bay

Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments Two Phase approach to stormwater permitting Industrial activities Construction MS4s Phase II stormwater management program promulgated in 1999 Construction > 1 acre but less than 5 Small MS4s (population served < 100,000) General Permit for Small MS4s in MA and NH issued 2008 – MS expired, Draft Permit for NH MS4s public notice Final Permit expected early 2012

What is an MS4? A municipal separate storm sewer system is: A conveyance or system of conveyances owned by a state, city, town, or other public entity that discharges to waters of the U.S and is designed or used for collecting or conveying stormwater Includes roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains Does not include Combined sewers Parts of publicly owned treatment works Private systems

Summary of NH MS4 permit issuance Phase II regulated MS4s are those located in an urbanized area as defined by the latest Census NH Phase II regulated MS4s: 38 Traditional, 4 Non- traditional, 7 Waivers 2003 Small MS4 GP covered regulated small MS4s in MA and NH, expired 2008 (administratively continued) Draft NH Small MS4 General Permit issued for public notice MA versions issued in 2010 and 2011 Final Permit issuance expected early 2012 with spring 2012 effective date

Regulated MS4s in Great Bay Watershed Brentwood* Chester* Danville Dover Durham East Kingston* Exeter Greenland Hampstead Hampton Falls* Kingston Lee* Madbury* Milton Newington* North Hampton Portsmouth Rochester Rollinsford Sandown Somersworth NH DOT Strafford County Commissioners UNH * waiver under MS Phase II regulated MS4s are those located in an “urbanized area” (Census definition) Great Bay watershed MS4s:

MS4 Permit Structure Technology standard: reduce discharge of pollutants to the “Maximum Extent Practicable” Implemented through requirements for six “minimum control measures” Public education and outreach Public participation Illicit discharge detection and elimination Construction stormwater management Post-construction (development/redevelopment) Municipal good housekeeping/pollution prevention Water Quality based requirements & TMDLs

MS4 Implementation Stormwater Management Program (SWMP) “Best management practices” (BMPs) to implement six minimum controls and water quality based requirements Annual assessment and reporting Reports available on EPA website

Public Education and Outreach General program requirement Draft reissuance Specific audiences for education Specific education topics Specific number of educational messages Evaluation of the effectiveness of educational messages

Illicit Discharge Detection and Elimination (IDDE) Program 2003 permit: ordinance/regulatory mechanism, outfall map, establish procedures Draft reissuance: Complete system map More specific requirements for: Assessment of MS4 for illicit discharge potential Systematic procedure for locating and removing illicit connections, includes outfall inventory & monitoring Prevent illicit discharges and SSOs Track program success Annual employee training Sampling/monitoring

Construction 2003 Permit –Ordinance/ regulatory mechanism Draft reissuance Site plan review process Site inspections and enforcement Education

Post-Construction 2003 Permit – Ordinance/ regulatory mechanism covering new development and redevelopment Draft reissuance Regulatory program requirements for plan review, design criteria (1” capture), BMP maintenance requirements Assessment of street design to support low impact development Assessment of regulations to allow green infrastructure practices Tracking impervious areas (IA) and implement efforts to reduce IA

Good House Keeping 2003 Permit - Develop a written program to prevent/reduce stormwater pollution from municipal activities and facilities Draft reissuance Standard operating procedures – parks, buildings, vehicles, and roads Specific infrastructure maintenance requirements Stormwater Pollution Prevention Plans (SWPPP) for maintenance garages and waste handling facilities Facility inspections Employee training

Water Quality Requirements TMDLs Specific applicable BMPs identified Discharges to Impaired Waters BMPs addressing pollutant of concern to be included in SWMP

Nitrogen Reduction Potential through MS4 Requirements Target minimum Controls relevant to N reduction Education – fertilizer use, septic system maintenance IDDE – illicit discharges are potentially large source of nitrogen loads Post-Construction – require stormwater management effective in control of N, LID Good House Keeping – fertilizer use, infrastructure maintenance Water Quality based requirements – Final permit to include specific N requirements for Great Bay watershed

Questions? Susan Murphy U.S. Environmental Protection Agency (617)