Cross-Border Infrastructure: A Toolkit Clean Development Mechanism ( CDM ) Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad.

Slides:



Advertisements
Similar presentations
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Advertisements

Financing ERPAs: A Case Study of the Nova Gerar Landfill Gas Project Bruce Usher, CEO EcoSecurities Group Limited Carbon Finance Risk Mitigation Workshop.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
KYOTO PROTOCOL MECHANISMS EURASIA 歐亞 Solicitors and Advocates.
Energy Project Development A Discussion on State and Federal Incentives Presented By Dennis Plaster, General Manager.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Annual Meeting of the Host Country Committee on Carbon Finance Washington D.C. February 15-16, The World Bank Carbon Funds:
CONTRACTING FOR CARBON Legal Framework for JI Projects under the Kyoto Protocol.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
Carbon Finance at the World Bank Workshop on CDM and Africa Jinja, Uganda, 11 November 2005 Andrea Pinna.
The Learning Process and Technological Change through International Collaboration: Evidence from China’s CDM Wind Projects Tian Tang David Popp Maxwell.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Carbon Finance Instrument to Improve Coastal Zone Solid Waste Management MEDITERRANEAN WORKSHOP ON INTEGRATED COASTAL ZONE MANAGEMENT (ICZM) POLICY Alghero,
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
CDM Projects: Risks and Contracts charlotte streck pcf Sao Paulo, Brazil, November 22, 02.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
What Goes Into a Good PIN and a PCF Project? PCF Training Workshop on Project Formulation under the Clean Development Mechanism Hanoi, Vietnam September.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
Managing Risk and Uncertainty in Carbon Finance Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
Emission reduction value in financing clean energy projects By Jan-Willem Martens EcoSecurities.
Carbon Finance at the World Bank Workshop on Large Project Finance Maputo, Mozambique 31 May & June 1, 2007 Antonio Nucifora, Senior Economist, World Bank.
Managing carbon project risks Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
Overview of Carbon Markets Voluntary & Compliance Markets: Existing Carbon Reduction Units Vladimir Litvak RBEC Energy and Environment Practice Leader.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
3 – Clean Development Mechanism Introduction to Climate Change Wim Maaskant BGP Engineers – The Netherlands
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Overview on CDM By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Carbon Revenue and MFIs: Making it Work Marco van der Linden Ramesh K. Gautam.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
El Gallo Hydroelectricity Project PDD Analysis
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
LEGAL ISSUES FOR HOST COUNTRY CONSIDERATION CDM Workshop Kampala, June 6 to 8, 2001.
THE UN FRAMEWORK CONVENTION ON CLIMATE CHANGE (FCCC) Historical Aspects: In 1990 the UN General Assembly established a Intergovernmental Negotiating Committee.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Environmental Industries Sector Unit CDM Opportunities in South Korea Greg Dunne, Director, ICECAP Ltd. Seoul, 25 th September 2006 EISU Seminar Mission.
 Cap and Trade Application: Global Warming 6. 2.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Greening Canada’s International Purchases Climate Law Symposium December 3, 2005 Warren Bell, IISD.
Climate Change Mitigation and Complexity Agus P Sari Country Director, Indonesia EcoSecurities.
CDM –Functional Overview
KYOTO PROTOCOL.
Kyoto Protocol.
Presentation transcript:

Cross-Border Infrastructure: A Toolkit Clean Development Mechanism ( CDM ) Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Cross-Border Infrastructure: A Toolkit Kyoto Protocol ( 1 December 1997 ) Parties to the United Nations Framework Convention on Climate Change, New York, May 9, 1992 The Parties included in Annex I shall, individually or jointly, ensure that  their aggregate anthropogenic carbon dioxide equivalent emissions of the greenhouse gases listed in Annex A do not exceed their assigned amounts,  calculated pursuant to their quantified emission limitation and reduction commitments inscribed in Annex B and in accordance with the provisions of this Article,  with a view to reducing their overall emissions of such gases by at least 5 per cent below 1990 levels in the commitment period 2008 to 2012.

Cross-Border Infrastructure: A Toolkit Kyoto Protocol ( continued ) The Kyoto Protocol broke new ground by defining three innovative “flexibility mechanisms” to lower the overall costs of achieving its emissions targets. These mechanisms enable Parties to access cost-effective opportunities to reduce emissions, or to remove carbon from the atmosphere, in other countries. The three Kyoto mechanisms are: Joint implementation (JI) under Article 6 Annex I Parties to implement projects that reduce emissions, or remove carbon from the atmosphere, in other Annex I Parties, in return for emission reduction units (ERUs). Emissions trading, as set out in Article 17, provides for Annex I Parties to acquire units from other Annex I Parties, and,

Cross-Border Infrastructure: A Toolkit Clean Development Mechanism The clean development mechanism (CDM) defined in Article 12 provides for non Annex I Parties to implement project activities that reduce emissions resulting in certified emission reductions (CERs). The CERs generated by such project activities can be used by Annex I Parties to help meet their emissions targets under the Kyoto Protocol.

Cross-Border Infrastructure: A Toolkit Clean Development Mechanism ( continued ) CDM project activities must reduce emissions below those emissions that would have occurred in the absence of the CDM project activity (baseline). Article 12 also stresses that such project activities are to assist the developing country host Parties in achieving sustainable development and in contributing to the ultimate objective of the Convention. The CDM is supervised by the CDM Executive Board.

Cross-Border Infrastructure: A Toolkit Annex 12 (5) Kyoto Protocol Emission reductions resulting from each project activity shall be certified by operational entities to be designated (DOE) by the conference of the Parties serving as the meeting of the Parties to this Protocol, on the basis of:  Voluntary participation approved by each Party involved;  Real, measurable, and long-term benefits related to the mitigation of climate change; and  Reductions in emissions that are additional to any that would occur in the absence of the certified project activity.

Cross-Border Infrastructure: A Toolkit Types of Carbon Projects Hydroelectric power offsetting the need for coal- or gas- fired generation Extending grid to reach customers currently using diesel or kerosene Reducing CO2 and possibly methane (a potent greenhouse gas) by generating energy and bio-fuels from sugar industry by-products -- bagasse and molasses Replacing firewood/kerosene/cowdung with biogas from livestock and human wastes

Cross-Border Infrastructure: A Toolkit Types of Carbon Projects ( continued ) Extracting methane from landfills or avoiding its generation through composting organic waste in urban dumpsites Extracting methane from disposal of sewage sludge Capturing N20, a powerful greenhouse gas, from fertilizer production Sequestering CO2 by tree planting, small plantations, land restoration

Cross-Border Infrastructure: A Toolkit CDM Project Participants Project developer (sellers) CDM investors (buyers) Host country designated national authority (DNA) (approver) Designated operational entities (DOEs) (auditor) CDM executive board (EB) (regulator)

Cross-Border Infrastructure: A Toolkit CDM Project Stages Project design and development Approval Validation and registration Implementation Monitoring Verification and certification Issue of CERs (certified emissions reductions)

Cross-Border Infrastructure: A Toolkit CDM Project Cycle: Overview Verification / certification Approval / Validation / Registration Implementation / Monitoring Issuance Project Design & Development ER Project Owner National Authority Operational Entity Executive Board Project Owner Operational Entity Executive Board

Cross-Border Infrastructure: A Toolkit

Steps 1. Project activity design Project participants shall submit information on their proposed CDM project activity using the Project design document. 2. Proposal of a new baseline and/or monitoring methodology The new baseline methodology shall be submitted by the designated operational entity to the Executive Board for review, prior to a validation and submission for registration of this project activity, with the draft project design document.

Cross-Border Infrastructure: A Toolkit Steps ( continued ) 3. Use of an approved methodology The approved methodology is a methodology previously approved by the Executive Board and made publicly available along with any relevant guidance. In case of approved methodologies the designated operational entities may proceed with the validation of the CDM project activity and submit project design document for registration. 4. Validation of the CDM project activity Validation is the process of independent evaluation of a project activity by a designated operational entity against the requirements of the CDM, on the basis of the project design document.

Cross-Border Infrastructure: A Toolkit Steps ( continued ) 5. Registration of the CDM project activity Registration is the formal acceptance by the Executive Board of a validated project as a CDM project activity. Registration is the prerequisite for the verification, certification and issuance of CERs related to that project activity. 6. Verification is the periodic independent review and ex post determination by the designated operational entity of the monitored reductions as a result of a registered CDM project activity during the verification period.

Cross-Border Infrastructure: A Toolkit Steps ( continued ) 7. Certification is the written assurance by the designated operational entity that, during a specified time period, a project activity achieved the reductions in emissions by sources of greenhouse gases as verified.

Cross-Border Infrastructure: A Toolkit

Risk in CDM Projects Two main types of risk inherent in CDM projects:  Carbon specific risks and standard project risks  Both give rise to delivery risk Carbon asset risks  Whether the project, and ultimately the ERs, will be registered with the CDM Executive Board  The most significant component of regulatory risk is additionality risk, which relates to whether the project will be deemed additional by the CDM Executive Board  Approval of registration depends on the weight of evidence required to be submitted to the Executive Board.

Cross-Border Infrastructure: A Toolkit Risk in CDM Projects ( continued )  This is related to the baseline risk, which relates to the reliability of the baseline (the estimate of emissions that would have occurred without the project) e.g. does a hydro project replace a coal or gas plant CDM projects face structural difficulties in obtaining financing-  Tend to be highly capital-intensive  They are not competitive with fossil fuel technologies in economic terms  Financing generally is not available at low enough interest rates or for sufficient tenors to permit adequate debt service coverage  Moreover, many banks require additional coverage for country risk

Cross-Border Infrastructure: A Toolkit Carbon Funds The World Bank manages nine carbon funds and facilities comprised of public and private participants. These funds are public or public-private partnerships managed by the World Bank as a Trustee. They operate much like a closed-end mutual fund; they purchase greenhouse gas emission reductions from projects and pay on delivery of those emission reductions. All the emission reduction credits are purchased on behalf of the public and private sector participants in the funds.

Cross-Border Infrastructure: A Toolkit Carbon Funds ( continued ) The World Bank is acting as an honest broker to ensure that the benefits of carbon finance make their way also to the developing world and to countries with economies in transition. The role of the Bank through its Carbon Finance Unit has been one of market facilitator and catalyst. Sale of emission reductions can help secure financing for CDM projects by providing an additional high quality revenue stream -

Cross-Border Infrastructure: A Toolkit Carbon Funds ( continued )  Contracts are denominated in hard currency - usually US dollars or euros - as the known carbon buyers to date are in OECD countries.  Contracts are typically multi-year; for example, the Prototype Carbon Fund’s (PCF) typical ER contracts are for deliveries expected over a 10-year period or longer.  The counter parties are highly-rated: AAA-rated governments accounted for about half of known CDM and JI carbon purchases in , with investment- grade multinationals, largely banks and power companies, accounting for most of the rest.

Cross-Border Infrastructure: A Toolkit Carbon Funds ( continued ) To enable project sponsors to borrow against these revenue streams, the Emission Reduction Purchase Agreement (ERPA) developed by the World Bank’s Carbon Finance Business has the facility to enable ER payments to be placed in escrow.  This has permitted project sponsors to use the ERPA proceeds to service debt.  Placing the escrow account outside the host country mitigates currency convertibility and transfer risk.

Cross-Border Infrastructure: A Toolkit Nova Gerar (“New Generation”) Landfill Gas Project, Brazil SA Paulista, a Brazilian engineering and waste management company, with the concession to manage the Marambaia and Adrianopolis landfills on the outskirts of Rio de Janeiro EcoSecurities, a multinational environmental finance company, specializing in greenhouse gas mitigation Bruce Usher, CEO, EcoSecurities Group Limited, Carbon Finance Risk Mitigation Workshop, PPIAF, 19 November 2003, Paris

Cross-Border Infrastructure: A Toolkit Project Nova Gerar The objective of the Nova Gerar joint venture is to develop the landfill gas collection system on the landfills managed by SA Paulista. This involves investing in a gas collection system, leachate drainage system, and a modular electricity generation plant at each landfill site (with expected final total capacity of 12 MW), as well as a generator compound at each site. The generators will combust the methane in the landfill gas to produce electricity for export to the grid. Excess gas, and all gas collected prior to a grid connection will be flared.

Cross-Border Infrastructure: A Toolkit Project Nova Gerar ( continued ) Combustion and flaring combined reduce emissions of 11.8 million tons of CO2 equivalent over 21 years. Nova Gerar is negotiating an Emission Reduction Purchase Agreement (ERPA) with the World Bank to purchase all of the emissions reductions generated by the project up to 2012, and a right of first refusal for emissions reductions generated beyond that date. The World Bank is purchasing the emissions reductions as trustee for the Netherlands Clean Development Facility (NCDF), a CDM project facility.

Cross-Border Infrastructure: A Toolkit Nova Gerar Financing Uses Working capital: $250,000 Capital investment  Phase 1 - Flaring: $620,000 for flaring equipment and gas plant works  Phase 2 - Electricity generation (8 MW)  $ 350,000 for grid connection  $ 4,800,000 for power generators Sources Senior loan secured by ERPA: $1,220,000 Leasing: Modular power generators will be leased as needed.

Cross-Border Infrastructure: A Toolkit Monetisation of the ERPA Nova Gerar (Brazil) Lender World Bank (US) Debt Reserve Account $229,000 pa for 9 years (12% discount rate, declining principal balance) $1,220,000 lent today $472,000 to $1,701,000 pa $243,000 to $1,472,000 pa CERs ($125,000 to 450,000 pa) (9 years)

Cross-Border Infrastructure: A Toolkit CDM Case Study: Jincheng Coalmine Methane Power Project

Cross-Border Infrastructure: A Toolkit Project Rationale The project is at the Sihe coalmine located near the city of Jincheng in Shanxi Province. Shanxi is the largest coal-producing province in China. Methane gas in underground coalmines is an extremely explosive gas and a certain portion must be collected and vented to the atmosphere from coal seams to ensure miners’ safety. As required by law, JMC has installed a gas collection system in its mines to vent the methane directly to the atmosphere, thereby releasing a highly potent GHG. Methane is approximately 21 times more potent than carbon dioxide (CO2).

Cross-Border Infrastructure: A Toolkit Project Rationale ( continued ) The proposed project will collect a majority of the mine’s vented methane gas to fuel the proposed 120 MW power plants. GHG emission will be reduced when  the vented methane (CMM) is captured and used for power generation, and  when the generated electricity displaces electricity from coal-fired power plant in the grid.

Cross-Border Infrastructure: A Toolkit Role for CDM The revenue from the electricity sales alone will provide a low rate of return for the project because of the low power tariff rate in Shanxi Province. The additional revenue stream provided by selling carbon emission credits to the World Bank’s Prototype Carbon Fund (PCF), improves the economics of the project and reduces the investment risk. A baseline scenario would be that the recovery and utilization of methane is limited solely to internal mine and household usage, and most of the methane would be vented to the atmosphere for the safety of mine operations. The coal-fired plant would supply the least-cost power production.

Cross-Border Infrastructure: A Toolkit Project Development Objective & Key Indicators The project development objectives are to create and trade GHG emission reduction (ER) credits under the CDM by reducing GHG emissions through  capturing methane for power generation, and  replacing grid electricity generated by coal-fired power plants. Project outcomes will be measured by three groups of indicators:  The volume of methane captured annually.  The amount of electricity from coal replaced annually.  The ER credits created and traded annually.

Cross-Border Infrastructure: A Toolkit Project Components The project consists of the following four subcomponents: Underground CMM recovery.  The use of new equipment and technologies is expected to increase CMM drainage efficiency by 100 percent and the methane content of the drained CMM by 80 percent The 120 MW power plant.  A power plant comprising a total of about 32–96 internal combustion (IC) engines with a total capacity of 120 MW  The IC engines are installed during a four-year period. The power transmission line. Capacity building and consulting services.

Cross-Border Infrastructure: A Toolkit Project Cost Estimates Item Total cost (US$ million) Underground CMM drainage and recovery CMM-fired power plant and transmission lines Resettlement 1.20 Consulting services 1.18 Staff training 0.60 Institutional strengthening 0.46 Contingency Interest during construction Total

Cross-Border Infrastructure: A Toolkit Financing Plan (US $ million) SourceAmount% A. Loans 1. Asian Development Bank Local commercial bank Subtotal (1) B. Equity Capital 1. Jincheng Mining Corp Subtotal (2) Total

Cross-Border Infrastructure: A Toolkit Financing Terms The ADB loan will have a 24-year term including a grace period of 4 years. In calculating WACC,  It is assumed that a fixed interest rate of 4.3% will apply. The local commercial bank loan is expected to have a 15-year repayment period, including a grace period of 4 years,  Currently the interest rate is fixed at 5.76% per year. Foreign exchange costs are estimated at US$ 82 million and local currency costs at US$ million equivalent.  This matches the currency of financing Weighted Average Cost of Capital = 4.96%

Cross-Border Infrastructure: A Toolkit Institutional & Implementation Arrangements The sponsor of the project is JMC, a corporatized entity fully owned by the Shanxi provincial government. It has a large operation in developing coalmines, selling coal and generating power. The project will be implemented according to the Emission Reduction Purchase Agreement (ERPA) to be signed between JMC and the World Bank, as trustee of the PCF. A monitoring plan (MP) will be agreed between parties to the ERPA.

Cross-Border Infrastructure: A Toolkit Implementation Arrangements ( continued ) ERPA and MP define the quantity, price and other delivery conditions for ERs to be purchased by the PCF, as well as monitoring and verification systems and methods. Verification and certification of ERs generated annually by JMC will be coordinated by the PCF, which will ultimately purchase the ERs.  The PCF will retain the services of an internationally recognized, fully independent third party to verify and certify the project ERs.

Cross-Border Infrastructure: A Toolkit Implementation Arrangements ( continued )  The verifier will determine whether the project complies with the design and implementation specifications and meets the requirements.  Annual verification of ERs generated for the previous year will be recorded in a verification report. A certification will allow the ERs to be internationally traded. The PCF will purchase only ERs that are verified. According to requirements of the Kyoto Protocol, the Government of China will operate a registry to manage the transfer of ERs generated by the project.

Cross-Border Infrastructure: A Toolkit Risk Mitigation RiskRisk mitigation measure From outputs to objective GHG ER credits not created and traded - Government of China has ratified the Kyoto protocol - Effective in February From components to outputs Low level of electricity generation because of inadequate resources - Resource assessment has been conducted by JMC and well-known international consultants. - Additional CMM is available from nearby mines. Low availability of power units because of new technologies - Technologies sufficiently proved elsewhere, - International consultants to assist their applications here. Delays in finalizing power sale to the grid company and disadvantage power pricing - Construction of the power plant agreed by the grid company and approved by the government.

Cross-Border Infrastructure: A Toolkit Risk Mitigation ( continued ) RiskRisk mitigation measure Low level of power generation because of power market saturation - Shanxi is currently suffering from power shortages, and a high-demand growth is expected for many years. Social and environmental issues inadequately addressed - JMC has carried out comprehensive social and environmental impact assessment, Safety issue inadequately addressed - Safety is a top consideration during the design of the project, - Vigorous safety plan is in place

Cross-Border Infrastructure: A Toolkit Sensitivity Analysis

Cross-Border Infrastructure: A Toolkit Sensitivity Analysis