C&D & MRFs Willamette Resources, Inc. Wilsonville, OR Armando Arellano, LEED AP BD+C, O+M Willamette Resources, Inc. Wilsonville, OR Armando Arellano,

Slides:



Advertisements
Similar presentations
Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Advertisements

MIXED NHIC WASTE TIPPED INSIDE WASTE RECEPTION BAY.
Richard A. Ludt Waste Management Administrator Interior Removal Specialist, Inc. LEED ® AP.
ANSI/ASHRAE /USGBC/IES/ Standard AND ITS REQUIREMENTS COMPARED TO LEED V 3 Presented by: Rachael Green Huitt-Zollars; USGBC North Texas Chapter.
A Free, Confidential & Non-Regulatory Program Smart Waste Management alternatives for Iowa business & industry Reduce Reuse Recycle.
Construction Waste Management in Hospitality Industry Paul Cetola - LEED AP Allied Waste Services.
Kent Enviropower Limited Allington Materials Recycling Facility Update April 2011 James Stapeley.
Sustainability at Sarah’s Oasis! E. Who are we? E.
Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
Construction and Demolition Waste Management at UVM
Construction + Demolition Waste Trends Trends in Construction and Demolition Waste in Oregon AOR Construction and Demolition Recycling Forum March 15,
Recycling Tear Off Shingles in Bituminous Pavement Ramsey County 2007 Lower Afton Road Trail Project By Jerry Auge, Jr. – Project Manager
Albuquerque Recycling Now & In the Future Mayor Martin J. Chávez __ Ed Adams, P.E., Chief Administrative Officer Irene García, Chief Operations Officer.
„Business opportunities in waste treatment” Conference -Tel Aviv
ENVIRONMENTAL PROTECTION AGENCY CITY OF COPENHAGEN COPENHAGEN WASTE MANAGEMENT.
How Many Pounds of Trash Do We Collect in One Week? BY MAKENZIE AND MICHAEL.
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
Introduction The Institution Recycling Network 7 South State Street Concord, NH John Gundling, CWM Specialist.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Boğaziçi University Institute of Environmental Sciences E.Sc 531-Solid Waste Management Duygu Dinçer Mechanical Separation & Processing of MSW.
Miami Dade Resources Recovery Facility Operated By: Montenay Power Corporation.
CONVERSION TECHNOLOGIES MARKET IMPACT ASSESSMENT CIWMB Board Meeting September 22, 2004 Susan V. Collins Hilton Farnkopf & Hobson, LLC.
The role of waste management and energy from waste in a circular economy- SITA UK’s proposed Severnside development Sept 2009 Stuart Hayward-Higham.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Solid Waste and Recycling Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 9/14/
Green Recycling Network Toward a Greener Tomorrow... Today!
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
NEW RULES NEEDED TO GET TO ZERO WASTE R.V. Anthony Richard Anthony Associates, San Diego, California GRRN Recycling and Zero Waste Conference Devens, Massachusetts.
Roadmap to a Sustainable Waste Management Future Waste Diversion Strategies in the Unincorporated Communities of Los Angeles County Throughout the Region.
Recycling and Reuse Policy for C&D Waste Justin Green Program Director Build It Green!NYC.
WasteCap Resource Solutions, Inc.. WasteCap Resource Solutions Nonprofit 501(c)(3) Providing waste reduction and recycling assistance for the benefit.
California Integrated Waste Management Board March 16, 2004 San Jose, CA City of San Jose Diversion Programs.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
The Environmental Investment Program 20 YEARS OF RECYCLING MARKET DEVELOPMENT IN NEW YORK Linda Jacobs, Environmental Services Unit GRRN Recycling and.
Athens Services. History and Capabilities Athens Services established in Los Angeles in 1958 Athens Services established in Los Angeles in 1958 Family.
Waste Management: Sustainability and Recycling Woodland Rotary February 4, 2009.
Construction and Demolition Waste Management at UVM.
CONVERSION TECHNOLOGIES MARKET IMPACT ASSESSMENT Preliminary Results Workshop April 15, 2004 Susan V. Collins Hilton Farnkopf & Hobson, LLC.
Consideration of Contractor Targeted Statewide Waste Characterization Studies CIWMB Board Meeting May 11-12, 2004.
City and County of San Francisco Construction and Demolition Debris Recovery Ordinance No Effective July 1, 2006.
The Recycling Journey Stage 1. Collection On collection day the recycling vehicle empties the contents of your blue bin into the lorry.
Sorting Film Plastics in MRFs Current Status Current single-stream sorting technology depends heavily on rotating shaft screens. Film plastics wrap on.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
CASELLA RESOURCE SOLUTIONS ZERO-SORT® RECYCLING COLLECTION ORGANICS ENERGY LANDFILLS casella.com 1 Bob Cappadona Vice President Casella November 5, 2015.
Session 1: Initial Steps May 19, Why Don’t People Recycle???? Recycling? Who Cares! Recycling? Where Can I Recycle? Recycling? How am I Going to.
Presentation of Contractor’s Report “California 2008 Statewide Waste Characterization Study” CIWMB Strategic Policy Development Committee September 9,
Board Workshop: Overview Of CIWMB Waste Characterization Studies and Tools May 9, 2006.
Sustainability and Market Development Committee Meeting December 9, 2004 Agenda Item S Oral Presentation Regarding The Results of the Study To Update Statewide.
Oral Presentation Of Results Of The 2005 Targeted Statewide Waste Characterization Studies (FY BCP #2 “Update Statewide Waste Characterization”)
We recycle! Enjoy Learning Science. We recycle! It is made of glass. It is made of metal. It is made of cardboard. It is made of plastic.
Recycling of Solid Waste February 10, 2016 Russell Schreiber, P.E. Director of Public Works.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
Recycling in the IVAR - region Sibiu, november 2009 Tron Ree, Chief engineer IVAR IKS.
© PlasticsEurope 2016 PLASTICS… TOO VALUABLE TO BE THROWN AWAY.
Innovative Construction and Demolition Initiatives Mark Maxwell Emily DeCremer.
Chemistry Project Solid Waste 1. Municipal waste ( 城市廢物 ) 2. Construction & demolition waste (C&D) 3. Chemical waste 4. Special waste 5. Other solid.
Recycling & Composting Programs for Businesses
What Does Universal Recycling Mean for You?
Portsmouth Solid Waste Disposal Critical Decisions
Seerdrum Processing of Municipal Solid Waste
Construction Debris Best Management Practices
The New Construction and Demolition Debris Waste Ban Amendments
Collection Systems Designing Collection Systems that Keep Materials Out of Landfills and Incinerators.
City of Durham Solid Waste Management
Fauquier County’s Journey of Construction and Demolition
How Much Food Waste is Really Available in the Waste Stream
NC Marine Debris Symposium
Tajiguas Resource Recovery Project Doing More with Our Waste
Hong Kong Landfills.
Presentation transcript:

C&D & MRFs Willamette Resources, Inc. Wilsonville, OR Armando Arellano, LEED AP BD+C, O+M Willamette Resources, Inc. Wilsonville, OR Armando Arellano, LEED AP BD+C, O+M

Material Recovery Facility, (MRF) Non recoverable residual waste is transferred to a landfill  Purpose Accept and process industrial, commercial, demolition and construction debris to recover recyclable and reusable materials, and process source separated recycling for follow-on markets.  Purpose Accept and process industrial, commercial, demolition and construction debris to recover recyclable and reusable materials, and process source separated recycling for follow-on markets.

MRF Benefits  Benefits of MRFs  Higher recovery rates are attained  Familiar with diverse markets  Space limitations at job sites  Can save contractors time and money  Benefits of MRFs  Higher recovery rates are attained  Familiar with diverse markets  Space limitations at job sites  Can save contractors time and money

Tipping Operations  Loads identified at the scale house  Mixed waste, LEED, wood, etc.  Loads tracked from scale  Tipping area is isolated  Inspection  Recovery method accessed  Floor  Mechanical  Loads identified at the scale house  Mixed waste, LEED, wood, etc.  Loads tracked from scale  Tipping area is isolated  Inspection  Recovery method accessed  Floor  Mechanical

Recovery Methods  Floor Sort  Negative sort  Minimal contamination  Example – All wood with a small amount of trash bags  Mechanical Sort Line  Positive sort  Various materials  Example – Demolition debris containing wood, metal, cardboard, wire, piping, trash, etc.  Floor Sort  Negative sort  Minimal contamination  Example – All wood with a small amount of trash bags  Mechanical Sort Line  Positive sort  Various materials  Example – Demolition debris containing wood, metal, cardboard, wire, piping, trash, etc.

Processing line  Straight line  Through put  C&I 25 TPH  C&D 15 TPH  ADC Screen  1” minus  C&D %  Six upper level, sorting stations  Versatile  Straight line  Through put  C&I 25 TPH  C&D 15 TPH  ADC Screen  1” minus  C&D %  Six upper level, sorting stations  Versatile

Processing line  2011 Results  EDWRP  1.55%  Diversion From Landfill  40%  2011 Results  EDWRP  1.55%  Diversion From Landfill  40%

Market Sensitive  Contamination Sensitive  Clean sheetrock, film plastics, paper, carpet pad, etc.  Contamination Sensitive  Clean sheetrock, film plastics, paper, carpet pad, etc.

LEED and MRFs MR2 Points  Divert 50% waste from Landfill or incineration = (1 point)  Divert 75% waste from Landfill or incineration = (2 points)  Divert 95% waste from Landfill or incineration attains exemplary performance 1 additional point  Total possible points under MR credit 2 = (3 points) MR2 Points  Divert 50% waste from Landfill or incineration = (1 point)  Divert 75% waste from Landfill or incineration = (2 points)  Divert 95% waste from Landfill or incineration attains exemplary performance 1 additional point  Total possible points under MR credit 2 = (3 points)

LEED Reporting LEED team Project Site Const. / Demo. Contractor MRF Recycling Markets Landfill Hauling Company MRF Recycling Market Landfill Recycling Markets

Sample Project Report

Thank you