October 2009. Opening Session  Introductions  Constructability Evaluation Form (Section 13.2) p.htm.

Slides:



Advertisements
Similar presentations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Advertisements

Student Life Contracts 101 Office of Student Life.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
STUDENT ORGANIZATION TRAINING FINANCE MODULE 4 – PERSONAL SERVICES AGREEMENTS Effective January, 2015.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
INDOT Contractor Prequalification.
PRP Purchase Order Invoice Processing August 6, 2014 Sharon Lee - PRP Accounting Lauren Mackey - PRP Accounting (York)
Certification & Payment March 2, Outline Rules of Payment Certification and Payment by Program Documentation Cost Analysis Spreadsheet.
Sales & Marketing Compliance Training
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Page Bill of Collections and Overpayments – Federal Contracts November 10, 2011 Midwest SBLO Meeting.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Deliverable Acceptance and Invoice Procedures.
October Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made.
0 Office of the Under Secretary of Defense, (Acquisition, Technology and Logistics) Working with the Department of Labor “101” What to do if DoL investigates.
PROACTIS: Supplier User Guide Contract Management.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
Updated 08/10/   This user guide serves the following purposes:  Introduce users to UMeNET login procedures and UMeNET.
ECheck Requisition System Updated 12/29/2008https://enet.miami.edu/
Updated 06/29/  Objectives This user guide serves the following purposes: Introduce users to UMeNET login procedures and.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Chief Executive Office Risk Management RETURN TO WORK Unit
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
Point and Click Certificate Management Charlotte, NC Ph: Web:
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
TOOLS To successfully implement Section 3 requirements on construction projects Tom Crabson, CDBG Contract Compliance Officer Community Development Commission,
Withholding Compliance Program
Allen Hughes State Materials Office
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Introduction to the Claims Process. If a customer contacts you and asks to make a claim, you must: 1)Complete the Stay connected Cellphone Replacement.
Contractor having difficulties performing work Contract Default Read Spec section 8-9. Talk with DCE about options. Various letters of concern may come.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Contract Training Class I
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts LAUSD Contracts Application.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Financial Aid Profile Day Spring 
STEP BY STEP GUIDE AFTER THE UNIT RESERVATION STAGE
Click here to create a new account Click here to check the system for an existing account Enter the site by typing in your User ID and Password and clicking.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
EBC Flex Help Accessing the website and your account.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Commercial Plan.
Electronic Business Robert Shaw & Cindi Bernhardt  12/4/2015.
Docket number CP16-21 Tennessee Gas Pipeline, LLC (the Northeast Energy Direct pipeline)
December,  No official date for full switchover from RMS 2.38 to RMS 3.0  State of the RMS Support Contract  Expect regular updates once per.
Owner Has Idea and Conducts Feasibility Study Go No Go End of Project Pursue A/E/C or Design-Build Team Hire A/E/C to Design and Build Project Scope of.
Children System of Care Application Process for Behavioral Assistance & Intensive In-Community Department of Children and Families, Children’s System.
KYTC Change Order (Contract Modifications).
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
Washington State Auditor’s Office Third Party Receipting Presented to Washington Public Ports Association June 2016 Peg Bodin, CISA.
Historically Underutilized Business (HUB) Requirements.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Evaluation Grids Evaluation Grids.
Historically Underutilized Business (HUB) Requirements
Acceptance Process for Manufactured Products by Certification:
Completing the State Aid Payment Request
ICOTS Helpdesk Training
Facilities Maintenance Extension
NORTHEASTERNERS, INC. IRS 990 filing instructions presentation
Introduction to Invoicing
Step 3: You will see this page
Completing the new online form
Completing the new online form
Presentation transcript:

October 2009

Opening Session  Introductions  Constructability Evaluation Form (Section 13.2) p.htm p.htm  Default Process  Cross Slopes  Overbuild  When to use a Unilateral / Reservation of rights (Section 7.3) p.htm p.htm

Unpaid Bills  When an unpaid bill notice is received, forward a copy to your Resident Contracts Coordinator.  The Resident Contracts Coordinator will send a letter to the Prime Contractor with a copy to the P.A.  The P.A. is to contact the Prime Contractor and determine if there is good cause demonstrated for not paying the sub.  The PA should communicate this information to the Resident Contracts Coordinator.  m/New%20Clean%20Chapters/Chapter6s1.pdf m/New%20Clean%20Chapters/Chapter6s1.pdf

Unpaid Bills  If it is discovered that the Prime Contractor does not have good cause for withholding payment, then the DCE will determine if further payments will be made.  The P.A. will inform the contractor in writing of this decision  The Certification Disbursement of Previous Payment to Subcontractors should reflect any unpaid bill claims and include the required back-up documentation.

Material Certifications  Sample Certification forms can be found at: ation/resources/library/publications/certificati ons/sampleforms.htm ation/resources/library/publications/certificati ons/sampleforms.htm  Most require company letterhead and the signature of a “Manufacturer Officer or Designee”  The original should be maintained in the contract files and copies should be submitted to the SMO.

Material Certification  The search engine at the link here below helps research the requirement for any material. The ones requiring a certification will either be sampled by project personnel (PP) and tested by PP… or sampled by PP and tested by Central Lab (CL) [same as state materials office (SMO)]:  A material Id coming up as a general material certification that needs to be scanned into hummingbird will have “SCAN INTO CDMS” under sample size.  All other general material certifications will require “1 COPY” logged in LIMS and sent to the SMO laboratory with the LIMS-Sample ID or will specify “CHECK QPL”  Also see: Materials Bulletin # “Changes to Logging Samples”: 008/DCE23-08Rev.pdfhttp:// 008/DCE23-08Rev.pdf

Hummingbird  Hummingbird Information Hummingbird Information  /sop.htm /sop.htm  Groups & Types  /DCO%20Reference%20Guide/Hummingbird/ Groups%20and%20Types.pdf /DCO%20Reference%20Guide/Hummingbird/ Groups%20and%20Types.pdf