100-year Event Analyses of Storm Sewers and Overland Flow Considerations as Applied in Chapter 9 of the City of Houston Design Manual Prepared for the.

Slides:



Advertisements
Similar presentations
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Advertisements

PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
STUDY OF THE STORM DRAIN SEWER OF THE URBAN CATCHMENT OF LA RIERETA, SAN BOI DE LLOBREGAT, SPAIN TEAM 3: 1. Aline Veról 2. José Rivero 3. Pedro Ramos 4.
NETWORK SIMPLIFICATION 1D/1D dual-drainage simulation.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Experience with SuDS in Dublin December 2007 Padraig Doyle Senior Project Manager Mott MacDonald Pettit IEMA Conference Are SuDS the answer for drainage?
CE 515 Railroad Engineering
Design of Hydraulic Controls & Structures
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Marine Auxiliary Machinery
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
Biet Qad Village Climate Relative Humidity Evaporation.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering AguaRed.
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
1 Urban Drainage and Intersection Design Image:
Hydraulic Modeling of Water Distribution Systems
Micro Design. System Capacity D = gross application for what ever time period ( hrs, day or days) T= hours in time period used to decide “D” (max.
Li-Chuan Chen, Marian Muste, and Larry Weber
Integrating LID Into the Development Planning Process.
CHAPTER 2: Flow through single &combined Pipelines
SAINTPAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module 7 Stormwater Management.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Underground Systems: Hydraulic Design
Prepared by Musab O. JayyousiOsama H. Shaheen Dr. Mohammad N. Almasri Modeling and Management of the Stormwater of the Old City of Nablus Nablus – Palestine.
Miami. Miami: Climate Miami’s client is similar to Houston in several ways. It has one of the highest levels of rainfall of any major U.S. city. It receives.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
1 VIRGINIAWORKSHOP Feb. 28 – Mar. 3, 2006 INTRODUCTION to SITES for WATER RESOURCE SITE ANALYSIS.
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Urban Storm Drain Design: Laterals. Sizes Laterals carry water from inlets into junction boxes, where it leaves by a trunk line. The HGL of laterals can.
Urban Storm Drain Design: Conduit design. Sizing Conduit size is computed based on the discharge expected at the upstream node; Typically is done by the.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
Sanitary Engineering Lecture 7
Sandra Blick / Meeta Trivedi Hydrology & Hydraulic Unit – NJDOT BLAES
Water Drainage System Harris County, TX
Storm Sewer Assessment for South Newport Subdivision
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
Welcome to the Libertyville Stormwater Master Plan Open House
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Development Charge Public Meeting October 23, 2017
CE 3372 Water Systems Design
WEST & EAST DISTRICT PROJECTS PRESENTATION
Coursework guidelines
Basic Hydrology & Hydraulics: DES 601
Town of Melbourne Beach
Navigating FDOT Specifications and Standards
Prepared By : Osama amr Qutayba mElhim
Tulsa's Risk MAP Program Goals
Design of A Sewer Network For Tell Village (Sewer collection network)
Model Water Efficient Landscape Ordinance
Design of A Sewer Network For Dair-Istiya Village
Design of A Sewer Network For Siries Village
Love Field Modernization Program
Presentation transcript:

100-year Event Analyses of Storm Sewers and Overland Flow Considerations as Applied in Chapter 9 of the City of Houston Design Manual Prepared for the HCEC Drainage Committee January 6, 2005

2 1.Chapter 9 – Storm Water Design Requirements 2.Comments Received 3.Overland Flow Analysis INTRODUCTION

3 Chapter 9 – Stormwater Design Requirements Revised Criteria 1.Detention All calculations based on increased impervious area (IIA) <1 ac; 0.2 ac-ft/ac IIA; exempt single family residential <15K sf 1ac to 50 ac; 0.5 ac-ft/ac IIA; release at 0.5 cfs/ac, 2 cfs/ac, 2 cfs/ac (100 yr) >50 ac; comply w/HCFCD 2.Overland (Sheet) Flow for Extreme Event (100-yr) HGL at or below natural ground at ROW Max ponding of 6-inch above curb at high point (current criteria) Max ponding of 18-inch above curb at low point (current criteria) Claification/emphasis – no change to existing sheet flow patterns; no discharge to abutting private property 3.HouStorm Required analysis method for CIP projects and City funded within City limits Privately funded in City limits and EJT; HouStorm preferred but not required

4 Comment:There is no problem that needs addressing. Response:The City has determined, as a policy, that more stringent storm water management practices are needed to provide an increased level-of-service to our citizenry.

5 Comment:This criterion and procedure provides no benefit. Response:Benefit is deemed by the City to include reductions in water surface elevations and the proper management of overland flow during an extreme event, which this criterion addresses. Structural flooding, or the lack thereof, is not the only issue at hand.

6 Comment:All you are doing is sizing the storm sewers for the 100-year flow. Response:This is an incorrect statement. The storm sewer remains sized for a 2-year event. The City criteria simply requires that the storm sewer system be analyzed for behavior under the 100- year event in conjunction with due consideration of overland flow.

7 Comment:Increases in head on a storm sewer does nothing to increase the flow. Once the storm sewer reaches its 2- year capacity it will not receive any more flow. Response:If all conduit conditions remain unchanged, an increase in driving head will result in an increased flow through the conduit. Conversely, an increase in conduit size or reduction in friction loss will result in a decrease in driving head (i.e. upstream water surface elevations).

8 Comment:Overland flow is completely ignored and by imposing the concepts applied within TP-101 we are eliminating the consideration of overland flow. Response:The consideration of overland flow is particularly referenced as a critical element in the design process. TP-101 simply provides a simplified means of adjusting anticipated maximum water surface elevations via adjustments to the storm sewer HGL. Further requirements (i.e. a plotted hydraulic profile) exemplify the study and consideration of overland flow pathways for project areas.

9 Comment:No provision was made in TP-101 to address detailed overland flow determination procedures. Response:The intent of TP-101 is to provide a simplified manner of controlling anticipated maximum water surface elevations. The paper specifically addresses that more elaborate means of analyzing overland flow may be invoked if deemed warranted; however, it is beyond the subject matter of this paper to detail such an analysis process.

10 Comment:Areas that are inundated by floodwaters or have high existing 25-year tailwater elevations can never be developed or redeveloped. Response:In project situations where the 100-year water surface elevation, or less (i.e. 50 or 10-year), already inundates the project area(s), for whatever reason, it is not the intent of these guidelines or this criterion to require the design engineer to resolve problem areas beyond their reasonable control. Chapter 9 stipulates this criterion and allows the submittal of documentation demonstrating this project situation. This applies to cases where lower starting water surface elevations for the 100- year analysis are justified.

11 Comment:This criterion and procedure adds too much cost to the project. Response:Case studies have indicated that the construction cost increases for private projects have ranged from 0 to 11% in storm sewer cost only. The resulting total project cost would be less.

12 Comment:This criterion and procedure adds too much additional design time. Response:The additional design time has been determined to be very minor based upon all test cases.

13

14 Project ABC Storm Sewer Cost Project ABC Original Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 2925$46.00$42, $56.00$27, $70, Altered Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 2925$46.00$42, $56.00$27, $70, Change in Storm Sewer Cost0.00%

15

16 Project LMN Storm Sewer Cost Project LMN Original Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 23898$46.00$179, $110.00$225, $144.00$36, $73.00$16, $176.00$30, $488, Altered Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 22916$46.00$134, $56.00$54, $110.00$64, $115.00$168, $144.00$28, $176.00$41, $73.00$16, $507, Change in Storm Sewer Cost3.90%

17

18 Project XYZ Storm Sewer Cost Project XYZ Original Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 21660$46.00$76, $56.00$1, $73.00$15, $93, Altered Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 21660$46.00$76, $56.00$1, $73.00$15, $93, Change in Storm Sewer Cost0.00%

19

20 Project QRS Storm Sewer Cost Project QRS Original Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 21171$46.00$53, $56.00$14, $73.00$3, Inlets - total 15 $1,500.00$22, Manholes total 14 $1,700.00$23, $118, Altered Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 2611$46.00$28, $56.00$31, $73.00$22, Inlets - total 15 $1,500.00$22, Manholes total 14 $1,700.00$23, $127, Change in Storm Sewer Cost8.40%

21

22 Project PQR Storm Sewer Cost Project PQR Original Design Pipe Size (ft)Length of PipeCost per footTotal Cost 2 RCP795$46.00$36, x 5 RCB101$206.00$20, Inlets - total 8 $1,500.00$12, Manholes total 9 $1,700.00$15, $84, Altered Design Pipe Size (ft)Length of PipeCost per footTotal Cost 2 RCP795$46.00$36, x 5 RCB101$206.00$20, Inlets - total 8 $1,500.00$12, Manholes total 9 $1,700.00$15, $84, Change in Storm Sewer Cost0.00%

23

24 Project JKL Storm Sewer Cost Project JKL Original Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 2922$46.00$42, $56.00$13, $73.00$25, $81, Altered Design Pipe Diameter (ft)Length of PipeCost per footTotal Cost 2686$46.00$31, $56.00$13, $73.00$30, $88.00$15, $90, Change in Storm Sewer Cost11.02%