Hydrologic Analysis for CAMP Environment, Fish and Wildlife Working Group Briefing for ESHMC May 6, 2008.

Slides:



Advertisements
Similar presentations
Washington Department
Advertisements

Moffatt Thomas Lower Boise River Wetlands Restoration Project Sponsor:Pioneer Irrigation District Presenter: Scott L. Campbell Legal Counsel for Pioneer.
Glen Canyon Dam Adaptive Management Program WY 2000 Low Steady Summer Flow Randy Peterson, BOR Barry D. Gold, GCMRC A Test of Concept.
Curlew Valley Water Issues Public Meeting April 28, 2009.
Blue Lakes Stream Gauge Improvement and Lake Level Stabilization Project: Summary of Dye Tracer Testing City of Twin Falls September 12, 2011.
Application of System Dynamics to Sustainable Water Resources Management in the Eastern Snake Plain Aquifer Jae Ryu Department of Biological and Agricultural.
Spokane-Rathdrum Aquifer Study Preliminary Project Scope March 2002 Idaho Department of Water Resources Idaho Department of Environmental Quality Idaho.
Idaho Water Supply Committee Meeting Southwest Idaho Report March 8, 2012.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
IDWR Water Supply Meeting May 12, 2011 NRCS Snow Survey Measuring Lost Lake SNOTEL Site, elevation 6,110 feet, along the NF Clearwater and St Joe Divide.
Modeling the Snake River Basin Future Streamflow Scenarios and System Response for the Snake River Basin Update- Nathan VanRheenen Richard N. Palmer.
2007 Idaho Water and Climate Forecasts October 17, 2006 Hosted By Climate Impacts Group And Idaho Department of Water Resources.
2005 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
2006 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
Idaho Water Resources Research Institute
Review of the 2009 Snowmelt and Rain Streamflow Forecasts & Snow Survey Advisory Team Ron Abramovich, Hydrologist Water Supply Specialist USDA Natural.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
ESHMC Meeting 6 May 2008 Stacey Taylor. Overview Model river representation in ESPAM 1 What data is available to make changes for the new stress periods.
SNAKE RIVER GROUND WATER TRANSFERS Climate Impacts Group May 13, 2003 Don Reading Richard Slaughter.
2007 Idaho Climate and Water Forecast Workshop Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
PACIFIC REGION U.S. FISH & WILDLIFE SERVICE JANUARY 13, 2010 BULL TROUT Proposed Critical Habitat.
Eastern Snake Plain Comprehensive Aquifer Management Plan A Positive Path Forward Hal N. Anderson June 11, 2009.
Snake River Plain Model Upgrade Base Case Scenario Donna M. Cosgrove Idaho Water Resources Research Institute University of Idaho.
SWC Methodology - TWG February 19, 2015 Settlement Document Subject to I.R.E. 408.
Return Flows Discussion Continued ESHMC Meeting 6 May 2008 Stacey Taylor.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
RiverWare User’s Group Meeting Pecos River Adjudication Settlement: Application of an Integrated Surface and Ground Water Modeling System June 18, 2003.
IDWR PUBLIC HEARING February 28, 2012 Mountain Home, ID.
Boise River Accounting Liz Cresto February 26, 2013.
Honorable Eric J. Wildman, SRBA District Court Chris M. Bromley, Deputy Attorney General* * All opinions expressed herein are those of the presenter and.
ESPA Comprehensive Aquifer Management Plan Public Meetings December 2, 4, Idaho Water Resource Board Jonathan Bartsch--CDR Associates.
Understanding Ground Water Modeling Gary Johnson Donna Cosgrove Idaho Water Resources Research Institute University of Idaho Idaho Falls.
SWC Methodology - TWG February 11, 2015 Settlement Document Subject to I.R.E. 408.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
Hydrological Energy By:Saeed Merghani and Dalal Dumaidi.
1 New Scenario: "Current Policy" or "Continued Changes in Practice" ESHMC Meeting 13 November 2007 B. Contor.
Center for Science in the Earth System Annual Meeting June 8, 2005 Briefing: Hydrology and water resources.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
Idaho Water Supply Committee Meeting Southwest Idaho Report March 14, 2014.
Presented By: David Richards Idaho Falls Water Superintendent MUNICIPAL WATER RIGHTS A LOOK AT HOW THE CONJUCTIVE MANAGEMENT RULING IMPACTS TODAY’S MUNICPAL.
HISTORICAL OVERVIEW OF CONJUNCTIVE ADMINISTRATION OF ESPA WATER SOURCES PREPARED BY CLIVE J. STRONG FOR GOVERNOR’S WATER SUMMIT APRIL 17, 2007.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007.
Evaporation in Texas CE 394K.2 Spring Evaporation In Texas  Evaporation is an important component of the hydrological cycle.  Globally volumes.
Columbia Basin Water Transactions Program January 14, 2005 A Presentation to the Oregon Water Resources Commission.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Mountain Home Plateau Ground Water Conditions and Management Activities Presented to the Idaho Legislature Natural Resources Interim Committee By Helen.
Findings of Congress The Endangered Species Act is the last resort for species at risk of extinction. Under the ESA, the National Marine Fisheries Service.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
Progress Report Swan Falls Technical Working Group Presented to the Swan Falls Policy Group by Sean Vincent June 27, 2013.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
College of Engineering/ College of Agricultural and Life Sciences Department of Biological and Agricultural Engineering Historic Irrigation in the Snake.
Progress Report Snake River Measurement Technical Committee Presented by Sean Vincent March 12, 2012.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
Aquatic Life / Habitat Assessment Project PAR 991 June 30, 2006.
Note: This presentation contains only preliminary research results. If you have any questions, please contact Julie Vano at Thanks.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
CRFS Technical Meeting LC Operations Update November 14, 2012.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Developing recommendations for sustainable flows in the Great Lakes Basin of New York and Pennsylvania Sustainable Flows: The flow of water in a natural.
Idaho's Complex Water Issues in the Eastern Snake River Plain Aquifer: Underground Rivers, Increasing and Decreasing Groundwater and Spring Levels, Human.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Biological Opinions and ESA Consultations Ritchie Graves NMFS-NWR Hydropower Division Portland, Oregon February 19, 2013.
River Stage and Bottom Elevation
Sustainable Management in the Lower American River
Upper Snake Reservoir Operations October 13, 2015
Fall Chinook Management Measures
Presentation transcript:

Hydrologic Analysis for CAMP Environment, Fish and Wildlife Working Group Briefing for ESHMC May 6, 2008

SWC Opinion “…water going into the Snake River … would pass the reservoir system and go beyond Milner Dam, potentially benefitting others who are not parties to this proceeding, including Idaho Power, those concerned with the ESA, the Nez Perce settlement and any other flow augmentation interests, and the State of Oregon.” “Collateral consequences to other interests are for another forum.”

EFW Working Group Aberdeen Springfield CDR Associates IDEQ, IDWR, IFG Idaho Power Nature Conservancy Trout Unlimited USBR U.S. Fish and Wildlife Service

Goal “to identify and discuss possible impacts on fish and wildlife resources, positive and negative, from actions to be taken under the ESPA Comprehensive Aquifer Management Plan”

Concerns Species and habitats Reach flows Spring flows Water quality and temperature Other info for evaluating impacts

Meetings EFW Working Group met on March 17 and April 4 Presentation to CAMP on April 24 in Rexburg IDWR and IPCO modelers met on April 16, April 23, and May 2

Goals of Analysis Evaluate hydrologic impacts of CAMP measures on a seasonal basis Agree upon a single method of analysis

Method 3 computer programs –SRPM –ESPAM –Recharge Water Availability Iterative modeling SRPM for years 0 and 1  RWA program for year 1  superposition ESPAM to predict reach gains for years 1 through XX  SRPM for years 1 and 2

Assumptions Conversions –Require diversions of 3 acre-feet/acre –Soft conversions Phased in over 10 years Limited by canal capacity –Hard conversions Initiated in year 10 at full implementation Not limited by canal capacity Storage in Lake Walcott increased from 97 KAF to 147 KAF

Assumptions cont’d Exchange flow –Augmentation flows at Milner decreased for July, August, and September –High lift pump acreage below King Hill reduced by 1.2 acres for every soft conversion acre CREP –200 KAF phased in over 10 years

Assumptions cont’d Recharge –Uniformly distributed along Egin Great Western Aberdeen Springfield –Recharge sites Milner Gooding (2) NSCC (4) –10-year phase-in

Assumptions cont’d Priority 1.Hard Conversions 2.Soft Conversions 3.Recharge on NSCC 4.Recharge on Milner Gooding 5.Recharge on Aberdeen Springfield 6.Recharge on Egin 7.Recharge on Great Western

Scenarios Base Full CAMP Full Camp No CREP CREP only Other

To Do Develop database application to facilitate iterative modeling Verify/evaluate results Compare results for 1-month and 6-month stress periods

Thank You