Assegnato Sconti Accordato MSF TRK ECAL DT RPC Trig. MAG. Comp. TOT Residuo: +0.05 -0.15 -0.83 +0.01 -0.02 +0.01 +0.02 +0.80 -0.11 MSF TRK ECAL DT RPC.

Slides:



Advertisements
Similar presentations
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
Advertisements

J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Modifications  CMS-RPC-1 and CMS-RPC-3: updated dimensions (Ian Crotty, March 1 st )  ATLAS-sMDT: updated dimensions (Felix Muller, February 26 th )
12-Jan-2009 / S.KunoriCMS HCAL / JTerm31 CMS HCAL - Hadron Calorimeter - Shuichi Kunori U. of Maryland 12-Jan-2009.
The CMS Detector Paoti Chang National Taiwan University
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Charged Higgs – Uppsala 2006 C.H. Shepherd-Themistocleous- RAL 1 C. H. Shepherd-Themistocleous Rutherford Appleton Laboratory, UK Identification of tau.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Another Conceptional Design of Veto Daya Bay Phone Meeting Changgen Yang 2006/03/01.
September 2006Dirk Wiedner / Installation1 3-D Rackwizard How to keep track of cables to the detector.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
1 GLD Surface Assembly Y. Sugimoto KEK
EUROPE. September 08 to 11 September 12 to 14 September - 15.
The Run Control and Monitoring System of the CMS Experiment Presented by Andrea Petrucci INFN, Laboratori Nazionali di Legnaro, Italy On behalf of the.
LINA NECIB Higgs Search at CMS 8/17/ Lina Necib, Boston University Aknowledgement: this presentation uses as resources the H → ZZ → 2 l 2q group.
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
CHEP06, Mumbai-India, Feb 2006V. Daniel Elvira 1 The CMS Simulation Validation Suite V. Daniel Elvira (Fermilab) for the CMS Collaboration.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Il Trigger di Alto Livello di CMS N. Amapane – CERN Workshop su Monte Carlo, la Fisica e le simulazioni a LHC Frascati, 25 Ottobre 2006.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Overview of Production for CMS GE1/1
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
RPCs in CMS Supreet Pal Singh India-CMS Meeting, July 20-21, 2007
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
Incorporating Scientific Instruments into the Grid Francesco Lelli University of Lugano F. Lelli, Incorporating Scientific Instruments into.
Summary of Opening Session Emmanuel Tsesmelis / CERN CARE-HHH-APD Workshop Arcidosso 2 September 2005.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
The Compact Muon Solenoid. What does CMS do? The Compact Muon Solenoid is a general purpose particle detector installed at point 5 of the Large Hadron.
x x e x & ln x Inverse Trig Trig
SUSY08 Seoul 17 June 081 Daniel Teyssier RWTH Aachen University Searches for non-standard SUSY signatures in CMS on behalf of the CMS collaboration.
Jessica Leonard, U. Wisconsin, December 19, 2006 Preliminary Exam - 1 H->  Jessica Leonard University of Wisconsin - Madison Preliminary Examination.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
First CMS Results with LHC Beam
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
CERN Finance, Procurement and Knowledge Transfer Department / EDMS CERN-RRB CMS Resources Review Board 18 October 2011 Updates to Financial.
LHC - Open for Business Nobel Prize 1985 for decisive contributions.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
24/08/2009 LOMONOSOV09, MSU, Moscow 1 Study of jet transverse structure with CMS experiment at 10 TeV Natalia Ilina (ITEP, Moscow) for the CMS collaboration.
Korea-CMS representative: Young-Il SKKU 6 CMS member institutes + 2 non-member institutes are active: 15 professors, 19 researchers, 20 graduate.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
David Mcfarlane1 CMS Gas Systems (Nitrogen, Argon & CO2)
CMS Cathode Strip Chambers Performance with LHC Data Vladimir Palichik JINR, Dubna NEC’2013 Varna, September 10,
Status Report of The CMS Experiment Christos Leonidopoulos CERN-PH on behalf of the CMS Collaboration 102 nd LHCC Meeting, CERN 7 July 2010.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Your-own-afs-password CMS Centre CMS System Login: Password: N.B. you must.
News and Misc UPO Meeting Jan 16, 2012
The Modular Design of CMS
The LHCb Installation Story
ATLAS M&O General Comments
Pictures and comments from Vitali Smirnov August 2010
CMS Goal of the experiment
SLB Synchronization in H4 Beam (LIP - Lisbon)
ILC Detector Technology
Project Presentations August 5th, 2004
مورد 1 کودک 3 ماهه ای با تشخیص نقص در دیواره بین بطنی در بیمارستان پذیرش میشود. او در مراحل اولیه CHF است و پزشک تجویز دیگوکسین را برای او ضروری می داند.
RPC approved plots.
Presentation transcript:

Assegnato Sconti Accordato MSF TRK ECAL DT RPC Trig. MAG. Comp. TOT Residuo: MSF TRK ECAL DT RPC Trig. MAG. Comp.TOT Residuo:

Assegnato Sconti Accordato MSF TRK ECAL DT RPC Trig. MAG. Comp. TOT Residuo: MSF TRK ECAL DT RPC Trig. MAG. Comp.TOT Residuo:

Extra CORE for CMS ( CHF) (where x 1 + x 2 + x 3 + x 4 = 0.8 MCHF) September 22, Solenoid (0.5) Tracker (1) Muon detector (1.5) Ecal (0.2) Contingency Total x 1 x2x2 x3x3 x4x4