COGENERTION PLANTS IN INDIA Presented by Punyatma dwivedi (AFREPREN)

Slides:



Advertisements
Similar presentations
Main Condensate & Feed Systems
Advertisements

Welcome.
Arul Joe Mathias B.E., M.Engg., MBA Dr. Balasankari B.E., M.Engg., Ph.D Trends in Biomass Power Generation in Asia and Opportunities for Global Equipment.
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
3RD GLOBAL NETWORKING CONFRENCE ENERGY AND RECP CASE STUDY IN KAKIRA SUGAR IN UGANDA Presented By: Ludigo James Uganda Cleaner Production Centre
Energy Efficient Steam Systems
Combined Heat and Power Generation in Jamaica’s Sugar Cane Industry Niconor Reece Sugar Industry Research Institute Manchester, Jamaica.
NO. 68A, PORUR KUNDRATHUR HIGH ROAD, PORUR, CHENNAI – INDIA. TEL: , , , 18, 19, 20 FAX:
CONSERVATION OF ENERGY IN SUGAR INDUSTRIES
4/23/20151 CO-GENERATION - AN INDIAN MODEL VINAY KUMAR MANAGING DIRECTOR.
Good Steam Engineering means Proper sizing, insulation, routing and trapping High pressure distribution and reduction at the point of use Separating condensate.
Energy Efficient Steam Systems. Steam Systems Steam systems most widely used type of process heating Advantages of steam: –Heat carrying capacity of steam.
PRESENTATION OF INDUSTRIAL TRAINING ON
Resources used to Generate Electricity in Australia.
The Heat robbers ! 100% fuel energy 80% steam 3% distribution losses 77% Process consumption 57% 20% Unburnt Stack Blowdown (Condensate & Flash)
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Objectives: Understand importance of utility and maintenance system in industry/plant.
ENGINE ROOM LOG.  During the watch a log is kept of the various parameters of the main and auxiliary equipment. This may be a manual operation provided.
Hydraulics.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
“Energy Efficiency Guide for Industry in Asia”
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
POWER PLANT.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
POWER GENERATION TECHNOLOGIES
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
STUDY OF BOILER’S ACCESSORIES
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
1 AFREPREN/FWD & Sotik Tea Company Regional Training Course on Renewable Energy and Biomass Cogeneration Technologies.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.
COGENERATION PROJECT PERFOMANCE OF THE COGEN PLANT 1998
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
HYDRO POWER PLANT
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Generating Electricity
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
Generator protection Generator protection is very complex compared to protection for other elements of the power system. For example, when a turbo-alternator.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Heat Pumps In a heat engine, heat is converted to mechanical energy by taking advantage of the fact that heat flows from hot to cold. The heat is taken.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
THERMAL POWER PLANT. INTRODUCTION : THERMAL POWER PLANTS CONVERT THE HEAT ENERGY OF COAL INTO ELECTRICAL ENERGY. COAL IS BURNT IN A BOILER WHICH CONVERTS.
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
KOTA SUPER THERMAL POWER STATION ,KOTA
THERMAL POWER PLANT.
WELCOME Project Electric Power Plant. Electric Power Plant Electric Power Plant.This is the age of Technology. In this age there is no place where we.
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
BENEFITS OF COGENERATIONS Punyatma Dwivedi 11 th Jan 2009 Venue: Soutic Tea Company.
Report on the Western Cape outages for the period November 2005 to February 2006.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Prepared by : Nishant .A. Raval
TRAINING SEMINAR Submitted By :- Submitted To:- Training carried at:
Introduction And Thermal Power Plant
Seminar on Practical Training By: Er. Kapil Kantia Electrical Engineering BIO-MASS ENERGY DIVISION.
Integration.
A SUMMER TRAINING PRESENTATION ON BOILER
UMCP Learning Objectives
Case sample of a CT option
Managing Director (Bajaj Power Ventures Ltd)
Plug & Play CHP? Is Your Pocket About to be Picked?
Whitesand First Nation Case Study Preliminary Engineering Study 2012
Presentation transcript:

COGENERTION PLANTS IN INDIA Presented by Punyatma dwivedi (AFREPREN)

Potentials of Exportable Powers The potential from about 575 operating sugar mills spread over 9 major States has been identified at 3,500 MW of surplus power by using bagasse as a renewable source of energy. This would require use of extra high-pressure boiler configurations of 67 kg/cm2 or 87 kg/cm2 or 105 kg/cm2 (against the conventional 32 kg/cm2 or 42 kg/cm2 pressure boilers used in the sugar mills).

Key Findings of this Presentation Based on 3 Sugar Factory Case Studies Godavari Sugar Mills Ltd Dalmia Chini Mills Ltd KM Sugar Mills Ltd

Case Study 1 ( Godavari Sugar) Company Name & addressGodavari Sugar Mills Limited Project LocationKarnataka State Year of Commissioning2002 Installed Capacity24 MW Captive power consumption (during Season) 7.34 MW Captive power consumption (during off Season) 2.16 MW

Case Study 1 ( Godavari Sugars) No. of units exported from 2002 to ,115 MWh Types of biomass utilized Mill bagasse, procured bagasse, cane trash, wood chips,coffee husk, and imported coal Project StructureEPC Contract followed by O&M Contract executed by M/s Desein Pvt Ltd (6 Managers/12 Engineers/16 skilled technician/24 labors) Capital cost, (Cogeneration only) US$ 25.5 million

Case Study 2 ( Dalmia Chini Mills) Company Name & addressDalmia Chini Mills Limited Project LocationUttar Pradesh State Year of Commissioning2007 Installed Capacity27 MW Captive power consumption (during Season) 9.5 MW Captive power consumption (during off Season) 2.43 MW

Case Study 2 ( Dalmia Chini Mills) No. of units exported from 2007 to ,100 MWh Types of biomass utilized Mill bagasse, procured bagasse, wood chips Cogen plant staffingTotal 60 (15 engineering and 45 skilled l Technician Capital cost, (7500 TCD Sugar mill & Cogen) US $ 53.2 million

Case Study 3 ( KM Sugar Mills) Company Name & addressKM Sugar Mills Limited Project LocationUttar Pradesh State Year of Commissioning2008 Installed Capacity25 MW Captive power consumption (during Season) 5.9 MW Captive power consumption (during off Season) 0.8 MW

Case Study 3 ( KM Sugar Mills) No. of units exported from Jan ,841 MWh Types of biomass utilized Mill bagasse Plant configurationmulti-fuel fired boiler with 67 kg/cm2 pressure & 495°C temperature and matching extraction-cum-condensing Cogen plant staffingTotal 50 (10 engineering and 40 skilled Technician) Capital cost, (Cogen only & excludes controls & instrumentation costs) US $ 16 million (Bagasse handling system made inhouse; Boiler & Turboalternator bought from lowest cost supplier in India

KEY CHALLENGES EXPERIENCED IN THE 3 COGEN CASE STUDIES

100 TPH BOILER

BOILER Some fine tuning is required in the areas of excess air control and unburnt carbon loss The operation of the cinder recovery systems provided is not satisfactory and the system provided need improvements. Feed water quality control is an area needing attention and this should be CPU unit to ensure that there should not be any organic matter fouling. In conventional bagasse fired boilers, the bagasse is fed into the boiler directly from the mill. The quantity of bagasse fed into the boiler is controlled manually by opening or closing a gate in the return bagasse carrier. This system cannot have an automatic combustion control. In order to implement an effective combustion control, storage bunkers above the feeders, or a continuous circulation of a large quantum of bagasse, say, about 50% of more bagasse, through a merry-go-round system is required. An effective bunker system for the storage of bagasse, which will store bagasse for the requirement of about 10 to 15 minutes (but not more than that ) for the boiler MCR,

15 MW TG SET

The experience has shown that the turbine for the Sugar plant Cogeneration application should be rugged and preferably with slow speed. Problems in maintaining the steam purity in the boilers affect the turbine with deposits on the blades. The major contaminant is silica that gets carried over as vapor as the operating pressure of the boiler increases. There had been some problems of vibration and failure of bearings. These were due to initial problems in the lube oil system, misalignment of turbine & TA as well as misalignment of piping and these could be resolved by having proper pre commissioning checks. There had been some problem of exhaust hood spray falling on the blades and causing vibration. This was mainly due to a misdirected spray nozzle in the exhaust hood. TURBOALTERNATOR

There are a number of suppliers who can supply the machines, but other than One or Two, there is none that has set up an adequately staffed service network and stocks adequate spares. This could pose major problems, specifically after the warranty periods. Most of the suppliers, import the turbine steam path components, generators, automatic voltage regulators (AVRs) and a few auxiliary equipment, and in such cases spares and servicing could pose serious problems. TURBOALTERNATOR

Water Treatment

This is one area that needs more attention. Extraction steam at low pressures is supplied to the sugar plant for processing. About 90% of the steam supplied to the sugar processing is returned as condensate to the steam generator feed water system, at a temperature of around 95 Deg.C. Generally there could be no contamination of this condensate. Sincere and disciplined efforts should be made to keep this condensate free from contamination. We are not recommending the usage of the vapour condensate for the feed water application as the quality of this condensate varies. Generally the pH is low, the TDS and silica are high and there could be traces of ammonia and organic compounds. We could use this with a lot of monitoring, but the repercussions could be serious if the monitoring system malfunctions or fails.

Water Treatment In Godavari Sugars, they take return condensate through a CONDENSATE POLISHING UNIT where in Dalmia Chini Mills Limited Jawaharpur they provided online conductivity meter with auto isolation & auto drain valve if conductivity of return condensate goes beyond 10 all return condensate goes to drain. This aspect of water management needs some more study and a lot more of discipline.

Bagasse Handling

During the cane crushing season, the cogeneration plant receives the bagasse directly from the mill, and the surplus bagasse is taken to the bagasse storage yard. The bagasse thus saved could be used for the off-season operation of the Cogeneration plant, or could be used to run the Cogeneration plant on the cleaning days or when the mill is not running due to some other reasons. Under such occasions back feeding of the bagasse from the yard to the boiler is required. As the unit size becomes larger the quantum of bagasse to be backfed is so high. The feeding becomes non uniform, resulting in the overloading of the conveyors if the feeding is done improperly with bulldozers or pushers. To overcome the back feeding difficulties stacker re claimers have been designed, Here we recommend to minimise the use of slat chain conveyor in order to reduce maintenance cost & auxiliary power consumption & break down time.

ELECTRICAL SYSTEMS

Electrical Systems As far as the technology for the design of the electrical systems for the Cogeneration plant, right from generation to switch yard and connection to the main grid, enough experience is available. The only problem faced by the Cogeneration plants is the stability of the grid. There are unfounded fears in the minds of the plant operators with regard to the ability of the cogeneration plant to cope up with the tripping of the grid. If the protections are properly chosen and the equipment are properly specified, there is no reason why a cogeneration plant should trip with the grid and not go into island operation. To the extent possible efforts should be made to parallel the cogeneration plant at 110 kV level.

CONTROL SYSTEMS

Control Systems Being the most important subject from the point of view of operation and maintenance of the cogeneration plant, this subject deserves a lot of attention. We recommend Distributed Control System (DCS). The technology for the planning and designing the complete controls & Instrumentation system for the cogeneration plants is available, but what is required is to create an awareness among sugar plant people about the importance of instrumentation in the operation and maintenance of the cogeneration plant

Skilled Man Power Cogen is a high cost venture, investing in skilled and trained manpower is important. With 1 year training staff with experience in operating at 44 kg/cm2 systems can maintain and manage 64+ kg/cm2 boiler system. More and longer term training is required for manpower working with lower pressure systems

In Summary, Key Concern Areas Facing New Cogen Projects Are: Boiler Turboalternator Water treatment Bagasse handling Electrical systems Control systems Skilled manpower

Thank You AFREPREN/FWD Sotik Tea Company