7 September 2006VELOEddy Jans 0 VELO-installation September 7, 2006 installation of exit window + part I of the beam pipe logging of vacuum data what’s.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Vrije Universiteit amsterdam CERN, November 27, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand Subatomic.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
VELO RF box status at Nikhef Report at the Meeting for new VELO RF foil development Tjeerd Ketel, Erno Roeland a.o., Nikhef Tjeerd Ketel, Nikhef.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, XFEL Bunch Compressor.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules installation.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Toll-free for How to Fix McAfee Antivirus Error Code 1603, and 7305?
Vacuum System P. Chiggiato TE-VSC
The LHCb Installation Story
VELO-installation meeting CERN, January 17, 2006
Long Shutdown for the LHC: Vacuum Beam Pipes
How to fix Avast Antivirus Error 42127?. Do the following methods in order to troubleshoot the Avast antivirus “42127”: Repair registry entries associated.
LHCb & EYETS
UK RFD Pre-Series cryomodule
Why We Arrived With Windows Upgrade Support ?
How To Fix QuickBooks Pro Export to Excel Not Working Issue?
KEK injector cryomodule
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Cryomodule Assembly Plan

Қош келдіңіздер!.
Practice Geometry Practice
Polarized 3He target installation
Presentation transcript:

7 September 2006VELOEddy Jans 0 VELO-installation September 7, 2006 installation of exit window + part I of the beam pipe logging of vacuum data what’s next

7 September 2006VELOEddy Jans 1 August 14: opening of RICH1-side of VELO-tank to install exit window with w.f.s. + beam pipe part I

7 September 2006VELOEddy Jans 2 Installation of new/longer w.f.s.

7 September 2006VELOEddy Jans 3 Installation of exit window + beam pipe

7 September 2006VELOEddy Jans 4 What’s next ?? Perform vacuum tests (venting with Ar, mass spectra, etc.) (≈ end of September) Get PVSS implementation running Measuring ((x,y,z) + leaktest) and manipulating of NIKHEF Apply NEG-coating on rf-boxes Organize clean + adequate working place for rf-box mounting Uninstall bellows Perform various repairs (see next slide) Combine bellows + rf-boxes Measure geometry Install bellows + rf-boxes Perform extensive vacuum tests Check positioning

7 September 2006VELOEddy Jans 5 baratrons Repair list + 1 motion axis to be replaced