Part 2: Ecological and Environmental Considerations for Cost Estimating Development Projects.

Slides:



Advertisements
Similar presentations
ODOT's Environmental Site Assessment Process
Advertisements

Connecticut Brownfield Sites
Phase I Environmental Site Assessment
By Chris Ford and James Hughes ( ) ( )
Cleanup of Contaminated Areas Aaron D. Green, Project Manager Remediation Branch IDEM’s Office of Land Quality.
John Lynch, P.E. Palisade Software Miami Users Conference October 25,
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Denver Federal Center Calibration Silo Removal Project What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
CE 510 Hazardous Waste Engineering
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Partnerships and Processes Landfill Redevelopment.
PCB - What You Need to Know Presented by:  Darren Lee  Environmental Control Corp., Project Mgr.,  Industrial Hygienist  Previous West Linn- Wilsonville.
Brownfields are “real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous.
Green Remediation An Overview of the State of the Practice
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Hydrogen Workshop for Fleet Operators. Module 8, “Hydrogen Lifecycle Costs, Training & Useful Information”
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Ms. Mandel  I can explain what a Brownfield site is.  I can explain how a Brownfield site is restored to a usable piece of property.
Brownfields Health Risks & Remediation Diogo Cadima Topic ‘A’ Term Project CET 413.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Today’s Lecture Announcements Phase I Environmental Site Assessment
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
September 18, 1998 State of Illinois Rules and Regulations Tiered Approach to Corrective Action (TACO) Presented by The Great Plains/Rocky Mountain Technical.
IDEAL DEMO A Brief Overview PRESENTER: BILL HOMBACH JUNE
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
Hazardous Waste Any waste that is a risk to the health of humans or other living things.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
Laboratory Decommissioning : Essential Tools and Lessons Learned Jim Carscadden Division of Environmental Protection Office of Research Facilities.
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Units Conversion  There are 1,000 milligrams (mg) in 1 gram (g)  milli = 1 *10-3  milligrams per liter (mg/l) are equal to parts per million (ppm) 
RCRA Permit Closure Cost Estimates
Proposed Plan for No Further Action
Minnesota CLE June Webcast Extravaganza Environmental Law Basics for the Business and Real Estate Practitioner Joseph G. Maternowski, Hessian & McKasy,
1st Avenue Revitalization Project Brownfield Pilot Study Public Outreach Property Owner Stakeholder Meeting June 1999.
Redevelopment Authority of the County of Washington O
Sustainable Redevelopment
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Green Generation: Division B and C
Environmental Considerations prior to purchasing Properties
Presentation transcript:

Part 2: Ecological and Environmental Considerations for Cost Estimating Development Projects

Environmental Considerations in Property Development Contamination – What Is It? Identification of Contamination –How and When is this Done? So I have a problem – What Now? –Nature and Extent of Contamination How much will it cost to fix it?

Contamination 101 A contaminant is a substance that negatively affects human health or the environment Contaminants are regulated by the Environmental Protection Agency (EPA) or Florida Department of Environmental Protection (FDEP) Cleanup levels are assigned to each contaminant based on their risk to receptors (e.g., humans, aquatic and terrestrial species) Cleanup levels are often in the part per million (ppm) or part per billion (ppb) range One ppm equals…. –One drop of gasoline in an auto gas tank –One minute in 2 years –One cent in $10,000 –One inch in 16 miles

How Clean Is Clean? One part per billion equals… –one 4-inch hamburger in a chain of hamburgers circling the earth at the equator 2.5 times –one silver dollar in a roll of silver dollars stretching from Detroit, Michigan to Salt Lake City, Utah –one kernel of corn in a 45-foot high, 16-foot diameter silo –one sheet in a roll of toilet paper stretching from New York to London –one second of time in 32 years Some contaminants (e.g. benzene) have to be cleaned up to one ppb It’s not easy, and it’s not cheap

When and How Is Contamination Identified? Best Case Scenario: Prior to Property Acquisition Phase I Environmental Assessment per ASTM E –Chain of Title (prior ownership) –Records Review (prior use) –Interviews with Knowledgeable Person(s) –Site Inspection –Does not involve sampling – Phase II Environmental Assessment –Qualitative study (yes/no) –Soil, sediment, groundwater sampling –Samples taken in areas of potential impact

Red Flag Sites Former shooting/bombing ranges Gas stations/fuel terminals Dry cleaners Manufacturing plants: –Heavy machinery –Electronics manufacturing –Nuclear missile manufacturing Military bases Airports Future Orlando Performing Arts Center Disposal sites –Power Equipment –Drum Disposal Areas

More $ampling Remedial Investigation – define nature and extent –Can range in cost from the thousands to millions of dollars –Always better is someone else is paying for it

Once Contamination is Defined Remedial Alternatives Analysis and Design –Engineers design cleanup methods taking into account cost, schedule, ease of implementation, effectiveness Soil – excavate, vapor extraction, bioremediation Groundwater – air sparge, bioremediation, pump & treat,

Once a Remedy is Selected Remedial Action Implementation Operation and Maintenance (O&M)

Some War Stories – Property Development A Phase I ESA (by others) gone bad –“redneck recycling” Performed assessment and source removal of approximately 16,000 tons of soils impacted with Dioxin, PCBs, Lead, and Arsenic Activities included excavation, onsite soil treatment, loadout, and transportation & disposal $1.8M Project

Restoration of a 2,000-acre site - Orlando Pershing Landfill 1 Launch Test Area

Another Phase I ESA gone bad Remediation of Former Trap and Skeet Range

Estimating the Cost of Environmental Liabilities High-level (programmatic phase) – RACER Overview –Nature and extent must be defined –Highly contingent upon defined nature and extent of contamination –Great for budgeting – not for bidding Detailed Cost Estimating – supported by hard bid –Excel –Timberline –Appropriate for hard bid projects Both methodologies can be used –Vet cleanup technologies with RACER, prepare hard bid of selected remedy

What is RACER? Remedial Action Cost Engineering and Requirements (RACER): a parametric and integrated cost estimating software developed specifically for environmental investigation and cleanup projects. A commercial, off-the-shelf, Windows-based system that is adaptable and scalable to any size project or portfolio. A validated and accredited system, RACER provides credible, auditable, and defensible budget-level estimates.

What Media Does RACER Address? RACER addresses all media of concern: –Soil –Sediment –Groundwater –Surface Water –Sludge –Building Materials –Ambient/Indoor Air –Free Product

What Regulatory Programs Does RACER Cover? CERCLA/Superfund RCRA Corrective Action State Groundwater Protection Programs State Voluntary Cleanup Programs Underground Storage Tank Programs Radioactive/Nuclear Facility D&D Abandoned Mine Lands Programs Military Munitions/Unexploded Ordnance Programs Non-U.S. Cleanup Programs

What Lifecycle Stages Does RACER Address? RACER estimates costs for all lifecycle stages of contaminated site management. –Pre-study –Study –Removal/Interim Actions –Design –Construction/Implementation –Operation & Maintenance –Long-term Monitoring –Site Closeout

What Makes RACER Unique? RACER uses a ‘parametric’ estimating methodology –Input Parameters + Logic = Required Items –Input Parameters + Algorithms = Quantities

Who Uses RACER? AECOM Corporations Engineering/Consulting Firms State Environmental Regulators Law Firms Insurance Underwriters Government Agencies

How Does RACER Organize Estimates? RACER has a 4-level hierarchy to organize estimates –Estimator sets up folder, project, site, and phase levels in RACER hierarchy. Hierarchy provides flexibility to organize estimates as needed

Are RACER Estimates Location Specific? RACER adjusts national-average prices for materials, labor, equipment, and subcontracted services based on the project site’s state/country and city. Location modifiers based on the project site’s state/country and city

How Does RACER Estimate Costs? RACER uses high-level parameters about the site, scope of work, and execution methods to estimate costs. Estimator enters parameters for each “cost model”

How Does RACER Estimate Costs? RACER provides flexibility to adjust parameters to suit the needs of the project and/or client. Default values can be changed as needed.

How Does RACER Estimate Costs? RACER identifies items required to conduct the work.

How Does RACER Estimate Costs? RACER uses algorithms to calculate quantities.

How Does RACER Estimate Costs? RACER looks up prices and adjusts for location and safety productivity.

How Does RACER Estimate Costs? RACER calculates total cost for each item.

How Does RACER Estimate Costs? RACER calculates total cost for the technology.

What Documentation Does RACER Provide? RACER provides comprehensive documentation for project deliverables and audit trail. –RACER includes reports designed specifically to provide a defensible record of all input parameters, assumptions, and notes used in building the estimate.

Does RACER Support Cash Flow Analysis? RACER provides cost-over-time reports that can be used for cash flow modeling of environmental liabilities.

How Often is RACER Updated? RACER is updated annually with new prices, location modifiers, escalation factors, templates, cost models, and other engineering enhancements. Estimates from prior versions can be easily upgraded to use the latest pricing data from RS Means.

One Thought to Remember Caveat Emptor…Let the buyer beware –A Phase I environmental assessment costs about $5,000 –Cleaning up a property where you have assumed the liability can cost hundreds of millions… –To exit slideshow and return to Web site, click “Back” arrow.