© 2013 IBM Corporation Discover how to simulate and forecast the impact of changes on your workload environment How can you better satisfy Service Level.

Slides:



Advertisements
Similar presentations
Project Management with VIVA PPM Tool (Project Portfolio Management)
Advertisements

CP Chapter 4 Schedule Planning.
Maintaining Tivoli Workload Scheduler Agents with IBM Endpoint Manager Mark Delaney
ONYX RIP Version Technical Training General. Overview General Messaging and What’s New in X10 High Level Print and Cut & Profiling Overviews In Depth.
Week 6: Chapter 6 Agenda Automation of SQL Server tasks using: SQL Server Agent Scheduling Scripting Technologies.
Departmental drop-in session. The Staff project has three main aims: 1.Provide a standard image for all Windows Machines 2.Consolidate user.
Software Process Models
3/5/2009Computer systems1 Introduction Project management fundamentals: Initiating projects Determining project feasibility scheduling projects planning.
© 2013 IBM Corporation October 4, 2013 IT Analytics and Big Data IBM Solutions Paul Smith (Smitty) Service Management Architect.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
The Web Interface for TWS
 1  Outline  Model  problem statement  detailed ARENA model  model technique  Output Analysis.
Full Monte Cost and Schedule Risk Analysis
ENVELOC GENERAL CONFIGURATION DEMO Contact Information Billing Information Backup Time Days to Backup Backup Selections Files to Exclude Wireback (Archive)
Managing Data Resources. File Organization Terms and Concepts Bit: Smallest unit of data; binary digit (0,1) Byte: Group of bits that represents a single.
HORIZONT 1 TWS/WebAdmin Tips & Tricks HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89 /
 Network Management  Network Administrators Jobs  Reasons for using Network Management Systems  Analysing Network Data  Points that must be taken.
1 Effectively Managing Global Engineering Licenses Kimberley A. Dillman IT Solution Architect – Engineering Delphi Corporation
© 2012 IBM Corporation Tivoli Workload Automation Informatica Power Center.
TWSd – New Best Practices
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Accelerating Product and Service Innovation © 2013 IBM Corporation IBM Integrated Solution for System z Development (ISDz) Henk van der Wijk 23 Januari.
Business Process Performance Prediction on a Tracked Simulation Model Andrei Solomon, Marin Litoiu– York University.
Using Group Policy to Manage User Environments. Overview Introduction to Managing User Environments Introduction to Administrative Templates Assigning.
Relex Reliability Software “the intuitive solution
© 2014 Equity Administration Solutions, Inc. All rights reserved. 1 Four Fundamentals of Financial Reporting for Equity Compensation Kathy Biddle, CEP.
Click to add text TWA Cloud Integration with Tivoli Service Automation Manager TWS Education.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
DSS Modeling Current trends – Multidimensional analysis (modeling) A modeling method that involves data analysis in several dimensions – Influence diagram.
CSI-E Computer Security Investigator – Enterprise.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Vegas Baby A trip to Vegas is just a sample of a random variable (i.e. 100 card games, 100 slot plays or 100 video poker games) Which is more likely? Win.
Inventory Guru Introduction
©2002 Allen Systems Group, Inc. All Rights Reserved. by Scott Webb, ASG Senior Sales Engineer by Scott Webb, ASG Senior Sales Engineer ASG-sys*ADMIRAL.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
T Project Review Sotanorsu I3 Iteration
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Managing Data Resources. File Organization Terms and Concepts Bit: Smallest unit of data; binary digit (0,1) Byte: Group of bits that represents a single.
Project Management.
Project Management Inspections and Reviews 1 February.
Simulation Chapter 16 of Quantitative Methods for Business, by Anderson, Sweeney and Williams Read sections 16.1, 16.2, 16.3, 16.4, and Appendix 16.1.
Tivoli © 2010 IBM Corporation CCMDB New Features for CCMDB August 2010.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
© Copyright 2014 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Administrator Training – Release Alarms Administration.
Copyright , Dennis J. Frailey CSE7315 – Software Project Management CSE7315 M15 - Version 9.01 SMU CSE 7315 Planning and Managing a Software Project.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Unit 4 Simulation software. Introduction Software used to develop simulation models can be divided into 3 categories: – General-purpose programming languages:
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
IWS/Graph – Product Presentation
OpenPBS – Distributed Workload Management System
HORIZONT TWS/WebAdmin DS TWS/WebAdmin DS Tips & Tricks
IBM Workload Scheduler
IBM Presentation Template Full Version
Take control over mission critical processes
Import Cron and Windows Task Scheduler definitions
Lec3: Network Management
Project Management for Software Engineers (Summer 2017)
Use Cases & User Mocks Customer Call –
Event Chain Methodology
Quantitative Project Risk Analysis
In this tutorial you will:
CAD DESK PRIMAVERA PRESENTATION.
New Technologies for Storage and Display of Meteorological Data
MECH 3550 : Simulation & Visualization
Agile Project Management and Quantitative Risk Analysis
and Forecasting Resources
Presentation transcript:

© 2013 IBM Corporation Discover how to simulate and forecast the impact of changes on your workload environment How can you better satisfy Service Level Agreements and predict the end of your workload with more confidence? >>Forecast Job duration using SPSS-powered statistics What happens to your business if an unexpected event affects your workload? >>See how changes affect the plan and explore all the various results using What-if Analysis >>Adjust definitions for plan optimization using Variable Duration and Deadline (IBM Workload Scheduler for zOS) Keep a clean pre-production plan >>Until days option IBM Workload Scheduler Demo Day

© 2013 IBM Corporation Advanced job duration prediction

© 2013 IBM Corporation The Challenge Critical jobs have deadlines that have to be met. If a deadline is at risk it is important to know this in advance to take recovery actions. Business users are asking when a specific processing will complete A combination of an accurate job duration estimation algorithm and the critical path is the solution.

© 2013 IBM Corporation An accurate job duration prediction is fundamental to estimated the end time of a critical job. Job duration in seconds will reduce the error in case of many jobs with a short duration. The foundations of this solutions are: Improve the measurement of start time and end time of a job Improve the prediction algorithm The Solution

© 2013 IBM Corporation Dates and JOB duration in seconds

© 2013 IBM Corporation Start time and End time are now showing the seconds. Job duration is calculated in seconds. Minimun duration is calculated in seconds. Job duration statistics are using seconds Dates with seconds

© 2013 IBM Corporation Built in JOB duration prediction algorithms

© 2013 IBM Corporation Detailed statistics are reported for common periods Global statistics for all the job instances Weekly statistics Monthly statistics Monthly (from the end of the month) statistics Run cycle statistics An algorithm identifies the period (if present). A linear prediction algorithm is used to analyze the samples of the period. A confidence interval is showing the variance of the samples for the identified period This is the default prediction algorithm for all the jobs. Built in job duration prediction algorithms

© 2013 IBM Corporation SPSS for advanced job duration predictions

© 2013 IBM Corporation IBM SPSS Statistics is a well known software package used for statistical analysis. It is using the whole job history to identify patterns and make the right prediction. It is not using a pre-defined list of possible periods. It Is using sophisticated algorithms. This processing is being used for a subset of jobs identified by the user. A confidence interval is provided SPSS for advanced job duration predictions

© 2013 IBM Corporation

What if IBM Workload Scheduler What If Analisys on critical jobs using a Gantt view WHAT is involved IF a server is broken and needs 3 hours to repair? WHAT happens to my plan IF my SAP server stops for maintenance? WHAT will I risk IF the file I'm waiting for is late?

© 2013 IBM Corporation

Variable Duration and Deadline The accuracy of job durations and deadlines is very important to leverage some TWSz functionalities, such as workload planning calculations or the alerting and handling of the Critical Jobs. Many customers have jobs whose durations and deadlines change on certain dates. The new variable duration and variable deadline feature allows customers to specify different durations and deadlines for the same job, by associating them with internal or external run cycles.

© 2013 IBM Corporation

Automatic cleanup of abended instances

© 2013 IBM Corporation The Challenge Pre-Production Plan (LTP) is stored on DB and automatically cleaned up Cleanup process does not remove instances after the First Not Completed Job Stream instances Large Pre-Production Plans can have bad performance impacts Job Streams left in ABEND are causing Symphony and Pre-Production plan growth and then performance degradation Current Solution: manually cleanup ABENDed job streams

© 2013 IBM Corporation The Solution: Until days With next TWSd version we are adding a new option untilDays (ud) in optman This option sets a default until to every job stream instance, n days after its scheduled time An ABENDed job stream instance is then removed from the plan after n days The user can override this setting, using a specific until on the job stream definition Setting untilDays=0, no default until is applied Using this option, Administrator don't need to worry about cleanup of job stream instances

© 2013 IBM Corporation