Www.energy.gov/EM 1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.

Slides:



Advertisements
Similar presentations
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Advertisements

Objectives Terminal Objective
1 What is Remediation Process Optimization? How Can It Help Me Identify Opportunities for Enhanced and More Efficient Site Remediation? Mark A. Gilbertson.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF DOE POLICY -- USE OF INSTITUTIONAL CONTROLS COLLEEN OSTROWSKI (202)
Green Remediation An Overview of the State of the Practice
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Gerald Whitney Operating Experience Program Coordinator Presented May 5, 2010 DOE OEC Workshop - SLAC National Accelerator Laboratory "Lessons from the.
Making a Difference American Recovery and Reinvestment Act Thursday, February 25, 2010 Thomas Johnson, Jr. Deputy Director, EM Recovery Act Office of Environmental.
Hanford Site: Long-term Stewardship Boyd Hathaway Realty Officer Department of Energy – Richland Operations Office Hanford Long-Term Stewardship (LTS)
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
Status of the U.S. Nuclear Regulatory Commission’s Initiatives on the Use of Cesium-137 Chloride Sources March 10, 2009 Regulatory Information Conference.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Update on progress with development of DS459
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Environmental Protection in the United States Christopher Green U.S. Embassy July 13, 2006.
1 Roger Butler Deputy Assistant Secretary for Policy, Planning, and Budget August 25 & 27, 2003 Office of Environmental Management FY2004 Budget Office.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Acquisition and Contract Management Update Jay Rhoderick Associate Deputy Assistant Secretary for Tank Waste and Nuclear Material AtomEco-2012.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Update on Procurement Opportunities and Acquisition Process
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Funding Long-Term Stewardship James D. Werner, Director of Long-Term Stewardship Office of Environmental Management U.S. Department of Energy Resources.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science The Office of Science Role in Environmental Cleanup Dr. James.
56th Regular Session of the IAEA General Conference
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Regulatory Framework for Uranium Production Facilities in the U.S.
Federal Aviation Administration NextGen Environmental Management System (EMS)
EM's Challenge1 Introduction EM’s Challenge: Integrating Major Regulatory Requirements.
1 What’s New in Environmental Management? Karen Shears, Director Procurement and Contracts Division Oak Ridge Office of Environmental.
DOE ASSET MANAGEMENT PLAN
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
New and Exciting Opportunities for Federal Property Transfers Michael P. Comodeca Spencer Fane Britt & Browne LLP
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
United States Nuclear Regulatory Commission NRC’s Risk-Informed and Performance- Based Approach to Decommissioning DOE Workshop on Risk-Based End States.
Low-Level Radioactive Waste (LLW) Disposition at the
Oak Ridge Office of Environmental Management Update
NDA Draft Strategy.
Robert Geller Missouri Department of Natural Resources
National Radioactive Waste Management Agency Bill
Presentation transcript:

1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013 Alice Williams Associate Principal Deputy Assistant Secretary For Environmental Management

2 2 Time is not on our side – costs and risks increase over time. We have a responsibility to relieve future generations of this environmental and financial liability. We have delivered significant cleanup results in the past several years, while completing projects on time and within cost Environmental Management: A National Responsibility

3 Environmental Management Priorities Activities to maintain a safe and secure posture in the EM complex Radioactive tank waste stabilization, treatment, and disposal Spent nuclear fuel storage, receipt, and disposition Special nuclear material consolidation, processing, and disposition High risk soil and groundwater remediation Transuranic and mixed/low-level waste disposition Soil and groundwater remediation Excess facilities deactivation and decommissioning

4 Completed cleanup on 90 of 107 former nuclear weapons and research sites EM Has Significantly Reduced Risks to the Environment and Public

5 The Life-Cycle Cost of the EM Program: Approximately $200 Billion in Costs to Go The EM legacy cleanup program is forecasted to continue past 2060 with “to go” costs of up to $209 billion. Tank waste activities are the most costly of EM’s cleanup activities. Facility D&D, soil and groundwater activities represent the second most costly cleanup activity.

6 Compliance, Risk, and Priority Setting Environmental Compliance: One of EM’s top program drivers Different environmental statutes drive different removal end points Location of points of compliance (risk envelope) Risk prioritization: Existing processes provide the framework Sequence and schedule – Federal Facility Agreements and Consent Orders Remedy Selection – CERCLA Nine Criteria and Waste Determinations/Disposal Authorization Statements Decisions regarding cleanup priorities need to be risk-informed to provide a balanced approach Protection of human health and the environment Consideration of future use and sustainability – environmental, social, and economic

7 Risk-informed Decision Making Savannah River Tank 5 Heel Removal (Tank Interior) Manage environmental contamination and waste in a manner that balances protection of human health and the environment and cost effectiveness for current and future generations Will be necessary to leave residual waste in place Allows for natural attenuation Integrates stewardship into holistic, life-cycle management options Requires further development of predictive modeling and visualization, and monitoring and sensor technologies Recognizes U.S. Government’s long term commitment to monitoring and other institutional controls Natural attenuation of uranium contamination at the 300 area, Hanford site

8 Discovering Sustainable Solutions U.S. Executive Order requires federal agencies to establish an integrated strategy towards sustainability and to make reduction of greenhouse gas emissions a priority for federal agencies. EM’s approach to meeting Executive Order goals is Accelerated D&D of high energy consuming excess facilities (e.g., Portsmouth, West Valley and ETTP) Ensure EM sites have robust energy management programs Promote In Situ Decommissioning and green remediation, where appropriate Several EM sites have successfully implemented energy reduction efforts. CERCLA Nine Criteria do not directly include sustainability.

9 How do we take a more comprehensive and integrated approach to balancing impacts of addressing environmental contamination risk? Short-term and long term impacts? Worker and community impacts? Local and global impacts? Cost and risk mitigation? End states and future use? How do we (or should we) change the basic question of “How clean is clean?” to “How much residual waste can remain and still ensure protectiveness?”? How do we expand our thinking about risk and sustainability to best manage existing risks and execute our mission? Challenge

10 Considerations Going Forward Holistic approaches for remediation of sites with multiple contaminant sources and multiple post-closure uses, including technically based in-situ, point-of-compliance, and point-of-use monitoring locations. Effective post-closure controls: monitoring, institutional and engineering and natural controls. Approaches for assessing long-term remedy performance to reduce uncertainty and need for controls. Incorporate upfront consideration of sustainability options and analyses that cover the three sustainability pillars (social, environmental, and economic), as well as trade-off considerations into decision making.