Tulsa Fuel & Manufacturing Superfund Site Proposed Plan for Site Cleanup.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Business Law Objective 7.02 State and Local Energy and Environmental Regulation Agencies and Laws.
By Chris Ford and James Hughes ( ) ( )
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 BoRit Asbestos & The Superfund Process Stacie Peterson, Remedial Project Manager (RPM)
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
BoRit Superfund Site Timeline
John Lynch, P.E. Palisade Software Miami Users Conference October 25,
INTRODUCTION TO THE USE OF CERCLA FOR ENVIRONMENTAL CLEANUP PROJECTS USDA FOREST SERVICE Grants and Agreements Workshop February 28, 2002 Great Falls,
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Radium contamination in Denver, Colorado Colin Hall.
+ Water Quality & Human Health: From Arsenic Exposure to Biological Response Understanding how contaminants move through the environment UNC Superfund.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Environmental Assessment Public Meeting
B ROWN W OOD P RESERVING S UPERFUND S ITE Live Oak, Florida U.S. Environmental Protection Agency Lisa Moore Daniel Stern.
City of South Milwaukee Shoreline Park Public Information Meeting #2 November 11, 2014.
BUILDING STRONG ® 1 Solid Waste Management Unit (SWMU) 16 Old Southside Landfill Joint Base Charleston Weapons Corrective Measures Implementation Michael.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
I Like This !!!!!!!!!!!!. Kennecott Copper Mine (North Zone) April 20, 2004 By: Ben Chadwick, Shweta Mehta, Purvi Patel.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Region 10 EIC Meeting NYSDOT GreenLITES Project Design Certification Program Richard Gass with much Assistance and Thanks to Paul Krekeler GreenLITES Program.
SITE OBSERVATIONS SUMMARY (January through December 2010) McCormick and Baxter Superfund Site Portland, Oregon.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Lead Contamination in the Belledune Area: Past and Present Prepared by Inka Milewski Conservation Council of New Brunswick October 2003.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Agency for Toxic Substances and Disease Registry Division of Health Assessment and Consultation Meeting Agenda Monday, September 27, :30 pmMeet and.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
By Leor & Gabriel Davoodpour Definition: Removing a mineral deposit from the Earth after removing the layer of earth above it. Techniques: Area Mining.
Today’s Topics Hartford Iron site assessment Cleanup to date Cleanup steps to come What can you do.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Superfund Process National Priorities List (NPL) Procedures.
Gowanda Area Redevelopment - Peter Cooper P roject Prepared by M. Hutchinson Peter Cooper Factory 1970.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
1 ICs at the WDI Superfund Site Brownfields 2004 St. Louis, MO Sarah Mueller U.S. Environmental Protection Agency Office of Regional Counsel Region 9,
November 14, Still Afraid of CERCLA? Tools and Techniques for Managing Environmental Liability Concerns Susan Bromm, Director Office of Site Remediation.
Sustainability Week BUS& 201 Business Law Shana Chung December 3, 2014.
Proposed Plan for No Further Action
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Noticing Package NOTICING PACKAGE Melike Altun, EM.
Uranium in Colorado: Past, Present, and Potential Future
THE SUPERFUND PROCESS Assessment and Listing
Abandoned uranium mine
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
SE 12th Street Roadway Improvements February 8, 2005.
UNC Superfund Research Program
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
Student Center A South: Inaccessible Element
Presentation transcript:

Tulsa Fuel & Manufacturing Superfund Site Proposed Plan for Site Cleanup

Site Location Located 1.3 miles south of downtown Collinsville 60 acres Bounded by: –Garnett/RR to east –Strip mine pit to south –Acreage to west –Faith Assembly Church to north

Site History : Active Zinc Smelter and Lead Roaster 1999: Listed on the National Priority List (NPL) 2008: Record of Decision (ROD) issued February 2, 2015: Proposed Plan announced

Areas that Require Cleanup Pink - areas that require cleanup Green - areas that do not require cleanup COCs include arsenic, cadmium, and lead

Proposed Plan for Cleanup Consolidation and capping of soil, sediment, and waste materials on-site Remedy will not include: 1.Five-foot vertical separation between waste and groundwater 2.Stabilization of waste Proposed Plan remedy offers equivalent protection

Cleanup Goals Site-Specific PRGs by Medium COCSite-Specific PRG Soil, Residential (mg/kg) or (ppm) Arsenic37 Cadmium75 Lead500 Soil, Nonresidential (mg/kg) or (ppm) Arsenic200 Cadmium560 Lead1,000 Surface Water (μg/L) or (ppb) Cadmium238 Sediment (mg/kg) or (ppm) Arsenic 181 Cadmium813 Lead500 Protect human health and the environment Impacts above cleanup goals and visual smelter waste will be addressed

Site Design

Site Design Stormwater Management

Tentative Schedule Procurement of a Contractor – 30 to 60 days Pre-Construction Tasks – 45 days From Mobilization to Substantial Completion of On-site Activities – 10 months

Activities during that 10 month period Site Mobilization Clear and Grub Soil and Sediment Erosion Control Decontamination Area Dewatering the Ponds Waste, Soil, and Sediment Consolidation Confirmation Sampling Remove Existing Wells/Install O&M Wells Site Grading and Seeding Demobilization

Protective Elements Health & Safety Plan Transportation Plan Decontamination Plan Dust Suppression Plan Site Management Plan Stormwater Management Plan

Site at Completion

Perimeter Sign

Operation and Maintenance

Locations to review site documents: Collinsville Public Library Oklahoma Department of Environmental Quality Central Records Division aFuels.htmhttp:// aFuels.htm United States Environmental Protection Agency

Your input on the Proposed Plan is important to us Ways to Comment on the Proposed Plan: Orally at tonight’s meeting By Letter to: ODEQ, Rachel Hanigan, 707 N. Robinson, P.O. Box 1677, Oklahoma City, OK By to: or Comments must be postmarked or ed by Monday, March 2, 2015.

Questions or Comments?