Alberta Tools ESRD Hydrology Community of Practice Chiadih Chang

Slides:



Advertisements
Similar presentations
WEAP Water Evaluation & Planning System
Advertisements

Bentley and ESRI Interoperability. Designed to serve all types of workflows Desktop Interoperability Server Interoperability.
Water Rights Accounting. New Accounting Model New Technology: 1979 versus 2011 – Faster processors – Faster graphics – Larger, faster, memory – Larger,
1.0 Abstract The purpose of this poster is to provide an overview of a GIS data framework and a suite of hydrology tools being developed to support watershed.
Providing Geography for Topology; A Schematic View of the National Watershed Boundary Dataset (WBD) James E. Mitchell, Ph.D. IT GIS Manager Kurt L. Johnson.
G EOSPATIAL D ATA L AYERS FOR A RC H YDRO R IVER Arc Hydro River Meeting Clark Siler Center for Research in Water Resources University of Texas at Austin.
Linking HIS and GIS How to support the objective, transparent and robust calculation and publication of SWSI? Jeffery S. Horsburgh CUAHSI HIS Sharing hydrologic.
GI Systems and Science January 30, Points to Cover  Recap of what we covered so far  A concept of database Database Management System (DBMS) 
Watershed Characterization System (WCS) and its Modeling Extensions
Arc Hydro Geodatabase Inventory Tool SWQM Program FY06 Arc Hydro Customization Project.
GIS Modeling Venkatesh Merwade, University of Texas at Austin Interdisciplinary aquatic modeling workshop, July 21, 2005.
Introducing the CUAHSI Hydrologic Information System Desktop Application (HydroDesktop) and Open Development Community Jiří Kadlec, Daniel Ames, Teva Velupillai.
Geographic Information Systems : Data Types, Sources and the ArcView Program.
1 Geographic Information Systems (GIS) Fundamentals for Program Managers.
GIS Models and Modeling Chapter 14. Introduction A model is a simplified representation of a phenomenon or system A model is a simplified representation.
USING GIS TO FOSTER DATA SHARING AND COMMUNICATION SEAN MURPHY IVS BURLINGTON, VT.
Geographical Information System GIS By: Yahia Dahash.
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
NSF DUE ; Laura Johnson Cherie Aukland.
Sharing Geographic Content
GRASS Geographic Resources Analysis Support System Gabor Heves 8 June, Belgrade.
Adem.alabama.gov GIS for Water Management: Flow Data Flow Building a Framework for Alabama.
ArcGIS Workflow Manager An Introduction
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
Introduction SPATSIM is a system that makes use of shapefiles
George Washington Birthplace NM: Geodatabase Development for Resource Management and Planning Bill Slocumb GIS Specialist and Research Associate North.
Arc Hydro Groundwater Data Model
BY:- RAVI MALKAT HARSH JAIN JATIN ARORA CIVIL -2 ND YEAR.
Introduction to Geographic Information Systems (GIS) Lesson 1.
Geographic Information System GIS This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF GIS Geographic Inf o rmation.
Flow Time Time Series Hydro FeaturesHydro Network Channel System Drainage System ArcGIS Hydro Data Model.
material assembled from the web pages at
Welcome to DEP’s GIS Workshop Series Workshop 3 Introduction to ArcGIS Desktop 1.
ArcHydro – Two Components Hydrologic  Data Model  Toolset Credit – David R. Maidment University of Texas at Austin.
Overview of WEAP. Water Evaluation and Planning System WEAP A generic, object-oriented, programmable, integrated water resources management modelling.
Introduction to ArcView NPS Introduction to GIS: Lecture 2 Based on NINC, ESRI and Other Sources.
CUAHSI Hydrologic Information Systems. HIS Project Team Yao Liang John Helly Project co-PI Collaborator.
Pre Conference Seminars 1 Arc Hydro and the Regional Watershed Modeling System in Texas William Burmeister, P.E. PBS&J, San Antonio, Texas.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Bringing “it” all Together !? Dean Djokic, ESRI David Maidment.
Role of Spatial Database in Biodiversity Conservation Planning Sham Davande, GIS Expert Arid Communities Technologies, Bhuj 11 September, 2015.
Exploring Spatial Data Infrastructure in an Open Source World Jacqueline Lowe UNC-Asheville National Environmental Modeling and Analysis Center Jacqueline.
Capabilities of Software. Object Linking & Embedding (OLE) OLE allows information to be shared between different programs For example, a spreadsheet created.
The Modelshed Framework Praveen Kumar and Ben Ruddell, CUAHSI HIS Update July 28, 04.
Clinical Collaboration Platform Overview ST Electronics (Training & Simulation Systems) 8 September 2009 Research Enablers  Consulting  Open Standards.
Portland, Oregon Arnold Engelmann - GIS Programmer/Analyst
ESCMID phone ESCMID/ESGAP Open Virtual Learning Community (OVLC) Draft Concept of Future Development and Costs November.
BASINS 2.0 and The Trinity River Basin By Jóna Finndís Jónsdóttir.
Arc Hydro for SFWMD Hydroperiod Estimation Operations Decision
1 Center for Research in Water Resources The University of Texas at Austin Water Management Information System for the Rio Grande/Rio Bravo Basin Carlos.
Towards Unifying Vector and Raster Data Models for Hybrid Spatial Regions Philip Dougherty.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
1 januari 2008 RIBASIM input data by Wil N.M. van der Krogt.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Integration of Laserfiche and GIS with GeoDoc ® IS121 Beth Dennis, Urban Crossroads, Inc.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Modeling of Flows in GIS. Michael F. Goodchild Alan Glennon Department of Geography University of California, Santa Barbara 8 December 2004 Hot Creek,
The Bear River Watershed Information System Jeffery S. Horsburgh Utah Water Research Laboratory Utah State University David.
Store and exchange data with colleagues and team Synchronize multiple versions of data Ensure automatic desktop synchronization of large files B2DROP is.
Module 4 Data Management-Applications Coastal Applications of ArcGIS.
LP – MUNICIPALITY OF PATRAS State of Implementation of project “Neighborhood Social Planning and Development” Acronym: ‘NEBSOC’ T. Roustanis Bari, 3-4/11/2014.
Bdsfbdsfb NHDPlus for Corpus Christi Bay Term Project Report Nishesh Mehta Nishesh Mehta 21 st November st November 2006.
ECoastal Training USACE Coastal CoP Meeting and Workshop eCoastal in a Nutshell: An Introduction to the eCoastal Program & Custom Applications Rose Dopsovic.
Integrating ArcHydro and HEC Models by David R
Arc Hydro for EPA Basins
Modeling tools Training Module
Digital Elevation Model Based Watershed and Stream Network Delineation
You’ve lost the hope in it.
QGIS, the data model, use and storage
Presentation transcript:

Alberta Tools ESRD Hydrology Community of Practice Chiadih Chang Alberta Environment and Sustainable Resource Development PPWB Prairie Hydrology Workshop Winnipeg, January 29-30, 2013

Purposes of the Presentation Share the information about Alberta tools Exchange experiences and ideas Foster collaboration opportunity

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

Vision – ArcHydro as a Foundation for Watershed Management in Alberta

Current Status of Alberta ArcHydro ArcHydro data are organized into each of the 18 major basins in Alberta Snow pillow data

Current Status of Alberta ArcHydro Each major basin contains: Raster Data (DEM-related data) Vector Data (catchments, drainage lines, etc.) Network Data (geometric network) Daily Time Series Data (hydro-climate data) Snow pillow data

Current Status of Alberta ArcHydro Tool developments using AB ArcHydro as data framework, e.g., Alberta IFN Desktop Method Snow pillow data

Benefits of Using ArcHydro A simple, extensible geodatabase design Scale-independent Strong water resources network model Features integrated through relationships Supported by customized ArcHydro toolset Integration of geospatial and temporal water resources information Simplifying connection to water resources models, e.g., Alberta IFN Desktop Method, MIKE SHE, HEC-GeoRAS, HEC-GeoMHS - Align with Alberta’s “Unleashing Innovation on Water Strategy” Vision (“Today’s Opportunities, Tomorrow’s Promise: A 20-Year Strategic Plan for the new Government of Alberta). - Generate consistent results when performing queries on EMS records. - Automate labour intensive processes in dealing with water allocation. - Ease the use of GIS technology, data, information for water allocation. - A cost efficient solution to meet our business need.

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

What Is AWAIT ? Alberta Water Allocation Information Toolbox (AWAIT) is a user-friendly, GIS-based decision support toolbox to automatically: extract filter query display, and summarize water allocation and approval information stored in the Environmental Management System (EMS) of Alberta.

AWAIT Interfaces

Query Example

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

Public SSRB Licence Viewer http://ssrb.environment.alberta.ca/licence_viewer.html Required as part of the SSRB Implementation Plan If desired select a predefined Water Management Area (WMA) Display all licences spatially on the map, with the ability of selecting the certain activities such as Agriculture, Municipal, etc. Select by user defined polygon Export Capabilities and link to the scanned licence document

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

Water Allocation Modelling WRMM Water Resources Management Model Wrm-Dss Water Resources Management Decision Support System WRMM is a water allocation planning tool used by the Alberta Government Used on an ongoing basis for decision support

Water Allocation Modelling WRMM (the original) Owned by Alberta ESRD Used in Southern Alberta Water Planning 30 year history Designed specifically for Alberta (1st in time, 1st in right) Water Act Instream objectives Reservoir operating policy Runs quickly WRMM has been used: in all substantial water management planning projects in Southern Alberta in development of operation plans for our major water infrastructure

Water Allocation Modelling Wrm-Dss (WRMM version 2) Enhanced Capacity, Capability, Efficiency, and User Friendliness More optimal solution than WRMM No limitation on size of schematic Uses databases to store model data Backwards compatible (can still use text files) Includes channel routing features For daily operational decision support Current status: Debugging and stress testing of Wrm-Dss code Migrating our existing WRMM models to work in Wrm-Dss

Water Allocation Modelling Graphical User Interface for WRM-DSS Visual model designer Can use maps or images created in GIS applications for backgrounds Makes model design visual State of the art industry standard programming Potential to migrate to the Web Can be developed independently and in parallel to Wrm-Dss application No licencing / maintenance fees for dep’t

GUI replaces the need to edit a text file.

Screen shot of GUI utility Background map can be turned off to have a clear view of schematic. Components and their labels can be made of any color. Components are connected to each other. Moving a demand will not break the connection with its channel.

Alberta Tools AB ArcHydro Alberta Water Allocation Information Toolbox (AWAIT) SSRB Licence Viewer Water Allocation Modelling Tools for SSRB WMP Implementation

Tools for SSRB WMP Implementation Requirements for the SSRB WMP Implementation: Water Conservation Objective (WCO) is based on natural flow and existing In stream Objectives (IO). Calculation of natural flows needed on a near – real time basis. Administration of Priority Call under the Water Act Water Shortage Management tool (Southern Region Water Shortage Plan) WCO/IO Performance Assesment Tool Water Shortage and Priority Call Tool WCOs in Red Deer, Bow, Oldman and South Saskatchewan River sub-basins were established January 2007 in accordance with the recommendations in the SSRB Water Management Plan. The recommended WCOs are tied with natural flows and existing IOs. AENV has limited capacity to compute near real time natural flows at certain locations on main stems of Red Deer, Bow, Oldman and South Saskatchewan Rivers. The capacity needs to be expanded to include more locations in the main stems and also on major tributaries. Besides expanding to include more locations, the existing methodology needs to be reviewed and, if possible, refined. The ultimate goal is that Department should be able to implement the established WCOs in all the identified Water Management Areas (WMAs) and/or reaches and this information is made available to the public. Therefore, an automated system for estimating natural flows in ungauged watersheds and a priority call administration system is proposed to implement the WCOs required under the Water Act. Water shortage management tool - Ability to delineate a watershed anywhere and identify all licences within the watershed. Provide a list of all licences, compare conditions of licences and determine if withdrawal of water is allowed based on Natural flows and recorded flows at stations. This is basically done at the established Water Management Areas which Have recorded flows. Priority Administration tool – Search capability of licence in question, Watershed delineation, Identify licences upstream of priority call, sort Junior and Senior licences from the one requesting a priority call, ability to exempt certain purposes, export capability, map creation, produce Water Management Orders to stop diverting, send e-mails, text, or telephone call. Steps for Pragmatic approach Estimation of a representative regional non-dimensional FDC 2. Calculation of actual FDC at the required (destination) site (multiplying the non-dimensional regional curve by an estimate of the long-term mean discharge obtained) 3. Conversion of the actual FDC at a site into a continuous streamflow hydrograph Pragmatic approach - to calculate Natural Flow (GIS based) Data Analysis Tool

Alberta Tools Making a Difference! Without Alberta Tools versus With Alberta Tools Stressful and frustrated staff due to inaccessible data/tools and laborious, inconsistent, time consuming work. Happy & productive staff who are making meaningful contributions to water/watershed management in Alberta.

Q&A, Comments and Discussions Thank You! Q&A, Comments and Discussions “Tell me, and I’ll forget. Show me, and I may not remember. Involve me, and I'll understand.” (Anonymous)