O. Napoly, C. Madec CEA-Saclay, Irfu/SACM

Slides:



Advertisements
Similar presentations
I XFEL Module Assembly AWLC’14, 14/05/2014 O. Napoly, CEA.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
ECFA LC2013 ECFA LC13 SRF Technology Summary Wolf-Dietrich Möller Rongli Geng Hitoshi Hayano ECFA LC13 SRF Technology Summary Hamburg, Mai 31 st 2013.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
O. Napoly, ILC Industrial Forum, IPAC May Status of XFEL Module Assembly at Saclay O. Napoly, CEA-Saclay, IRFU/SACM.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Requirements for Cryomodule What have to be inevitably realized?
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
J. Osborne LHeC Linac Design Issues Frank Zimmermann 10 December 2010.
Recent Result for the STF-2 Cryomodule Operation
Crab Cavity Technical Coordination meeting:
Status of E-XFEL Module Assembly at Saclay
Status of SCRF Accelerator Activities at CEA-Saclay
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
FRIB Cryogenic Support
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
X-FEL linear accelerator
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
IHEP Cryomodule Status
EU-XFEL summary of performance degradation
Retreatment of Superconducting Cavities for the European XFEL
Cryomodules Challenges for PERLE
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
XFEL cryomodule production and Reliability improvement
ERL Director’s Review Main Linac
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

O. Napoly, C. Madec CEA-Saclay, Irfu/SACM XFEL Module Assembly O. Napoly, C. Madec CEA-Saclay, Irfu/SACM 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

O. Napoly, Journées ILC, Saclay XFEL vs. ILC The 4 reasons why the XFEL cryomodule production is useful for the ILC : Industrialization ILC cryomodule demonstration XFEL linac system test Infrastructures for ‘EU Hub’ for ILC cryomodule production in chronological order. 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

XFEL vs. ILC: XFEL Linac System Test 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

XFEL accelerator is a factor 10 smaller than ILC @ 250GeV c.m. energy Linac supraconducteur de 17,5 GeV e- 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

LINAC technology will be 90% identical 101 cryomodules 808 coupleurs RF 120 kW @ 5 mA 808 cavités 1.3 GHz / 23,6 MV/m 26 stations RF (10 MW) opérant à 5,2 MW 1 1 7 18-38 m s/sol 1 secteur cryogénique (12 modules) : 120 W @2K, 204 W @5-8K, 1,4 kW @40-80K 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

O. Napoly, Journées ILC, Saclay XFEL Linac System Test XFEL Linear Accelerator is only a factor 10 shorter that the ILC @ 250 GeV c.m. energy. The RF technology will be 90% similar. The beam operation will be very similar: ~1 ms pulse ~ 1 mA pulse current ~ 0.5 % duty cycle When XFEL linac operates (2016) it will provide a large scale system-test of the ILC: alternate technical choices will be very difficult to justify if ILC performance is achieved. 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

XFEL vs. ILC: Industrialisation The 5 reasons why the XFEL Industrialisation is beneficial to the ILC: Building of expertise and infrastructure in EU labs Building of expertise and infrastructure in Industry Networking EU industries Breaking ground for key technical aspects, e.g. brazing of coupler, pressure equipment certification for cavities and Helium tanks, etc… large scale quality management (industrial methods, EDMS) Reliable costing, including schedule and manpower 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Cryomodule Assembly at CEA-Saclay Commitment of CEA to the E-XFEL Accelerator Consortium: assembly of 103 accelerator modules with 1 per week throughput ! operated by an industrial contractor on the Saclay site and with CEA infrastructures 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Industrial Contract Phases and ALSYOM Staffing Staff Evolution Start of production phase XM2 Start of training phase 23/09 XM1 04/09 XM-1 01/07 XM-2 XM-3 02/04 07/08 17/09 24/04 Start of observation phase w38 w1 w11 w21 w31 w41 w51 2012 Project Weeks 2013 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

XFEL vs. ILC: ILC Module Demonstration 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

O. Napoly, Journées ILC, Saclay XM-3 RF Test Results cryomodule test cavity tests 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

O. Napoly, Journées ILC, Saclay XM-3 : ILC Cryomodule A success for SRF Technology Average individual cavity gradient: 32 MV/m Average cavity pair gradient: 29 MV/m Three cavities reach gradients above 38 MV/m Cryogenics losses are lower than specified. A success for String and Module Assembly: Seven cavities are reproducing VT gradient The cryomodule reproduces gap of 230 MV Cavity 1 is degraded from 31 down to 23 MV/m useable gradient: gate valve/cav1 connection not for training ! Qualifies CEA assembly team (100% string assembly by CEA), procedures and partially the production tool (ISO4 clean room, DESY pumping units, 3 mobile clean rooms, procedures, big tools) The clean room vacuum system was not complete (CEA cavity venting on rails) A success for the industrialization process: XM-3 is the assembly demonstration cryomodule of CEA w.r.t. ALSYOM contract. 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Infrastructures for ‘EU Hub’ for ILC cryomodule production XFEL Village at Saclay 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Overview of the Assembly Buildings XFEL Village Clean rooms 4 Bât 124 Nord 25x15 m² 7 6 CourtYard 3 2 Bât. 126 Nord 40x11 m² Assembly halls 5 1 8 Bât. 126 Sud 30x17 m² 6b Offices Warehouse ©GoogleMap 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Village XFEL: 7 stations de travail Roulage RO-WS1 & 2 Aire Alignement AL-WS1 & 2 Magasin Aire Coupleurs CO-WS1 & 2 Aire Réception REC-WS1 Salle Blanche CO-WS1 & 2 SA-WS1 & 2 Aire Enfourneur CA-WS1 Les sept stations, optimisées pour cinq jours de travail, forment une chaîne de montage de sept semaines, pour une cadence hebdomadaire d’expédition. Aire Expédition SH-WS1 & 2

Organisation of Work Stations Clean Room Cold Coupler Area (IS04-CC-WS1) Cold coupler assembly Clean Room String Assembly Area (ISO4-SA-WS1, ISO4-SA-WS2) String connections (1 gate valve + 8 cavities + 1 Qpole unit) Roll-out Area (RO-WS1, RO-WS2) HOM tuning, magnetic shielding, tuners,… 2Ph-tube welding, cold-mass connection Alignment Area (AL-WS1, AL-WS2) Cavity and quadrupole fine alignment Coupler shields and braids, tuner electric tests Cantilever Area (CA-WS1) Welding of 4K and 70 K shields, super insulation Quad current lead Insertion into vacuum vessel and string alignment Coupler Area (CO-WS1, CO-WS2) Warm couplers + coupler pumping line Control operations (electrical, RF) Shipment Area (SH-WS1, SH-WS2) CEA-Alsyom “acceptance test” End-caps closing, N2-insulation, loading. In full production, this chain of workstations will be fully occupied with 7 cryomodules (XMn-6 @ WS1,…, XMn @ WS7) stationed for one week. A Cryomodule Factory ! 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

O. Napoly, Journées ILC, Saclay Clean Room Layout ISO 7 (class 10 000) 28 m2 5.92 m x 4.72 m ISO 5 (class 100) 38 m2 7.72 m x 4.72 m ISO4 (Class 10) 112 m² 7.8 m x (6.6+7.8) m 15.6 m May 2012 PXFEL2_2 December 2012 XM-3, with Alsyom 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 1. Coupler Cold Part assembly (ISO4-CC-WS1&2) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 2. Cavity String assembly (ISO4-SA-WS1&2) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 3. String dressing on Roll-out station (RO-WS1&2) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 4. Alignment (AL-WS1&2) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Cryomodule Transfer The electrical transfer vehicle is fully operational. Spares have been ordered for all critical parts (e.g. battery, etc…) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 5. Cold Mass insertion (CA-WS1) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 6. Coupler Warm Part assembly (CO-WS1&2) 6.a coupler warm part assembly 6.b coupler pumping line assembly 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Assembly prototyping at Saclay 7. Final control and shipment (SH-WS1&2) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

EU Hub’ for ILC cryomodule production Production organisation in 3 regions A. Yamamoto For ILC 500 GeV with ~2000 cryomodules: The goal is to reach a production rate of 2 cryomodules/wk * 5 (3) hubs → 4 (7) years of construction For XFEL 100 cryomodules : 1 cryomodule / wk. Infrastructures do match the production rate of 2 CM/wk Main challenges for Irfu-IN2P3: Be a ‘Hub-Lab’ (ou ‘Tier 1’) for the infrastructures built for XFEL at LAL-Orsay and Irfu-Saclay Close partnership with the french companies : Thales, Alcen/Alsyom, Aperam, Jehier, etc… et européens, RI, Zanon, BNG, Plansee, Heraeus, VAC. Supprimer l’interface entre le LAL et l’Irfu pour les activités Coupleurs-Cryomodules

Assembly Industrialization (reserve) 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Challenge : Tooling vs. Indial Contract Ideally the tooling definition should be included in the industrial contract. This was impossible with our project timeline and readiness: e.g. the clean room was delivered in Nov. 2009. The contract specifies that the Industrial Operator is only responsible of the standard tools, while CEA is responsible for the specific tools and their maintenance. The contract is essentially ‘Man and Engineering Power’ As a consequence, the industrial operator will criticize the infrastructure layout and the tooling made available to him: e.g. cavity reception area, e.g. cavity support and pre-alignment tools in the clean room, e.g. layout of shipment vs. VV strorage area Some of the criticisms come too early, missing the global scheme. Some of the criticisms will lead to a better optimized production. 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Input Data Readiness for Industry Transfer 14/11/2013 @ CfT Kick-off Prod Infrastructure and Tooling 80% 90% 100% (in the broad sense, e.g. cavity supports) Cryomodule Configuration 70% 85% 100% Cryomodule Documentation PBS (or MBOM) 30% 70% 100% Availability of Drawings 30% 70% 100% Assembly Documentation (WBS) Availabitity of Assembly Procedures 50% 75% 100% Availabitity of Control Procedures 50% 75% 100% Availabitity of Regulation (PED, Safety) 20% 75% 100% (qualitative %) Ideally, all ratios should be 100 % (cf. cavity production, or AMTF). Industry cannot start production w/o 100% of Input Data in their Resource Planning software (ERP) Overall Quality of the Process (RF acceptance) 60% 60% 100% 28 Novembre 2013 O. Napoly, Journées ILC, Saclay

Selection of Industrial Contractor Tender process: ALSYOM, lowest bidder / best technical offer, has been selected by CEA. Up to 29 people will be on Saclay site during ~2 ½ years Fields of expertise requested: Management (resource planning, stock, quality) Engineering (method, drawings, tooling) Clean room and cleaning Vacuum RF Welding Survey Mechanical operations 28 Novembre 2013 O. Napoly, Journées ILC, Saclay