Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.

Similar presentations


Presentation on theme: "Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific."— Presentation transcript:

1 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific and Annual Meeting (DESY, 22 November, 2010) ILC HiGrade WP7 couplers

2 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 2 IN2P3 Les deux infinis  R&D at LAL (Eucard)  Coupler production  Process  Subcontractor status  LAL status  Schedule  ILC Higrade cost ILC HiGrade WP7 couplers Summary

3 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 3 IN2P3 Les deux infinis Clean with alcoholised tissues dust « free » surfaces Place the parts in the MAS Pieces in the MAS Place the piece in the bath Pieces in the bath Full and warm the bath (detergent+water) T=50°C Ultrasonic bath Time=15min Rinse the pieces Resistivity > 14MOhm.cm Dry under laminar flow 48h Count the particules Nb (size>0.3µm)<10part/pieds3 Bake under vacuum Time=24h Dirty coldparts and test waveguide Assemble the pieces 1 2 3 4 5 6 7 8 9 Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath 1 2 5 4 3 6 7 8 9  Actual LAL cleaning process Disavantages: - Total time> 120h  5 days -No repeatability of the process -Pollution risk on pieces between each steps LAL R&D (Eucard) : Automatic Cleaning System Eucard WP 10.8

4 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 4 IN2P3 Les deux infinis  Future cleaning process LAL R&D (Eucard): Automatic Cleaning System Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Cleaning Machine Bench Rinsing sink Ultrasonic bath 1 2 3 Machine loading Loaded parts Machine Cycle End of machine cycle Machine unloading Exited parts Cold (or warm) parts and test waveguide Parts assembly 1 2 3 Eucard WP 10.8 Advantages: -Reduce the total time and work as a background task (during the night for example) -Improve the repeatability of the process -Suppress the pollution risk of pieces between the steps Machine ready by the end of 2011

5 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 5 IN2P3 Les deux infinis  Process  Gas discharge introduction into internal coupler part  Controlled pumping to reach 10-1 mbar pressure and create a laminar pumping flux  Direct current bias application with a positive antenna voltage and a grounded coupler corps  Plasma creation at all power coupler internal parts LAL R&D (Eucard): Plasma discharge Eucard WP 10.8 R.G.A Gauge Cold part Transition wave guide box (TWG) DN16CF viewport All metal valve DN40CF All metal valve DN16CF Adaptator DN40KF for turbo pumping + Gas inlet Pumping Bench for experiment ready by the middle of 2011

6 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 6 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Base line strategy  Goal  Add the ILC HiGrade coupler order to the XFEL order  Advantages  Good XFEL production follow up  Mass production cost  Disavantage  Linked with the XFEL schedule

7 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 7 IN2P3 Les deux infinis Coupler production SubcontractorLAL IRFU RF Conditioning Assembling on cryomodule Manufacturing and cleaning ILC HiGrade WP7 couplers Coupler production XFEL Coupler cryomodule integration LAL ILC HiGrade coupler  Process ILC HiGrade experiment ??? Location ??? ? ?

8 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 8 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Subcontractor Manufacturing and cleaning First step  Subcontractor status  Contract signed with Thalès RI on July 2010 with the following previous spliting:  640 XFEL couplers  30 ILC Higrade couplers  3 x cryomodules ???  6 x spares or ….???  Deliveries:  4 couplers expected by end of Feb 2011  20 couplers expected by end of May 2011  24 couplers expected by end of July 2011  …  Last 24 couplers expected by end of July 2013 Coupler production

9 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 9 IN2P3 Les deux infinis Hall ISO 7 (cl. 10 000) ISO 5 (cl. 100) Storage2 2 Unpacking (box)3 3 Unpacking (bag) 4 4 In situ baking 5 5 Conditioning 8 8 Ionic pumping 6 6 Antenna adjustment 7 7 Packaging 1010 Dismounting 9 9 Storage 11 11 Expedition 12 12 Reception1 1 ILC HiGrade WP7 couplers E. Genesseau et al LAL RF Conditioning Second step Coupler production  LAL status  Production layout

10 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 10 IN2P3 Les deux infinis Station ready by January  End of march 2011 ILC HiGrade WP7 couplers LAL RF Conditioning Second step Coupler production status  LAL status  Current situation of the infrastructure

11 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 11 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Schedule

12 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 12 IN2P3 Les deux infinis ILC HiGrade WP7 couplers ILC HiGrade cost  Global cost of ILC HiGrade couplers:  Manufacturing cost (Thalès RI)  30 x XFEL coupler manufacturing = 30 x 25 000 = 750 000€  Conditioning cost (LAL)  30 x coupler conditioning = 30 x ? = ? €  Tooling for delivery  15 x 5000 = 75 000€ (if the delivery is done before the end of XFEL production) Tooling ~ 5000€ per pair

13 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 13 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Questions & Conclusion  Does anybody need couplers in ILC Higrade project? CHECHIA? CryHoLab? …?  If it is the case, we would like to know :  Location  schedule  Packaging of delivery  If it is not the case, could we use them like :  Ordinary XFEL couplers mounted on cryomodule?  XFEL coupler spares ?  Or any LAL R&D ?  All of that will define the ILC Higrade coupler :  Delivery schedule  Payment schedule  budget needed for 2011

14 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 14 IN2P3 Les deux infinis

15 Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 15 IN2P3 Les deux infinis ILC HiGrade WP7 couplers Schedule