April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.

Slides:



Advertisements
Similar presentations
Part F Practical Applications. 28. Fan-Cooled Enclosure of a PC System Physical System The physical system of interest is a fan-cooled enclosure containing.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
IBL temperature analyses Bart Verlaat 22 April
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
FEASIBILITY OF COMPONENTS CLARA ECHAVARRIA & JONATHON LOCKE.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
1 3/25/2010 PHENIX WEEKLY PLANNING 4/1/2010 Don Lynch.
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
TSV-Constrained Micro- Channel Infrastructure Design for Cooling Stacked 3D-ICs Bing Shi and Ankur Srivastava, University of Maryland, College Park, MD,
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
MICROMEGAS General Meeting GAS DISTRIBUTION SHCEMES FOR THE MICROMEGAS DETECTORS OF THE NSW OF ATLAS NTUA T. Alexopoulos, S. Maltezos, S.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
UT cooling discussion 3 december 2014
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
1 4/8/2010 PHENIX WEEKLY PLANNING 4/8/2010 Don Lynch.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 4/15/2010 PHENIX WEEKLY PLANNING 4/15/2010 Don Lynch (Income Taxes Due Today)
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 4/22/2010 PHENIX WEEKLY PLANNING 4/22/2010 Don Lynch.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Feedback on transfer line sizing and flow calculations for UT
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Pixel cooling specifications
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Pixel CO2 Cooling Status
Detector Technology Group
Radiation Laboratory Meeting
Tracer Applications.
Presentation transcript:

April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch

April 7, 2010D.R. Lynch 2 New Argon Dewar and Empty Gas Bottle Storage Area (skip 24 slides)

All connections were made with 1/4” polyflow fittings with a minimal ID of.125” except of the stave heat sinks themselves ( 45 deg barbed with max ID of.080” ) Tubing = Tygon 1/4” OD, 1/8” ID Formula 2001 (max pressure 30 psi) or SE-200 (max pressure 85 psi) clamped to the polyflow inner tube with a plastic ‘herbie’ clamp. Flowmeter 0 -1 GPM (H 2 O), Gages psi, Manifolds 1” x 1” x 2” Alum with 1/2” ID. 60 psi H2O Manifold o 1 0 – 1 GPM 11” Heat Sink = Choke Point PSI 6” 12”12” 12” 6” Single Stave Heat Sink BNL Test Set-up VTX Cooling System Redesign

April 7, 2010D.R. Lynch 4 60 psi H2O Manifold o 1 0 – 1 GPM 11” Heat Sink 0 – 100 PSI 6” 12” 6” BNL Tests: 3 Staves in Series = Choke Point 60 psi H2O Manifold o 1 0 – 1 GPM 11” Heat Sink 6” 12” 6” 3 Staves in Parallel 0 – 100 PSI

April 7, 2010D.R. Lynch 5 Barbed fitting glued to ends of carbon fiber heat sink Cut away view of fitting showing choke point (Image courtesy of Hubert) Tests indicate that the choke points in the sysem are the 45 deg bends in the plastic barbed fittings on the stave heat sinks (see below) Obstruction (cross-section A – B) can’t be filed or cut out very easily without doing damage to the fitting.

April 7, 2010D.R. Lynch 6 Test Results used to adjust pixel analytical flow model for choke point only. Strip pixel model required no adjustment.

April 7, 2010D.R. Lynch 7 In order to find an acceptable configuration and set of flow parameters a completely new set of flow and thermal calculations for the pixel staves, strip-pixel staves and FVTX disks 1-4 was set up. The specifications fixed for the analyses were as follows: Maximum inlet pressure: 20 psig Maximum pixel sensor temperature: 20ºC Maximum strip-pixel sensor temperature: 0ºC Maximum FVTX disk sensor temperature: 20ºC Maximum pressure drop between external inlet manifold and external outlet manifold: 10 psid Electronics heatloads Additional input for the calculations: estimate ambient heat gain for detector is distributed among all cooling loops as a ~ 35% increase in sensor heat load. (Based on conservative ambient heat gain analysis.) Temperature rise from cooling circuit wall temperature to sensor is derived from HYTEC thermal analyses: scaled from FEA calculation specified heat loads to tabulated (spreadsheet heatloads) and scaled again for 35% ambient load allowance described above. It is assumed that the FEA analyses Flow calculations for FVTX based on available information in FEA, tabulating spreadsheet and flow diagrams provided by HYTEC. Calculations should be considered as design requirements for future FVTX design work to assure appropriate flow balancing. Flow calculations were iterated until flows were balanced by pressure drop among all parallel loops and maximum exit temperatures for all loops met above requirements The FVTX exit flow will be channeled through an external heat exchanger to precool N2 flow to the detector gas enclosures. This will be established empirically during VTX installation and the results provided to FVTX for final thermal/flow design refinements after VTX installation this summer.

1 loop in layer 1, 2 loops in layer 2 per ½ detector New internal loop designs which meet design requirements Layers 1 and 2 Pixel Stave Cooling Loop F V = 17.3 ml/sec Tin= -8 ºC Pin = 138 KpA (20 PSIG) Tout= -4ºC Pout = 69 KpA (10 psig) Layers 3 and 4 Strip- Pixel Stave Cooling Loop F V = 27.6 ml/sec Tin= -8 ºC Pin = 138 KpA (20 PSIG) Tout= -6ºC Pout = 69 KpA (10 psig) 2 loops in layer 3, 3 loops in layer 4 per ½ detector FVTX Cooling Loop Disk 1 Disk 3 Disk 2 Disk 4 F V = 19 ml/sec Tin= -8 ºC Pin = 138 KpA (20 PSIG) Tout= -7ºC Pout = 69 KpA (10 psig) 1 loop in north end, 1 loop in south end per ½ detector

VTX/FVTX West VTX/FVTX East Current Proposed Flow Concept (Internal Configuration) Layer 1 FVTX Big Wheels Layer 2 Layer 3 Layer 4 Layer 1 FVTX Big Wheels Layer 2 Layer 3 Layer 4

April 7, 2010D.R. Lynch 10 VTX/FVTX Flow Schematic, ½ detector Layer 1 Pixel Loop Layer 2, Pixel Loop 1 Layer 2, Pixel Loop 2 Layer 3, Strip-Pixel Loop 1 Layer 3, Strip-Pixel Loop 2 Layer 4, Strip-Pixel Loop 3 Layer 4, Strip-Pixel Loop 1 Layer 4, Strip-Pixel Loop 2 North FVTX Loop South FVTX Loop Novec 7200 in Novec 7200 out Inlet Manifold (external to detector) Exit Manifold (external to detector) N 2 pre-cool heat exchanger

April 7, 2010D.R. Lynch 11 VTX/FVTX Thermal Calculation Summary LayerCoolant Number of loops/layer # Circuits in parallel per loop # of passes in series per loop Fluid Inlet TemperatureInlet Pressure Flow rate in circuit Total flow rate in loop FF CC psi gkPagpmml/secgpmml/sec 1Novec * Novec * Novec Novec FVTXNovec LayerTotal Loop Heat Load Fluid Outlet Temperature Loop Pressure drop Maximum Sensor TemperatureNotes BTU/hrWatts FF CC psidkPa FF CC circuits in 1st pass, 3 circuits in 2nd pass FVTX * * includesDisk 1 through 4 in series and N2 pre- cool heat exchenger

April 7, 2010D.R. Lynch 12 After determining internal flow requirements, the inlet and exit piping requirements were analyzed with the following results: Flow: ~7.5 gpm Piping length: 100 feet each, inlet and outlet Inlet and outlet ambient heat gain: 1.4 kW (total for inlet and outlet assumes moderately insulated piping) Pipe size: 1 inch ID Piping pressure drop: 8.45 psid inlet and same for outlet (maximum allowed 10 psid both sides) VTX/FVTX Chiller Requirements (not including “Big Wheels”) Coolant: Novec 7200 Flow rate: 7.5 gpm Coolant Supply Temp.: -9ºC Coolant Supply Pressure: 30 psig Capacity: ~4 kW VTX/FVTX Chiller Requirments (“Big Wheels”) Coolant: Ethylene Glycol/Water 60/40 Flow rate: TBD gpm Coolant Supply Temp.: TBD ºC Coolant Supply Pressure: TBD psig Capacity: ~2.5 kW Inlet and Return Piping Calculations & Requirements

April 7, 2010D.R. Lynch 13 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: The shutdown starts in just over 2 months. Keep track of our progress on the PHENIX Engineering Web site at the link below.