Schedule & operation. Schedule These few months: – Reconfigure thermal gun for positron generation – New laser system in ground laser room. Increase pulse.

Slides:



Advertisements
Similar presentations
Thermal properties of laser crystal Rui Zhang ACCL Division V, RF-Gun Group Feb 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Advertisements

KEK : Novel Accelerator TYL Workshop M. Yoshida, M. Nozaki, K. Koyama, High energy research organization (KEK) -Collaboration -IZEST (CEA) :
RF-Gun cavity for high charge electron generation Takuya Natsui.
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Characteristic evaluation of new laser crystals Rui Zhang ACCL Division V, RF-Gun Group Feb 20, 2015 SuperKEKB Injector Laser RF Gun Review.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
WG4 Injector and beam manipulation concepts (low emittance e+ and e- sources, emittance exchange, reduction and preservation approaches,...) John Power.
Yb Fiber Laser System Xiangyu Zhou 19. Feb
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
RF Synchronization, control and stability Takuya Natsui.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
Low Emittance RF Gun Developments for PAL-XFEL
K.Furukawa, KEK, RF-gun review, Feb Linac Upgrade towards SuperKEKB Injector Linac Kazuro Furukawa for Injector Linac 1.
September, 2009 H-BRIDGE MODULES AS BOX-LEVEL PULSED POWER COMPONENTS R.J Adler, V Weeks, J. A Gilbrech, and D. T Price Applied Energetics Tucson, AZ,
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Herman Winick Mentorship October 2, 2012 Herman Winick Mentorship J. Schmerge 1.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Laser stability Takuya Natsui. Oscillator phase lock stability.
Laser System Upgrade Overview
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Operational experience of high-power RF at Diamond Light Source
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Nd:YAG Solid Laser Xiangyu Zhou 20. Nov Yb fiber laser system on the ground Menlo 1030nm oscillator Grating stretcher (Transmission) SOA pulse.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
BEAM ACCELERATION EXPERIMENT IN X-BAND GHZ LINAC FOR COMPTON SCATTERING X-RAY GENERATION Hirotoshi Masuda The University of Tokyo.
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
Operation Status of the RF Systems and Taiwan Photon Source
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Page Headline Beam Commissioning Adam Bartnik.
Degradation and Recovery of Cavity Performance
Current Situation of Yb:YAG Laser at A1 Ground Laser Hut
Laser System Upgrade Overview
Introducing European XFEL Enlightening Science
Availsim runs and questions
Nd:YAG Solid Laser 3-2 / A-1 on the ground
Situation of Yb:YAG Thin Disk Laser for A1 Ground Laser Hut
ILC/CLIC e+ generation working group
CEBAF Injector Overview
Operational Experience with the Cornell ERL Injector SRF Cavities
The Cornell High Brightness Injector
LCLS Injector: Introduction D. H
CEPC RF Power Sources System
RF-Gun for Phase-II RF Gun 10, June, 2016.
Electron Source Configuration
Test RF gun cavity Takuya Natsui.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions and the Impact on Operations Ewan Paterson LCWS15 Meeting NOV 3, /24/2019.
ATF project meeting, Feb KEK, Junji Urakawa Contents :
High Charge Low Emittance RF Gun for SuperKEKB
LCLS Injector Configuration
J. Seeman Perugia Super-B Meeting June 2009
DC Photocathode Gun (JLAB)
SuperKEKB required (e+ / e-)
Presentation transcript:

Schedule & operation

Schedule These few months: – Reconfigure thermal gun for positron generation – New laser system in ground laser room. Increase pulse energy from fiber laser Simplify the laser system Next summer: – Second RF-Gun with new cathode – Cryogenic Yb laser

KL_A1_AKL_A1_B RF-Gun1 RF-Gun2 加速管 Reconfiguration of A-1 injector area

Human resource and collaboration Integration : M. Yoshida RF-Gun :T. Natsui Cathode : D. Sato (Titech) Beamline : H. Kumano (Mitsubishi), M. Chiyokura, LINAC Accelerator group Laser : – Fiber laser : Z. Xian, Y. Moriai (P.A.lab) – Control : T. Natsui, N. Toyotomi (Mitsubishi) – Solid laser : R. Zhang / T. Natsui – LD and Yb:YAG : Hamamatsu Photonics – Crystal bonding / growth : Taira lab(IMS) Beam transport : LINAC comissioning group (LCG) Thermal gun : T. Osawa, LINAC Accelerator group And many advisors – U-Osaka / RIKEN / U-Tokyo / AIST

Technology transfer to Mitsubishi operators Nd laser system was built by Mitsubishi.

24 hour operation Complete the simplest laser system – Reduce MTBF items Redundant RF-Gun and laser system – Reduce failure rate Required human resource : 1 week = 21 shift – Staff : 1 shift / week x 4 staffs= 4 – Expert operator : 5 shift / week x 2 staffs= 10 Sum= 14 ? Must increase expert operators. – More 2 experts (total 4) will be required.

Considerable faults of RF-Gun Cavity discharge Cathode degradation Laser window damage MTTR = 7 days ?

Considerable faults of laser system Failure rate = Redundant laser system is required.