RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.

Slides:



Advertisements
Similar presentations
The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Front end test stand — WP2
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
UKNF OsC RAL – 31 st January 2011 UKNF achievements & plans J. Pozimski.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
RFQ Integrated Design Would like to have a method of designing RFQ where all steps are integrated: –Engineering design. –EM modelling. –Beam dynamics simulations.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
MedAustron Beam Intercepting Devices BID Workpackage Review 15 March R. Folch EN/STI - BID Workpackage Review - March 2012 Speakers: Ramon.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
1US-UK Workshop, Jan 12-14, 2012 Working Group 4 - High Power Proton Accelerators: Achievements and Plans for Second PASI Workshop John Thomason & Steve.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
RFQ 3Dtree Space Charge Studies Simon Jolly 6 th June 2012.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
The CERN Linac4 history, performance, perspectives
The RAL Front End Test Stand
The RAL Front End Test Stand
Modelling of diagnostics for the ISIS ring
A. Martynov on behalf of accelerator division.
GPT Simulations of the Ion Source Beam
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the Front End Test Stand April 2007.
Optimisation of the FETS RFQ
HiPoSpaNS High Power Spallation Neutron Source
commissioning and measurements
Physics Design on Injector I
The SPL-based Proton Driver at CERN
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group

Overview The RAL Front End Test Stand (FETS) will test the high speed beam chopper under full beam conditions. High intensity H - ion source, optimised LEBT, 2.5 MeV RFQ, chopper line, beam dump, diagnostics. Build on experience gained with the ISIS RFQ Test Stand and re-use some of the facility. Disseminate some of our knowledge and experience in new directions.

Ion Source Status Work progressing to test source with independent control of Penning field. Investigation of optical techniques for beam analysis. LEBT Status Magnetic LEBT looking preferable to electrostatic. Beginning to run codes to look at beam envelopes.

RFQ Status Work is necessarily general until a firm frequency choice is made. Familiarisation with basic principles, comparisons of EM simulation codes. Chopper Status Fast pulser now meets design spec. into a dummy load. Work progressing on ‘slow’ chopper structure and pulser. Thermal analysis beginning.

Facility Status 2D and 3D layouts produced for building R8. Bid to CCLRC Infrastructure Fund for money to reconfigure R8. Diagnostics Status Diagnostics critical to purpose of FETS. Needs to be state of the art – quite a bit to do.

Other Status Code philosophy rationalised. Commercial tracking code (GPT) licensed. Have started to purchase hardware. FETS web home – Plans Make frequency choice. Start to finalise design parameters and detail design. Reconfigure R8 and install ion source/LEBT test stand.