Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Construction Engineering 221 Cost Estimating and Bidding II.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Pricing Subcontractors’ Work
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
The Risks and Rewards of Contractor Bids and Proposals.
1 The Profit and Loss Account Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Cost Estimating and Bidding.
IGCSE BUSINESS STUDIES
EM15 – Contractors COST MANAGEMENT
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Pricing Landscape Maintenance Work. Next Generation Science/Common Core Standards Addressed!  CCSS.Math. Content.7.R P.A.3 Use proportional relationships.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Entrepreneurial Mindset and Main Topics in a Sustainable Business Plan By Gonzalo Manchego Business Consultant.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Start up money Capital“money invested by the owners” - it can be a substantial amount - limited to personal wealth (Sole trader/partner) - LTD/PLC can.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Chapter 11 Subcontractor Work. Introduction Subcontractors perform 80% or more of the on-site work in residential construction. Often, the homebuilder.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
EXAMPLE – Quality Control Plan For Consultants
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Needles Powers Principles of Financial Accounting 12e Accounting for Merchandising Operations 6 C H A P T E R ©human/iStockphoto.
INTD 55 business practices charging for your services.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Pricing products Cost Behaviour 1.Direct Labour and Direct Materials are Variable Costs: – Expenses that tend to change in direct proportion to the volume.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
CONSTRUCTION CONTRACTS DOCUEMENTS
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Horticulture CD Unit C 4-4: Nursery, Landscaping, and Gardening.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Chapter 13 Estimates for Remodeling Work
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Award Management Services
Analyzing Transactions
Analyzing Transactions
Costs and Economics of Construction
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Cornerstones of Managerial Accounting, 6e
BUSINESS INCOME COVERAGE EXPENSE CHART
CIVL 493 CONSTRUCTION MANAGEMENT
Estimating – Overhead, Profit, Margins, & Markups workshop
ARCH 435 PROJECT MANAGEMENT
Construction Contracts
Analyzing Transactions
Presentation transcript:

Chapter 12 Estimate Summaries and Bids

Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating the sales price of a home –Providing a price breakdown for a purchaser –Preparing a bid price Examples of each are shown on the following slides.

Preparing a Bid Price To prepare an accurate, error-free bid, the estimating process has to be carefully planned and organized. The busiest period, and the period when the process is most error prone, is the last few hours before the final price is determined. Every task that can possibly be accomplished before bid-closing day has to be out of the way so that these last few hours can be devoted to completing the bid.

Bid Closing – The Advance Stage The following tasks should be completed at least two workdays before the day of the bid closing: –Complete takeoff, pricing, and the summary sheet, except for subtrades. –Calculate all required alternative prices relating to the builder's work. –Obtain bid bonds, and other documents required to accompany the bid. –Complete as much as possible of the bid forms. –Make duplicate copies of all bid documents for retention. –Prepare an envelope for delivery of bid documents. –Prepare a plan for the delivery of the bid. –Brief the office staff regarding their roles on bid-closing day. –Check all fax machines, computers, and telephones to ensure that they will be operational for closing day.

The Bid Form The bid form should contain certain basic information: –The name and address of the project –The identity of the owner –The identity of the bidding builder –A description of the work to be done –A list of the bid drawings and specifications –The bid price –The duration or completion date of the project –The signatures of the bidders, all duly witnessed –The time, date, and place of the bid

Alternate Prices and Allowances The builder may offer alternative prices that are quoted for proposed changes in the specifications. –For example, “If 26 oz. carpet is substituted for 32 oz. carpet, deduct $9, from our price.” The owner may require builders to include a sum of money (an allowance) in their bid to be expended on a specific work item. –For example, all bidders may be told to include $5,000 in their bid for light fittings. –Later, the owner will instruct the contractor they hire to use the allowance to buy the fittings they then specify.

Owner’s Bid Conditions Experienced developers often impose conditions to which bidders on their project are required to acknowledge and agree: –The bidder has examined all of the contract documents. –The bidder has inspected the site of the work. –The bidder agrees to provide all labor, materials, equipment, and any other requirements necessary to construct the complete project. –The bidder agrees to give the owner 30 days to consider the bid. –If the bidder, whose bid is accepted, fails to enter into a contract with the owner or fails to provide contract bonds, the bidder shall be liable to the owner.

The Builder’s Pre-bid Review The estimator, the chief estimator, and possibly other managers conduct a pre-bid review two workdays before the bid is due to be submitted. Topics discussed at the pre- bid review include: –The nature and scope of the project work –Construction methods proposed for the project –The proposed site supervisor –Labor resources required for the project –The equipment needs and availability –Prices used in the estimate –Project risks –The general expense requirements and prices –The response from subcontractors –The markup fee to be added to the estimate –Clarifications to be submitted with the bid

Bid Markup Project markup (or fee) has two components: company overheads and profit margin Company overheads include cost of: –Office premises including mortgage or rent costs –Office utilities –Office furnishings and equipment –Office maintenance and cleaning –Executive and office personnel salaries and benefits –Company travel and entertainment costs –Accounting and legal consultant's fees –Advertising –Business taxes and licenses –Interest and bank charges

Profit Margin Profit margin: the amount of money remaining after all project expenses and company expenses have been paid Two ways to assess profit: –A return on the investment What markup is needed to achieve the required return on the amount invested in the company? –Compensation for the risk assumed What level of markup is sufficient to compensate for this risk involved?

Bid Closing After the bid has been reviewed, the amount of fee set, the last steps are finalizing the subtrade prices and completing the bid documents. On a large project as many as 6 to 8 staff members may be required to complete the bid closing. Where the bid is to be hand delivered, the bid runner needs to be briefed and sent off in good time. A list of proposed subcontractors may have to be compiled and entered into the bid documents by the bid runner at the location of the bid closing. A breakdown of the bid price (similar to a summary) may also be required.

After the Bid is Submitted After the bid goes in, there are still questions to be addressed: –Was it low? –Was it high? –Was everything covered? –Were there any mistakes? The group of people who attended the pre-bid review should meet again for the post-bid review to consider these and any other questions arising from the bid.