Project 2014-03 Revisions to TOP-001-3 Third Posting Webinar October 2014.

Slides:



Advertisements
Similar presentations
ASTM OFFICERS CONFERENCE SUBCOMMITTEE CHAIRMENS DUTIES AND RESPONSIBILITIES.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Frequency Responsive Reserve Process Update
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
PER Outreach Presentation PER Ad Hoc Group PER Outreach Presentation March 15, 2013.
COM Operating Personnel Communications Protocols
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
VAR Outreach Presentation FRCC October 30, RELIABILITY | ACCOUNTABILITY2 NERC Antitrust Guidelines  It is NERC’s policy and practice to obey the.
Compliance Application Notice Process Update and Discussion with NERC MRC.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Evolving NERC Standards Processes and Practices Paradigm Shift.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Draft Reliability Standards Development Plan Ryan Stewart, NERC Manager of Standards Development Texas RE NSRS August 17, 2015.
Project – Alignment of Terms WECC Joint Meeting July 15, 2015.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Standards Review Subcommittee Update August 17, 2010.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Project Update TOP/IRO Reliability Standards NERC ORS May 6, 2014.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
North America Energy Standards Board Craig L. Williams, Specialist Ld.Sr. ISAS Meeting January 13, 2016 Phoenix, AZ W ESTERN E LECTRICITY C OORDINATING.
FRCC Regional Entity Webinar NERC Reliability Standard Development Projects and Situational Awareness and Event Analysis October 30, 2013, 1:00 p.m. –
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
RFC Webinar April 24, 2009 and May 1, 2009 Presented By: Mark Kuras Chair, Generator Verification SDT.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
System Restoration & Blackstart Standards Drafting Team Presentation to Texas RE Reliability Standards Committee March 4, 2009 Rick Terrill Confidential.
Project Standard Drafting Team (IRO SDT) Stephen Solis, IRO-SDT NSRS Meeting June 1, 2015.
Phase Angle Limitations
Rachel Coyne Manager, Reliability Standards Program
COM Operating Personnel Communications Protocols
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
CIIMS Proposal for TOP-003 Approach
Background (history, process to date) Status of CANs
GMD Data Request NERC Rules of Procedure Section 1600
Rates & Regulatory Updates
Workshop Session 1: Overview
Reliability Standards Development Plan
RTA TIG Agenda Date: Authors: March 2019
Coordinate Operations Standard
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Standards Development Process
WNG SC Agenda Date: Authors: March 2019 July 2013
WNG SC Agenda Date: Authors: November 2018 July 2013
WNG SC Agenda Date: Authors: March 2018 July 2013
North America Energy Standards Board
Standards Review Subcommittee Update
Presentation transcript:

Project Revisions to TOP Third Posting Webinar October 2014

RELIABILITY | ACCOUNTABILITY2 Objectives Background  Standard Drafting Team (SDT) Roster  Project History and Schedule  Project Inputs Second Posting Ballot Results Third Posting Details – TOP Questions and Answers Agenda

RELIABILITY | ACCOUNTABILITY3 NERC Antitrust Compliance Guidelines It is NERC’s policy and practice to obey the antitrust laws and to avoid all conduct that unreasonably restrains competition. This policy requires the avoidance of any conduct that violates, or that might appear to violate, the antitrust laws. Among other things, the antitrust laws forbid any agreement between or among competitors regarding prices, availability of service, product design, terms of sale, division of markets, allocation of customers or any other activity that unreasonably restrains competition. It is the responsibility of every NERC participant and employee who may in any way affect NERC’s compliance with the antitrust laws to carry out this commitment.

RELIABILITY | ACCOUNTABILITY4 Public Announcement Participants are reminded that this meeting is public. Notice of the meeting was posted on the NERC website and widely distributed. The notice included the number for dial-in participation. Participants should keep in mind that the audience may include members of the press and representatives of various governmental authorities, in addition to the expected participation by industry stakeholders.

RELIABILITY | ACCOUNTABILITY5 Objectives Present the changes in the third posting with emphasis on TOP Explain the SDT’s reasons for the changes Or, explain why the SDT didn’t make certain changes Continue outreach and education  If you have a group that you would like to make certain receives a presentation, let one of the SDT members know

RELIABILITY | ACCOUNTABILITY6

7 SDT Roster Dave Souder, PJM, Chair Andy Pankratz, FPL, Vice Chair David Bueche, Center Point Jim Case, Entergy Allen Klassen, Westar Bruce Larsen, WE Energies Jason Marshall, ACES Bert Peters, Arizona Public Service Robert Rhodes, SPP Kyle Russell, IESO Eric Senkowicz, FRCC Kevin Sherd, MISO

RELIABILITY | ACCOUNTABILITY8 Project History and Schedule April 16, 2013: Projects and submitted November 21, 2013: Both projects proposed for remand December 20, 2013: NERC asked FERC to postpone remand January 14, 2014: FERC agreed to postpone until January 31, 2015 February 12, 2014: Project started May 19, 2014 – July 2, 2014: First posting August 6, 2014 – September 19, 2014: Second Posting October x, 2014 – October y, 2014: Final ballot October x, 2014 – October y, 2014: Third posting of TOP November 12, 2014: Present to NERC Board of Trustees (Board) for approval January 31, 2015: submittal to FERC deadline

RELIABILITY | ACCOUNTABILITY9 Project Inputs Projects and  Standard Authorization Requests (SARs)  Directives and Issues FERC Notice of Proposed Rulemaking (NOPR) Independent Experts Report SW Outage Report Operating Committee Executive Committee Memo IRO Five-Year Review Technical Conferences  St. Louis, MO  Washington, DC  Sacramento, CA First and Second Posting Comments

RELIABILITY | ACCOUNTABILITY10

RELIABILITY | ACCOUNTABILITY11 Second Posting Ballot Results Standard1 st Ballot2 nd BallotFinal Ballot IRO %76.05%October IRO %74.05%October IRO %75.54%October IRO %84.21%October IRO %75.60%October IRO %78.40%October TOP %48.04%November TOP %78.77%October TOP %85.72%October Definitions62.64%93.04%October * Dr

RELIABILITY | ACCOUNTABILITY12

RELIABILITY | ACCOUNTABILITY13 Third Posting Details TOP Requirements R1 and R2: Deleted ‘Operations Planning’ from all time horizons dealing with Operating Instructions Operating Instructions are Real-time oriented Replaced ‘ensure’ with ‘address’ Entity can only address reliability issues, can’t guarantee reliability Restructured requirement wording for clarity Did not bring back Reliability Directive Definition was rejected in FERC NOPR Operating Instruction is approved terminology and capture’s SDT intent RSAW modified to address industry concern regarding increased compliance risk. Data Retention modified to address industry concern regarding administrative burden.

RELIABILITY | ACCOUNTABILITY14 Third Posting Details TOP Requirement R7: Capitalized ‘E’ in Emergency Uses defined term from Glossary Requirement R8: Deleted ‘other’ from ‘known other Transmission Operators’ Consistency with other requirements Wouldn’t be notifying itself so term is redundant

RELIABILITY | ACCOUNTABILITY15 Third Posting Details TOP Requirement R9: Deleted ‘NERC registered’ in front of ‘entities’ Consistent with other such deletions in second posting Added ‘sustained’ in front of ‘outages’ Not interested in momentary loss Combined ‘telemetering’ and ‘control’ equipment Consistent with Version 0 requirement language

RELIABILITY | ACCOUNTABILITY16 Third Posting Details TOP Requirement R10: Restructured to make clear what needs to be done internal versus neighboring TOP Areas Emphasized why this was being done – to determine SOL exceedances Changed ‘sub-100 kV’ to ‘non-BES’ for clarity of SDT’s intent Did not delete requirement for non-BES as this is required from FERC NOPR, IERP Report recommendations, and SW Outage Report recommendations

RELIABILITY | ACCOUNTABILITY17 Third Posting Details TOP Requirement R11:  Replaced ‘ensure’ with ‘in order for it to be able to’ perform its reliability functions  Can’t ensure reliability Requirement R13: Did not replace ‘ensure’ as term is correct here – entity must ensure Real- time Assessment is performed Did not change 30 minute timeframe as this is a FERC approved timeframe for Real-time Assessments Emphasized that an entity may have others perform the assessment

RELIABILITY | ACCOUNTABILITY18 Third Posting Details TOP Requirement R16: Replaced ‘Real-time Assessment’ with ‘analysis’ Need to consider all analyses such as Operational Planning Analysis Requirement R18: Deleted ‘Balancing Authority’ Balancing Authority not involved with SOLs

RELIABILITY | ACCOUNTABILITY19 Third Posting Details SDT made a good faith effort to address comments within constraints of project inputs Although 8 of 9 standards passed in second posting, all is dependent on TOP as standards are tightly intertwined and can’t be filed in pieces If TOP doesn’t pass, then all fail FERC remand kicks in if Project isn’t filed by January 31, 2015 Result would be specific directives from FERC on how to revise TOP and IRO standards

RELIABILITY | ACCOUNTABILITY20