The Model Validation Story 1. You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid.

Slides:



Advertisements
Similar presentations
Remedial Action Schemes Reliability Subcommittee
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
WECC JSIS Update Dmitry Kosterev, BPA.
Questions about AVR & PSS
MVWG Report to TSS August 2011
BPAs Generator Model Validation Technique/Tool MVWG Denver, CO May 18-19, 2009 Steve Yang Bonneville Power Administration.
Model Validation in Western Interconnection
JSIS Report to WECC PCC and OC
Using Synchrophasors for Preventing Cascading Outages
Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory.
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
Synchrophasors: Improving Reliability & Situational Awareness
Using Synchrophasor Data to Diagnose Equipment Mis-operations and Health Alison Silverstein WECC JSIS Meeting, September 10,
Introduction to Phasor Measurements Units (PMUs)
WECC Joint Synchronized Information Subcommittee
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
NASPI overview and update
Generator Governor Frequency Response Alert
NERC BAL Frequency Response Reliability Standard
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Wind Grid Codes GE Energy Asia Development Bank
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Review of BPA Voltage Control Conference
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Synchrophasor Measurement Implementation in ERCOT
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Alison Silverstein, NASPI Project Manager NERC Operating Committee
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Kirk Schneider American Electric Power Tulsa, Oklahoma AEIC Annual Load Research Conference Reno, Nevada September 10-13, 2006 System Load Calculation.
PRR835 – Reactive Power Capability Requirement
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
NASPI Update Alison Silverstein NASPI Project Manager WECC JSIS meeting, September 21,
Load Modeling for Dynamic Studies ROS Meeting – July 2005 ERCOT System Planning.
VRT Study Update José Conto ERCOT System Planning.
SRWG Meeting 15-2 Power Plant Validation Tools Eric Bakie July 2015.
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
PMUs for NERC Reliability Standards Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22, 2015.
Criticality and Risk of Large Cascading Blackouts Ian Dobson PSerc, ECE Dept., University of Wisconsin, Madison, WI Benjamin A. Carreras Oak Ridge National.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Minnesota Renewable Energy Integration and Transmission
Western Electricity Coordinating Council
Transmission Planning in ERCOT- Overview
The Model Validation Story
NERC Published Lessons Learned
Next Steps in Load Modeling
Grid Integration of Intermittent Resources
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Reliability Assessment Committee Reliability Workshop Priorities
Ruisheng Diao, Renke Huang, Pavel Etingov, Henry Huang PNNL
Renewable energy builds a more reliable and resilient electricity mix
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
Ruisheng Diao, Renke Huang, Pavel Etingov, Henry Huang PNNL
Reliability Assessment Committee Reliability Workshop Priorities
WECC Joint Synchronized Information Subcommittee
Donald Davies Chief Senior Engineer
Model Validation for Large Scale PV Plants
SRWG Meeting 15-2 Power Plant Validation Tools
Presentation transcript:

The Model Validation Story 1

You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid operations and planning WECC required generators to be tested for model validation after 1996 system outages WECC established a formal Generating Unit Model Validation Policy in 2006: Baseline model development, Periodic model validation NERC Reliability Standards MOD-026,-027: Developed from 2007 to 2013 In effect starting July 1, 2014

Regulatory Landscape MOD-032 require: Generator Owners to develop and provide accurate models to Transmission Planners MOD-025 require: Generator Owners to verify reactive power capabilities MOD-026, -027 require: Generator Owners to periodically validate generator excitation and governor models Transmission Planners verify model usability 3

(a) Baseline Model Development vs. (b) Disturbance-Based Model Validation vs. (c) Disturbance-Based Model Calibration 4

(a) Baseline Model Development 5 Equipment Model Verify model structure represents generating equipment Test model components, develop baseline data sets Disturbance data can be used complementary

(a) Baseline Model Development Test the limits and capability curves 6

(b) Disturbance-Based Model Validation PMU needs to be placed at Power Plant POI 7

(b) Disturbance-Based Model Validation Disturbance play-in capabilities are added to GE PSLF in G Power Plant G Controllable Voltage and Frequency Voltage and Frequency MWs and MVARs MODEL

(b) Disturbance-Based Model Validation BPA PPMV sequence of GE PSF EPCLs and MATLAB programs BPA-PNNL PPMV Stand-alone data management program Idaho Power Excel macro with PI data link and PSLF interfaces 9

(b) Disturbance-Based Model Validation BPA has PMU disturbance monitoring: -Conventional – -12 plants, -130 generators, -21,145 MW of generation -Wind – -11 plants -1,200 MW of generation -Review model performance annually 10

Success Stories – Plant A 11 BEFORE-2014AFTER-2015

Success Stories – Plant B 12 BEFORE-2014AFTER-2015

(c) Disturbance-Based Model Calibration Can PMU data be used for model calibration ? Disturbance-based model calibration – is NOT a replacement for baselining testing – can be used to complement baseline model development – requires engineering judgment – beware of curve fitting gymnastics 13

(c) Disturbance-Based Model Calibration EPRI Power Plant Parameter Derivation (PPPD) is most mature, a user group is established including about 30 participants Bernie University of Wisconsin uses a unique approach of pattern matching – which is useful to provide insight in model inaccuracies Others: – MATLAB – Idaho Power developed in-house optimizers – PNNL – Kalman filter – University of Texas – Particle Swarm Optimization – Georgia Tech – super-calibrator 14

Wind Power Plant Model Validation and Calibration 15

Wind Power Plant Model Validation BPA has nearly 4,900 MW of wind generation interconnected to its transmission system BPA prototyped PMU-based wind power plant validation set-up for multiple wind power plants BPA is collaborating with EPRI, UVIG, NREL research on wind power model validation using PMU data BPA implemented wind models in State Estimator 16

3. Wind Power Plant Model Validation 17

Plant Performance Monitoring 18

Going Beyond the Standards PMU monitoring provides detection of generator abnormalities 19 Unexpected action from plant controller Abnormal runback in reactive power PSS failure

Publications DOE Report on Model Validation CIGRE Tutorial CIGRE Paper IEEE Magazine paper ERCOT Technical Conference NASPI Meetings 20