Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.

Slides:



Advertisements
Similar presentations
Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Advertisements

Click on this image to open the full PDF document.
1640 Pivot Drive Value Engineering 22 November, 2010.
Advisors: Dr. Fletcher Miller Dr. Arlon Hunt Daniel Cassinis Chris Renner May 5, 2009 Sponsor: Google.org Who We Are.
Vertical-Axis Wind Turbine Kang Zheng Aaron Peterson Mohd Ramjis.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
D. Peterson, “LC-TPC LP endplate”, LC-TPC group meeting at ALCPG07, 21-October Discussion for the LP endplate See also:
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Steel Pipe Plumbing Systems
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Alpha Prototype Presentation Nov 4, Today’s Presentation: System Schematic Review Materials Analysis Materials Processing Tube Fabrication Joints.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Unit 91 Week 7 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt October 1, 2008 Final Presentation.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
CLAS12 Drift Chamber Prototyping
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
LARP Collaboration Meeting Racetrack Coil Fabrication
Straw-tubes We have made 4 out of 16 endplate pieces, and checked their accuracy. We have purchased cm diameter straw tubes. We are getting glue.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
Eric McDonald Drew Krutak Jeremy Hanneman. Our objective was to design and fabricate a High-Speed Treadmill that is capable of measuring the horizontal.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Welcome! Drafting 2345: Advanced Pipe Drafting Andrew Amini Full Time Instructor, HCC.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Camera Motion System Requirement Design Details FEA.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
Warm Vessel Leveling Islands (Piers)
Discussion for the LP endplate
Framing Agriculture Structures
Escalator Installation
CDC Prototype Development: An Update
Status of straw production straw module assembling
Llea Nasira Samuel Benedict College Charlotte Wood-Harrington
Structure and etc Shoji Uno (KEK) at B2GM
Welcome! Drafting 2345: Advanced Pipe Drafting
Industrial Skills Fasteners & Hardware.
Far Detector Activities Late 2017 – Early 2018
WLS FIBER-SCINTILLATOR GLUING UPDATE
Framing Agriculture Structures
Gas Monitoring Chamber Production Status
FRACTIONAL ARC TEST GIRDER DESIGN REVIEW
Welcome! Drafting 2323: Pipe Drafting
Limited Streamer Tube Project Summary
Whipstock. AGENDA DefinitionComponents Operation Sequence 2.
Presentation transcript:

Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration Meeting

Outline of the Talk Work Done to Date Current Work Future Plans  Gas simulations, endplate production, etc  Straws, feed-through system, glue tests, stringing  Electronics, DAQ, prototype testing…

Built Gas Mixing System Matches JLAB equipment Completed June ‘02 Can mix up to three gases

Garfield Gas Simulations Lorentz Angle vs. Drift Time Note 62 -Completed Nov. ‘02

Studies of BNL Chamber Completed Dec. ’02 Note 54 Studied performance of chamber with cosmics and Ru 106 Studied position dependence Studied coincidence between tubes Note: Very Leaky! Dissection to analyze construction methods

Prototype Endplates ¼ endplates machined + checked at JLAB Completed June ‘03Note 61 Final Accomplishment: Successfully closed out a JLAB R+D account 2-3 man months set-up and machining Straight and Stereo layers

Current Work Since May of ‘03 Goal: Build a prototype full scale ¼ chamber at CMU

Issues with Straw Tubes Straw Tube vendors Vendors differ widely in price and service Shipping of Tubes On preliminary order, as many as ¾ of the tubes, not usable How do you cut a 4 mil walled straw tube? 12,000RPM with a 10 mil blade

Issues with Straw Tube Chambers They leak! Look for design that allows for gas-tight system System design and product testing  Epoxy testing Determine methods of containing leaks that do exist

Epoxy Testing Two important criteria: Gas-tight seal Electrical conductivity Used a known non-conductive epoxy as baseline: 3M Scotch-Weld 2216 Two candidates, to date might use both  Resin-Tech TIGA 920-H  Tra-Con 2907 Pressure Gauges Fill Valve Held 2.5 PSI for several weeks

Feed-Through System Two main components: Donuts  Inserted in end of straw tube  Hole and V-notch allow injection of epoxy Tube

Feed-Through  Inserted through endplate and captures donut Feed-Through System II  Chamfer allows space for glue

Gas Flow System Towards Gas-Tight goal Learned a lot from BNL chamber – minimize leaks Plenum Design  Plexiglas plenum covers  Stand-offs  Electronics? Gas Seal

Stringing Method Axle system for stringing Tension cables prevent bowing Whole chamber rotates on axis  Hook + Swivel  Ball Joint + Base Plate Note: We are building stringing apparatus for actual full size chamber!

Sliding Collars Allow for capture of inner radius of endplates Lower collar bolted to axle for strength Upper collar allowed to slide capture, set screwed in

Hook + Swivel Joint Allows for rotation of chamber Allows for use of crane/winch Steel plug inserted into aluminum axle This steel plug will also be the anchor point for tension cable/rods  Mobility

Ball Joint + Base Plate Steel Plug inserted into aluminum axle Captures the bottom of axle Allows for rotation and more!  Stereo layers Base Plate will bolt to floor

The Axle Length :10 feet Radius: 5.5 inch OD Wall Thickness: ½ inch Maximal Deflection for 600lb chamber: 1.6 mm Weight: 93 lbs Specifications: Limiting factor: ability to machine the axle

Future Work 1.Actual Manufacture of required pieces 2.Electronics: PC-Boards and Pre-Amps 3.Setting up DAQ 4.Upon completion of prototype, testing will be needed Donuts, Feed-Throughs, sliding collars, ~50 tube prototype

Conclusion Work Done to Date Current Work Future Plans  Gas simulations, endplate production, etc  Straws, feed-through system, glue tests, stringing  Electronics, DAQ, prototype testing…