Overview of Proposed Remedial Actions to be Completed by Waste Management of Connecticut Meadow Street Parcels Norwalk, Connecticut.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

ODOT's Environmental Site Assessment Process
Dion Novak, EPA Region 5 RPM
Chapter Eight: Mapping Earth
Phase I Environmental Site Assessment
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Private Boat Ramp Permit Application Harold Mills District 1 September 23, 2014 Environmental Protection Division Environmental Protection Division.
J-Field Edgewood Aberdeen Proving Ground. Description From 1940 to 1970s, the Army disposed of chemical agents, high explosives and chemical wastes. APG.
Public Draft Removal Action Workplan Proposed Richmond Bay Campus Site RES Area and Groundwater Public Meeting December 5, © keh.
California EPA Dept. of Toxic Substances Control Brownfields & Environmental Restoration Program Sam V. Martinez, Jr.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Partnerships and Processes Landfill Redevelopment.
SRI Webinar September 30,  Purpose of Pre-Feasibility Study  Site Background  Regional Context  Site Reuse Goals  Renewable Energy Assessment.
Board of County Commissioners
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Shoreline Alteration/Dredge & Fill Permit Taylor Morrison of Florida, Inc. District 1 March 10, 2015 Environmental Protection Division Environmental Protection.
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI Aerial Photos Taken April 1, 2009 By.
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
Utility Extension Project
University of Waterloo Library : Geospatial and Map Resources Earth 231.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Tasks in Step Two: Assess Hazard Vulnerability Session Name: Hazard Mitigation Planning II Coastal Hazards Management Course 2.1 Describe the community.
Permit Request for Boat Ramp Facility and Conservation Area Impact Keene’s Pointe Community Association District 1 January 26, 2010 Environmental Protection.
Capital Improvement Plan Workshop May 27, Capital Improvement Plan (CIP) Tool used to develop a five year timeline for scheduling necessary improvements.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
 EPA’s soil sampling objectives  Technical approach  Technical assistance to DTSC/DOE  Next Steps and Schedule.
Landia Superfund Site: Green Remediation and Green Infrastructure Support Sustainable Development Douglas Reid-Green, BASF Corporation.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
P:\LE Mason\Hyde Park\final06\presentations\ PIP Meeting.ppt 1 Public Involvement Plan Meeting Former L.E. Mason Property 98 Business Street Hyde.
PROPERTY INSPECTION AND ANALYSIS: THE SITE Chapter 6.
ZOM Major Amendment to Arbor Greens PD. Overview Arbor Greens PD site +/- 152 ac Amendment request summary –Extension of buildout date from 2014.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Assistant Chief of Staff for Installation Management Recent Successes 1 Environmental Remediation –Approximately $1B of environmental remediation remains.
CHEMICAL COMMODITIES INC. The History, Cleanup and Ecological Reuse of a Superfund Site 1.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
C&DD Facility Closure/Post-Closure Cost Estimation & the role of Environmental Covenants Ohio’s Solid Waste and C&DD Program Annual Meeting May 9 th, 2013.
Public Hearings June 16, Case: PSP Project: Reams Road Parcel Commercial PSP Applicant: Constance A. Owens, Tri3 Civil engineering Design.
Public Hearings August 4, Case: PSP Project: Village F Master PD / Parcels S-1 & S-2 – Panther View PSP Applicant: Scott Stearns, Dewberry.
Environmental Insurance: Strategic Considerations NAREIM Architectural & Engineering Council Meeting Las Colinas, TX September 26, 2012 Peter A. Nyquist.
Geol 465- Intro to GIS Geographic Information Systems Geol 465- Intro to GIS Geographic Information Systems.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Island County Geodetic Control & Aerial Imagery Project March 2007.
Chicago Heights Brownfield Sergio,Tierria. Property Names and Aliases 14thst.Lincoln Hwy Southside Lowe to Wallace E.14 th st., Chicago Heights,IL.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
© AEHS, Inc. 1 Environmental Support.
Boat Ramp Permit Application Michael Dinkel District 1 January 7, 2014 Environmental Protection Division Environmental Protection Division.
After-the-fact Private Boat Ramp Facility Permit Application Robert Scott Popwell District 1 June 30, 2015 Environmental Protection Division Environmental.
Public Hearings January 26, Case: CDR Project: Lakeside Village Center South PD / LUP Applicant: Dennis Seliga, Boyd Development Corporation.
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
Shoreline Alteration/Dredge and Fill Permit Application John W. Holloway Life Estate Environmental Protection Division February 9, 2016.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
The Voluntary Investigation and Cleanup Program Investing in the environment and your economic future Gerald Stahnke, VIC Program Project Manager Minnesota.
County Initiated Comprehensive Plan Amendment CPA To the Future Land Use Map 2020.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
TYING TOGETHER BASE RE- USE AND BROWNFIELD REDEVELOPMENT INSURANCE PRODUCTS Presented by: Richard O. Wagner November 14, 2006.
How a topographical map is made.
4 Starting Tips to Keep Your Car in Top Condition
Redevelopment Authority of the County of Washington O
Sample Eastern Sustainable Development Project
Hire Toyota Innova in Delhi for Outstation Tour
Working Group “Environmental Expenditure Statistics” Preliminary results from the Joint Questionnaire 2006 on Environmental Protection Expenditure.
Rulemaking and Readoption of 15A NCAC 02T .1500
Photographer’s Name Here
ચાલો માટી વિશે જાણીએ All About Soil.
VLEACH Case Study Soil Contamination with trichlorethylene (TCE) at the Chase Brass Site - Ohio 1/14/2019.
Thing / Person:____________________ Dates:_________________
Environmental Protection Division
Environmental Protection Division
Presentation transcript:

Overview of Proposed Remedial Actions to be Completed by Waste Management of Connecticut Meadow Street Parcels Norwalk, Connecticut

Parcel Locations and Current Use

Former Scrap Iron Operations 36 Meadow Street Former Manufacturers & 120 Meadow Street Former Auto Salvage 8-18 Meadow Street Undeveloped Marsh (Filled) 30B Meadow Street 1895 Topographic Map Retrieved from the Connecticut State Library N 1895 Topographic Map

1975 Aerial Photograph Former Scrap Iron Operations 36 Meadow Street Former Manufacturers & 120 Meadow Street Former Auto Salvage 8-18 Meadow Street Undeveloped Marsh (Filled) 30B Meadow Street N 1975 Aerial Photograph Retrieved from the Connecticut State Library

30B Meadow Street

30B Meadow Street Remedial Plan

8-18 Meadow Street

8-18 Meadow Street Remedial Plan

30-32 & 120 Meadow Street

30-32 & 120 Meadow Street Remedial Plan

36 Meadow Street

36 Meadow Street Remedial Plan

Estimated Schedule Summer/Fall Soil Excavation & Soil Capping (date contingent on EPA Approval) -36 Meadow Street Soil Excavation 2014 Deed Restrictions