Pesquisa Operacional Aplicada à Logística Prof

Slides:



Advertisements
Similar presentations
Network Models Chapter 11
Advertisements

Multicriteria Decision-Making Models
Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
February 21, 2002 Simplex Method Continued
Tuesday, May 7 Integer Programming Formulations Handouts: Lecture Notes.
Network Models Robert Zimmer Room 6, 25 St James.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
1 Outline relationship among topics secrets LP with upper bounds by Simplex method basic feasible solution (BFS) by Simplex method for bounded variables.
Slides prepared by JOHN LOUCKS St. Edward’s University.
Lecture 2 A Telephone Staffing Problem
1 Column Generation. 2 Outline trim loss problem different formulations column generation the trim loss problem master problem and subproblem in column.
1 Chapter 10 Multicriteria Decision-Marking Models.
PP Test Review Sections 6-1 to 6-6
LP Formulation Practice Set 1
Copyright © Cengage Learning. All rights reserved.
An Application of Linear Programming Lesson 12 The Transportation Model.
Cost-Volume-Profit Relationships
MCQ Chapter 07.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 5 Capacity Planning For Products and Services
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
Linear Programming, A Geometric Approach
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Chapter 10, Part B Distribution and Network Models
Example of a Decision Tree Problem: The Payoff Table
Thank you and welcome Linear Programming (LP) Modeling Application in manufacturing And marketing By M. Dadfar, PhD.
4. Inequalities. 4.1 Solving Linear Inequalities Problem Basic fee: $20 Basic fee: $20 Per minute: 5¢ Per minute: 5¢ Budget: $40 Budget: $40 How many.
23-8 3x6 Double it Take Away 6 Share By 9 Double it +10 Halve it Beginner Start Answer Intermediate 70 50% of this ÷7÷7 x8 Double it Start Answer.
Perfect Competition.
Equal or Not. Equal or Not
Pesquisa Operacional Exemplo de Análise de Sensibilidade no Solver.
12 System of Linear Equations Case Study
IEOR 4004 Midterm Review (part I)
Firms in Competitive Markets
Introduction to Management Science
Transportation Problem
Production Mix Problem Graphical Solution med lrg Electronics Cabinetry Profit (10,20) (Optimal Product Mix!) Profit.
Multiplication Facts Practice
BA 555 Practical Business Analysis
Chapter 8: The Solver and Mathematical Programming Spreadsheet-Based Decision Support Systems Prof. Name Position (123) University.
Graeme Henchel Multiples Graeme Henchel
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
Linear Programming Models & Case Studies
1 1 Slides by John Loucks St. Edward’s University Modifications by A. Asef-Vaziri.
Chapter 10, Part A Distribution and Network Models
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Transportation, Assignment, and Transshipment Problems
Transportation, Transshipment and Assignment Models and Assignment Models.
6-1 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Transportation, Transshipment, and Assignment Problems Chapter 6.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Chapter 4 Network Models.
1 Network Models Chapter Introduction A network problem is one that can be represented by... Nodes Arcs Function on Arcs.
1Transportation ModelsLesson 4 LECTURE FOUR Transportation Models.
1 Lecture 3 MGMT 650 Sensitivity Analysis in LP Chapter 3.
Managerial Decision Modeling with Spreadsheets
Transportation, Transshipment and Assignment Models
Chapter 7 Transportation, Assignment & Transshipment Problems Part 1 ISE204/IE252 Prof. Dr. Arslan M. ÖRNEK.
Kerimcan OzcanMNGT 379 Operations Research1 Transportation, Assignment, and Transshipment Problems Chapter 7.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Network Models Tran Van Hoai Faculty of Computer Science & Engineering HCMC University of Technology Tran Van Hoai.
The Supply Chain Customer Supplier Manufacturer Distributor
Mathematical Modeling Tran, Van Hoai Faculty of Computer Science & Engineering HCMC University of Technology Tran Van Hoai.
Chapter 7 Transportation, Assignment, and Transshipment Problems
Arben Asllani University of Tennessee at Chattanooga Prescriptive Analytics CHAPTER 7 Business Analytics with Shipment Models Business Analytics with Management.
DISTRIBUTION AND NETWORK MODELS (1/2)
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Transportation, Assignment, and Transshipment Problems Pertemuan 7 Matakuliah: K0442-Metode Kuantitatif Tahun: 2009.
A network problem is one that can be represented by...
Presentation transcript:

Pesquisa Operacional Aplicada à Logística Prof Pesquisa Operacional Aplicada à Logística Prof. Fernando Augusto Silva Marins fmarins@feg.unesp.br www.feg.unesp.br/~fmarins

Introdução à Pesquisa Operacional (P.O.) Sumário Introdução à Pesquisa Operacional (P.O.) Impacto da P.O. na Logística Modelagem e Softwares Exemplos Cases em Logística

Pesquisa Operacional (P.O.) Operations Research Operational Research Management Sciences

A P.O. e o Processo de Tomada de Decisão   Tomar decisões é uma tarefa básica da gestão. Decidir: optar entre alternativas viáveis. Papel do Decisor: Identificar e Definir o Problema Formular objetivo (s) Analisar Limitações Avaliar Alternativas  Escolher a “melhor”

  PROCESSO DE DECISÃO Abordagem Qualitativa: Problemas simples e experiência do decisor Abordagem Quantitativa: Problemas complexos, ótica científica e uso de métodos quantitativos.

Pesquisa Operacional faz diferença no desempenho de organizações? 6

Resultados - Finalistas do Prêmio Edelman INFORMS 2007 7

FINALISTAS EDELMAN 1984-2007 8

FINALISTAS EDELMAN 1984-2007 9

Como construir Modelos Matemáticos?

Classification of Mathematical Models Classification by the model purpose Optimization models Prediction models Classification by the degree of certainty of the data in the model Deterministic models Probabilistic (stochastic) models

Mathematical Modeling A constrained mathematical model consists of An objective: Function to be optimised with one or more Control /Decision Variables Example: Max 2x – 3y; Min x + y One or more constraints: Functions (“£”, “³”, “=”) with one or more Control /Decision Variables Examples: 3x + y £ 100; x - 4y ³ 100; x + y = 10;

New Office Furniture Example Raw Steel Used 7 pounds (2.61 kg.) 3 pounds (1.12 kg.) 1.5 pounds (0.56 kg.) Products Desks Chairs Molded Steel Profit $50 $30 $6 / pound 1 pound (troy) = 0.373242 kg.

Defining Control/Decision Variables Ask, “Does the decision maker have the authority to decide the numerical value (amount) of the item?” If the answer “yes” it is a control/decision variable. By very precise in the units (and if appropriate, the time frame) of each decision variable. D: amount of desks (number) C: amount of chairs (number) M: amount of molded steel (pound)

Objective Function The objective of all optimization models, is to figure out how to do the best you can with what you’ve got. “The best you can” implies maximizing something (profit, efficiency...) or minimizing something (cost, time...). Total Profit = 50 D + 30 C + 6 M Products Desks Chairs Molded Steel Profit $50 $30 $6 / pound D: amount of desks (number) C: amount of chairs (number) M: amount of molded steel (pound)

Writing Constraints Create a limiting condition for each scarce resource : (amount of a resource required) (“£”, “³”, “=”) (resource availability) Make sure the units on the left side of the relation are the same as those on the right side. Use mathematical notation with known or estimated values for the parameters and the previously defined symbols for the decision/control variables. Rewrite the constraint, if necessary, so that all terms involving the decision variables are on the left side of the relationship, with only a constant value on the right side

New Office Furniture Example If New Office has only 2000 pounds (746.5 kg) of raw steel available for production. £ 7 D + 3 C + 1.5 M 2000 Products Desks Chairs Molded Steel Raw Steel Used 7 pounds (2.61 kg.) 3 pounds (1.12 kg.) 1.5 pounds (0.56 kg.) D: amount of desks (number) C: amount of chairs (number) M: amount of molded steel (pound)

Writing Constraints Special constraints or Variable Constraint Non negativity constraint Lower bound constraint Upper bound constraint Integer constraint Binary constraint Mathematical Expression X ³ 0 X ³ L (number  0) X £ U (number  0) X = integer  {0, 1, 2, 3, 4 ,…} X = 0 or 1

New Office Furniture Example No production can be negative; D ³ 0, C ³ 0, M ³ 0 To satisfy contract commitments; at least 100 desks, and due to the availability of seat cushions, no more than 500 chairs must be produced. Quantities of desks and chairs produced during the production must be integer valued. D ³ 100, C £ 500 D, C integers

Example Mathematical Model MAXIMIZE Z = 50 D + 30 C + 6 M (Total Profit) SUBJECT TO: 7 D + 3 C + 1.5 M £ 2000 (Raw Steel) D ³ 100 (Contract) C £ 500 (Cushions) D ³ 0, C ³ 0, M ³ 0 (Nonnegativity) D and C are integers Best or Optimal Solution: 100 Desks, 433 Chairs, 0.67 pounds Molded Steel Total Profit: $17,994 Ver Modelo no Lindo

Delta Hardware Stores Problem Statement Delta Hardware Stores is a regional retailer with warehouses in three cities in California San Jose Fresno Azusa

Delta Hardware Stores Problem Statement Each month, Delta restocks its warehouses with its own brand of paint. Delta has its own paint manufacturing plant in Phoenix, Arizona. San Jose Fresno Phoenix Azusa

Delta Hardware Stores Problem Statement Although the plant’s production capacity is sometime inefficient to meet monthly demand, a recent feasibility study commissioned by Delta found that it was not cost effective to expand production capacity at this time. To meet demand, Delta subcontracts with a national paint manufacturer to produce paint under the Delta label and deliver it (at a higher cost) to any of its three California warehouses.

Delta Hardware Stores Problem Statement Given that there is to be no expansion of plant capacity, the problem is to determine a least cost distribution scheme of paint produced at its manufacturing plant and shipments from the subcontractor to meet the demands of its California warehouses.

Delta Hardware Stores Variable Definition Decision maker has no control over demand, production capacities, or unit costs. The decision maker is simply being asked, “How much paint should be shipped this month (note the time frame) from the plant in Phoenix to San Jose, Fresno, and Asuza” and “How much extra should be purchased from the subcontractor and sent to each of the three cities to satisfy their orders?”

Decision/Control Variables X1 : amount of paint shipped this month from Phoenix to San Jose X2 : amount of paint shipped this month from Phoenix to Fresno X3 : amount of paint shipped this month from Phoenix to Azusa X4 : amount of paint subcontracted this month for San Jose X5 : amount of paint subcontracted this month for Fresno X6 : amount of paint subcontracted this month for Azusa

Network Model and Decision Variables National Subcontractor X4 San Jose X5 X6 Fresno X2 X1 X3 Azusa Phoenix

Model Structure The objective is to minimize the total overall monthly costs of manufacturing, transporting and subcontracting paint, The constraints are (subject to): The Phoenix plant cannot operate beyond its capacity; The amount ordered from subcontractor cannot exceed a maximum limit; The orders for paint at each warehouse will be fulfilled.

Costs To determine the overall costs: The manufacturing cost per 1000 gallons of paint at the plant in Phoenix - (M) The procurement cost per 1000 gallons of paint from National Subcontractor - (C) The respective truckload shipping costs form Phoenix to San Jose, Fresno, and Azusa - (T1, T2, T3) The fixed purchase cost per 1000 gallons from the subcontractor to San Jose, Fresno, and Azusa (S1, S2, S3)

Objective Function MINIMIZE (M + T1) X1 + (M + T2) X2 + (M + T3) X3 + (C + S1) X4 + (C + S2) X5 + (C + S3) X6 Where: Manufacturing cost at the plant in Phoenix: M Procurement cost from National Subcontractor: C Truckload shipping costs from Phoenix to San Jose, Fresno, and Azusa: T1, T2, T3 Fixed purchase cost from the subcontractor to San Jose, Fresno, and Azusa: S1, S2, S3 X1 : amount of paint shipped this month from Phoenix to San Jose X2 : amount of paint shipped this month from Phoenix to Fresno X3 : amount of paint shipped this month from Phoenix to Azusa X4 : amount of paint subcontracted this month for San Jose X5 : amount of paint subcontracted this month for Fresno X6 : amount of paint subcontracted this month for Azusa

Constraints To write to constraints, we need to know: The capacity of the Phoenix plant (Q1) The maximum number of gallons available from the subcontractor (Q2) The respective orders for paint at the warehouses in San Jose, Fresno, and Azusa (R1, R2, R3)

Constraints (Cont.) The number of truckloads shipped out from Phoenix cannot exceed the plant capacity: X1 + X2 + X3 £ Q1 The number of thousands of gallons ordered from the subcontrator cannot exceed the order limit: X4 + X5 + X6 £ Q2 The number of thousands of gallons received at each warehouse equals the total orders of the warehouse: X1 + X4 = R1 X2 + X5 = R2 X3 + X6 = R3 All shipments must be nonnegative and integer: X1, X2, X3, X4, X5, X6 ³ 0 X1, X2, X3, X4, X5, X6 integer

Data Collection and Model Selection Respective Orders: R1 = 4000, R2 = 2000, R3 = 5000 (gallons) Capacity: Q1 = 8000, Q2 = 5000 (gallons) Subcontractor price per 1000 gallons: C = $5000 Cost of production per 1000 gallons: M = $3000

Data Collection and Model Selection (Cont.) Transportation costs per 1000 gallons Subcontractor: S1 = $1200; S2 = $1400; S3 = $1100 Phoenix Plant: T1 = $1050; T2 = $750; T3 = $650

Delta Hardware Stores Operations Research Model Min (3000+1050)X1+(3000+750)X2+(3000+650)X3+(5000+1200)X4+(5000+1400)X5+(5000+1100)X6 Ou MIN 4050 X1 + 3750 X2 + 3650 X3 + 6200 X4 + 6400 X5 + 6100 X6 SUBJECT TO: X1 + X2 + X3 £ 8000 (Plant Capacity) X4 + X5 + X6 £ 5000 (Upper Bound - order from subcontracted) X1 + X4 = 4000 (Demand in San Jose) X2 + X5 = 2000 (Demand in Fresno) X3 + X6 = 5000 (Demand in Azusa) X1, X2, X3, X4, X5, X6 ³ 0 (non negativity) X1, X2, X3, X4, X5, X6 integer

Delta Hardware Stores Solutions X1 = 1,000 gallons X2 = 2,000 gallons X3 = 5,000 gallons X4 = 3,000 gallons X5 = 0 X6 = 0 Cost = $48,400 Ver Modelo no Excel

CARLTON PHARMACEUTICALS Carlton Pharmaceuticals supplies drugs and other medical supplies. It has three plants in: Cleveland, Detroit, Greensboro. It has four distribution centers in: Boston, Richmond, Atlanta, St. Louis. Management at Carlton would like to ship cases of a certain vaccine as economically as possible.

CARLTON PHARMACEUTICALS Data Unit shipping cost, supply, and demand Assumptions Unit shipping costs are constant. All the shipping occurs simultaneously. The only transportation considered is between sources and destinations. Total supply equals total demand. To From Boston Richmond Atlanta St. Louis Supply Cleveland $35 30 40 32 1200 Detroit 37 40 42 25 1000 Greensboro 40 15 20 28 800 Demand 1100 400 750 750

CARLTON PHARMACEUTICALS Network presentation Boston Richmond Atlanta St.Louis Destinations Sources Cleveland Detroit Greensboro D1=1100 37 40 42 32 35 30 25 15 20 28 S1=1200 S2=1000 S3= 800 D2=400 D3=750 D4=750

CARLTON PHARMACEUTICALS – Linear Programming Model The structure of the model is: Decision variables Xij = the number of cases shipped from plant i to warehouse j. where: i=1 (Cleveland), 2 (Detroit), 3 (Greensboro) j=1 (Boston), 2 (Richmond), 3 (Atlanta), 4(St.Louis) Minimize Total Shipping Cost ST [Amount shipped from a source] £ [Supply at that source] [Amount received at a destination] = [Demand at that destination]

Supply constraints Boston Cleveland Richmond Detroit Atlanta St.Louis X11 X12 X13 X14 Supply from Cleveland X11+X12+X13+X14  1200 Supply constraints Detroit S2=1000 X21 X22 X23 X24 Supply from Detroit X21+X22+X23+X24  1000 Boston Greensboro S3= 800 X31 X32 X33 X34 Supply from Greensboro X31+X32+X33+X34  800 D1=1100 Richmond D2=400 Atlanta D3=750 St.Louis D4=750

CARLTON PHARMACEUTICAL – The complete mathematical model Min 35X11+30X12+40X13+ 32X14 +37X21+40X22+42X23+25X24+ 40X31+15X32+20X33+38X34 Total shipment out of a supply node cannot exceed the supply at the node. ST Supply constraints: X11+ X12+ X13+ X14 £ = 1200 X21+ X22+ X23+ X24 1000 X31+ X32+ X33+ X34 800 Total shipment received at a destination node, must equal the demand at that node. Demand constraints: X11+ X21+ X31 1100 X12+ X22+ X32 400 X13+ X23+ X33 750 X14+ X24+ X34 750 All Xij are nonnegative

CARLTON PHARMACEUTICALS Spreadsheet =SUMPRODUCT(B7:E9,B15:E17) =SUM(B7:E7) Drag to cells G8:G9 =SUM(B7:E9) Drag to cells C11:E11

CARLTON PHARMACEUTICALS Spreadsheet MINIMIZE Total Cost SHIPMENTS Demands are met Supplies are not exceeded

CARLTON PHARMACEUTICALS Spreadsheet - solution

CARLTON PHARMACEUTICALS - Sensitivity Report Reduced costs The unit shipment cost between Cleveland and Atlanta must be reduced by at least $5, before it would become economically feasible to utilize it If this route is used, the total cost will increase by $5 for each case shipped between the two cities.

CARLTON PHARMACEUTICALS - Sensitivity Report Allowable Increase/Decrease This is the range of optimality. The unit shipment cost between Cleveland and Boston may increase up to $2 or decrease up to $5 with no change in the current optimal transportation plan.

CARLTON PHARMACEUTICALS Sensitivity Report Shadow prices For the plants, shadow prices convey the cost savings realized for each extra case of vaccine produced. For each additional unit available in Cleveland the total cost reduces by $2. CARLTON PHARMACEUTICALS Sensitivity Report

CARLTON PHARMACEUTICALS Sensitivity Report Shadow prices For the warehouses demand, shadow prices represent the cost savings for less cases being demanded. For each one unit decrease in demanded in Richmond, the total cost decreases by $32. CARLTON PHARMACEUTICALS Sensitivity Report Allowable Increase/Decrease This is the range of feasibility. The total supply in Cleveland may increase up to $250, but doesn´t may decrease up, with no change in the current optimal transportation plan.

Modifications to the transportation problem Cases may arise that require modifications to the basic model. Blocked routes - shipments along certain routes are prohibited. Remedies: Assign a large objective coefficient to the route (Cij = 1,000,000)

Modifications to the transportation problem Cases may arise that require modifications to the basic model. Blocked routes - shipments along certain routes are prohibited. Remedies: Assign a large objective coefficient to the blocked route (like as Cij = 1,000,000) Add a constraint to Excel solver of the form Xij = 0 Shipments on a Blocked Route = 0

Modifications to the transportation problem Only Feasible Routes Included in Changing Cells Cell C9 is NOT Included Modifications to the transportation problem Cases may arise that require modifications to the basic model. Blocked routes - shipments along certain routes are prohibited. Remedies: Assign a large objective coefficient to the route (Cij = 1,000,000) Add a constraint to Excel solver of the form Xij = 0 Do not include the cell representing the rout in the Changing cells Shipments from Greensboro to Cleveland are prohibited

Modifications to the transportation problem Cases may arise that require modifications to the basic model. Minimum shipment - the amount shipped along a certain route must not fall below a pre-specified level. Maximum shipment - an upper limit is placed on the amount shipped along a certain route. Remedy: Add a constraint to Excel of the form Xij ³ B. Remedy: Add a constraint to Excel of the form Xij £ B.

The Capacitated Transshipment Model Sometimes shipments to destination nodes are made through transshipment nodes. Transshipment nodes may be Independent intermediate nodes with no supply or demand Supply or destination points themselves. Transportation on arcs may be bounded by given bounds

The Capacitated Transshipment Model The Linear Programming Model of this problem consists of: Flow on arcs decision variables Cost minimization objective function Balance constraints on each node as follows: Supply node – net flow out does not exceed the supply Intermediate node – flow into the node is equal to the flow out Demand node – net flow into the node is equal to the demand Bound constraints on each arc. Flow cannot exceed the capacity on the arc

DEPOT MAX A General Network Problem Depot Max has six stores located in the Washington D.C. area.

DEPOT MAX The stores in Falls Church (FC) and Bethesda (BA) are running low on the model 5A Arcadia workstation. DATA: -12 5 FC -13 6 BA

DEPOT MAX The stores in Alexandria (AA) and Chevy Chase (CC) have an access of 25 units. DATA: -12 +10 1 5 FC AA -13 +17 2 6 BA CC

DEPOT MAX The stores in Fairfax and Georgetown are transshipment nodes with no access supply or demand of their own. DATA: -12 FX +10 1 3 5 FC AA Depot Max wishes to transport the available workstations to FC and BA at minimum total cost. GN -13 +17 2 4 6 BA CC

DEPOT MAX Data There is a maximum limit for quantities shipped on various routes. There are different unit transportation costs for different routes.

DEPOT MAX The possible routes and the maximum flow limits are shown. DATA: 6 -12 FX 10 8 +10 1 3 FC FC AA 3 7 8 5 7 GN -13 +17 2 4 BA BA 10 17 CC

DEPOT MAX The possible routes and the shipping unit costs are shown. DATA: 20 -12 FX 10 7 +10 1 3 FC FC AA 5 6 12 11 7 GN -13 +17 2 4 BA BA 15 15 CC

DEPOT MAX – Types of constraints Supply nodes: Net flow out of the node]  [Supply at the node] X12 + X13 + X15 - X21  10 (Node 1) X21 + X24 - X12  17 (Node 2) Intermediate transshipment nodes: [Total flow out of the node] = [Total flow into the node] X34+X35 = X13 (Node3) X46 = X24 + X34 (Node 4) 20 -12 10 7 +10 1 3 5 7 5 6 12 11 7 15 15 2 4 6 -13 +17 Demand nodes: [Net flow into the node] = [Demand for the node] X15 + X35 +X65 - X56 = 12 (Node 5) X46 +X56 - X65 = 13 (Node 6)

All variables are non-negative DEPOT MAX The Complete mathematical model Min 5X12 + 10X13 + 20X15 + 6X21 + 15X24 + 12X34 + 7X35 + 15X46 + 11X56 + 7X65 S.T. X12 + X13 + X15 – X21 £ 10 - X12 + X21 + X24 £ 17 – X13 + X34 + X35 = 0 – X24 – X34 + X46 = 0 – X15 – X35 + X56 - X65 = -12 -X46 – X56 + X65 = -13 X12 £ 3; X15 £ 6; X21 £ 7; X24 £ 10; X34 £ 8; X35 £ 8; X46 £ 17; X56 £ 7; X65 £ 5 All variables are non-negative

DEPOT MAX - spreadsheet Usando o Template Network DEPOT MAX - spreadsheet

Modelo de Pesquisa Operacional Case em Logística Modelo de Pesquisa Operacional Expansão de Centros de Distribuição - CD Uma empresa está planejando expandir suas atividades abrindo dois novos CD’s, sendo que há três Locais sob estudo para a instalação destes CD’s (Figura 1 adiante). Quatro Clientes devem ter atendidas suas Demandas (Ci): 50, 100, 150 e 200. As Capacidades de Armazenagem (Aj) em cada local são: 350, 300 e 200. Os Investimentos Iniciais em cada CD são: $50, $75 e $90. Os Custos Unitários de Operação em cada CD são: $5, $3 e $2. Admita que quaisquer dois locais são suficientes para atender toda a demanda existente, mas o Local 1 só pode atender Clientes 1, 2 e 4; o Local 3 pode atender Clientes 2, 3 e 4; enquanto o Local 2 pode atender todos os Clientes. Os Custos Unitários de Transporte do CD que pode ser construído no Local i ao Cliente j (Cij) estão dados na Figura 1 do slide seguinte. Deseja-se selecionar os locais apropriados para a instalação dos CD’s de forma a minimizar o custo total de investimento, operação e distribuição.

Figura 1 Rede Logística, com Demandas (Clientes), Capacidades (Armazéns) e Custos de Transporte (Armazém-Cliente) A1=350 C2 = 100 C12=9 C11=13 C22=7 C21=10 A2 =300 C14=12 C1 = 50 C32=2 C23=11 C3=150 C24=4 C33=13 C34=7 C4=200 A3=200

Variáveis de Decisão/Controle: Xij = Quantidade enviada do CD i ao Cliente j Li é variável binária, i  {1, 2, 3} sendo Li = 1, se o CD i for instalado 0, caso contrário

Modelagem Função Objetivo: Minimizar CT = Custo Total de Investimento + Operação + Distribuição CT = 50L1 + 5(X11 + X12 + X14) + 13X11 + 9X12 + 12X14 + + 75L2 + 3(X21+X22+X23+X24) + 10X21+7X22+11X23+4X24 + + 90L3 + 2(X32 + X33 + X34) + 2X32 + 13X33 + 7X34 Cancelando os termos semelhantes, tem-se CT = 50L1 + 75L2 + 90L3 + 18X11 + 14X12 + 17X14 + 13X21+ + 10X22+14X23+7X24 + 4X32 + 15X33 + 9X34

Restrições: sujeito a X11 + X12 + X14  350L1 Ver Modelo no Lindo Restrições: sujeito a X11 + X12 + X14  350L1 X21 + X22 + X23 + X24  300L2 X32 + X33 + X34  200L3 L1 + L2 + L3 = 2 Instalar 2 CD’s X11 + X21 = 50 X12 + X22 + X32 = 100 X23 + X33 = 150 X14 + X24 + X34 = 200 Xij  0 Li  {0, 1} Produção Demanda Não - Negatividade Integralidade

Solução do Case em Logística OBJECTIVE FUNCTION VALUE = 4815.0 VARIABLE VALUE REDUCED COST L1 0.0 50.0 L2 1.0 75.0 L3 1.0 90.0 X11 0.0 18.0 X12 0.0 14.0 X14 0.0 17.0 X21 50.0 13.0 X22 0.0 10.0 X23 50.0 14.0 X24 200.0 7.0 X32 100.0 4.0 X33 100.0 15.0 X34 0.0 9.0