NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..

Slides:



Advertisements
Similar presentations
Buildings and Structures 1
Advertisements

COST EFFECTIVE SOFTWARES IN ENGINEERING
Outline CH1.Introduction CH2.Preliminary Design CH3.3D Model.
The Springs Apartment Homes Located at Expressway Islamabad Near Fazaia Colony Exclusively marketed by.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Structural System Overview
RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Youthbuild Scotland.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Foundation Systems.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
Capstone Project Fremont Lake Shore Line Distress Mitigation Bluemont Lakes Fargo, ND.
Multiplying matrices An animated example. (3 x 3)x (3 x 2)= (3 x 2) These must be the same, otherwise multiplication cannot be done Is multiplication.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
Week 9 Drafting Interior Elevations and Sections.
The West London Free School Palingswick House Update.
School Building ready for Slab casting.. View of the Children's Home.
1 Lincolnshire Fire and Rescue’s Training Centre LINCOLNSHIRE FIRE & RESCUE BUILDINGS AND STRUCTURES 1 Building Types and Components.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
ROB at Koratty in lieu of LC No.54 Progress as on
PROVISO HEIGHTS Site Address: Plot No. 179, Sector 17, Ulwe, Navi Mumbai.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
North Carolina Division Headquarters House Renovations – Progress Pictures 2012 Something Constructive North Carolina Division United Daughters of the.
Price List, Payment Plan of Wellington Heights No. of Floors9 No. of Towers3 CATEGORYSIZE(APPROX) 2 BHK1160Sq. ft. 3 BHK1804.
Actual Site Photo Price List Type Of VillasSuper AreaC.L.P 2 bhk (100 sq.yard)1050(sq.feet) bhk (200 sq.yard)1550(sq.feet) At.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
UNIVERSAL M. ENTP. www. affordablehousing. ug AFFORDABLE HOUSING & MUCH MORE JAN 01 – JAN 15.
T HE D UNCAN C ENTER D OVER, D ELAWARE R ACHEL G INGERICH, S TRUCTURAL O PTION S ENIOR T HESIS P RESENTATION A PRIL 15, 2008.
J P LIVING At St Thomas. J P LIVING At St Thomas 7 th Street and Buchanan Street Phoenix, Ariozna Located adjacent to the Chase Ballpark in the Warehouse.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Falling while dismantling scaffold and footing (Serious Accidents in Construction) Construction The copyright to this material belongs to the Korea.
TOWER A Bldg. As of July 21,2009 SCHEDULED ACCOMPLISHMENT21.79% ACTUAL ACCOMPLISHMENT29.46% VARIANCE+7.67% SUMMARY OF ACCOMPLISHMENTS PROJECT DURATION.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Tanvee Housing Complex (HIG & MIG)
Introduction to composite construction of buildings
Required Drawings and Info for Formwork or Scaffold Design
Introduction Lotus Srishti Location Map Floor Plans Numbering Plan
AARNA Progress Report-January 2017
Graduation Project 2 Redesigning a Villa
Construction Project Management
Overview Swan Court is a project developed by Bengal Emami Housing Ltd. (A joint sector project of Emami Group and West Bengal Housing Board). The project.
AARNA Progress Report-June 2017
Concrete Structures DR. Nabil Dmaidi.
Model Updating of a Nine-Story Concrete Core Wall Building
Outline CH1.Introduction CH2.Preliminary Design CH3.3D Model.
Arch205 building construction floor & Roof systems
Building Construction I Sofia Sebastian 1
Building Construction I
Presenter Tony Bosnich 2015
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Surname 99 NOTES: Point of View
Value of contract: Length of contract: Contract start date:
4 Years Milestone plan – (Company Name)
Masonry Bearing Walls.
MONTHS OF THE YEAR Les docs d’Estelle Les docs d’Estelle
Drill of the Flight COLUMN LEFT
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA
Presentation transcript:

NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..

Dear Sir, We are glad to inform you that the construction activities are in full swing at New Town Heights DLF – Kakkanad, in all the launched towers. Please find below the Tower wise progress report. Tower 6 / Block N 17 th floor slab shuttering work in Progress. Block work progressing on the 10 th floor. Ceiling plastering progressing on the 5 th floor. Tower 6 / Block P 17 th to 18 th floor slab column raising in progress. Block work in progress on the 11 th floor. Ceiling plastering progressing on the 3 rd floor Tower 6 / Block Q 18 th floor slab casting in progress. Block work in progress on the 11 th floor. Ceiling plastering progressing on the 5 th floor. Tower 5 / Block K 16 th floor slab shuttering in progress. Block work in progress on the 6 th floor. Ceiling plastering progressing on the 9 th floor. Tower 5 / Block L 15 th floor slab casting in progress. Block work in progress on the 7 th floor. Ceiling plastering in progress on the 9 th floor. Tower 5 / Block M 15 th floor slab shuttering in progress. Block work in progress on the 7 th floor. Ceiling plastering progressing on the 8 th floor.

Tower 4 / Block H Ground to 1 st floor column raising in progress. Tower 4 / Block J 2 nd floor slab shuttering work in progress. Tower 3 / Block G 16 th floor slab shuttering work in progress. Block work progressing on the 3 rd floor. Ceiling Plastering in progress on the 3 rd floor. Tower 2a / Block D 9 th to 10 th floor column raising in progress. Block work in progress on the 3 rd floor. Ceiling plastering work in progress on the ground floor. Tower 2b / Block E 6 th to 7 th floor column raising in progress. Block work in progress on the ground floor. Ceiling plastering in progress on the 2 nd level podium floor. Tower 2b / Block F 7 th floor slab shuttering in progress. Block work in progress on the 2 nd floor. Ceiling plastering in progress on the 1 st floor.

Tower 1 / Block A 16 th floor slab casting completed. Block work progressing on the 8 th floor. Ceiling Plastering in progress on the 7 th floor. Tower 1 / Block B 18 th floor slab casting completed. Block work progressing on the 10 th floor. Ceiling plastering work in progress on the 8 th floor. Tower 1 / Block C 12 th to 13 th floor column raising in progress. Block work progressing on the 5 th floor. We are also attaching the site progress photographs along with this.

TOWER 6 Block work 10 th floor in Progress. Ceiling Plastering 5 th Floor in Progress. Block work 11 th floor in Progress. Ceiling Plastering 3 rd floor in Progress Block work 11 th floor in Progress. Ceiling Plastering 5 th floor in Progress Block –Q 18 th Floor Slab Reinforcement work in Progress Block –P 17 th to 18 th floor Column Raising in Progress Block –N 17 th Floor Slab Shuttering in Progress

Tower 5 Block –K, 16 th floor slab Shuttering & Reinforcement work in Progress Block –L, 15 th Floor slab reinforcement work is in Progress Block work 7 th floor in Progress. Ceiling Plastering 9 th floor in Progress Block work 6 th floor in Progress. Ceiling Plastering 9 th floor in Progress Block work 7 th floor in Progress. Ceiling Plastering 8 th floor in Progress Block –M 15 th Floor Slab Shuttering work in Progress

TOWER -4 (Block H) Block –H Ground floor to 4 th floor Column Raising in Progress

TOWER 4-(Block J) Block –J 2 nd floor Slab Shuttering work in Progress

TOWER-3 (Block G) Block work 3 rd floor is in Progress & Ceiling Plastering 3rd Floor in Progress Block G 16 th floor slab shuttering work in Progress

Tower -2a(Block D) Block work 3rd floor is in Progress & Ceiling Plastering Ground Floor in Progress Block –D 9 th to 10 th floor Column Raising in Progress

Tower -2b(Block E) Block –E 6 th to 7 th floor Column Raising in Progress. Block work Ground floor is in Progress & Ceiling Plastering 2 nd level podium Floor in Progress

Tower -2b(Block F) Block –F 7 th Floor Slab Shuttering work in Progress Block work 2 nd floor is in Progress & Ceiling Plastering 1 st Floor in Progress

TOWER 1 Block –C 12 th to 13 th Floor column raising in progress Block –B 18 th Floor Slab casting completed. Block –A 16 th floor slab casting completed Block work 8 th floor in Progress. Ceiling Plastering 7 th Floor In Progress Block work 10 th floor in Progress. Ceiling Plastering 8 th Floor In Progress Block work 5th Floor in Progress

Block –Q 1 st level podium Slab Completed Block –E & F Podium Pile cap work completed & column raising is in Progress

MARKETING OFFICE -MODEL FLAT Signature Tower Model Flat Partition Wall & False Ceiling Work in Progress Tower 2 Model Flat Partition Wall & False ceiling Work in Progress

THANK YOU