With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Glenvar High School Renovations School Board Presentation
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Foundation Systems.
Constructing Structures
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Chapter 2b Foundations Shallow & Deep Foundations.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Graphic Communication
Reading Structural Drawings
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
HISTORICAL INFORMATION Professional Staff at Peak of Enrollment 1 Superintendent 1 Assistant Superintendent 1 Director of Secondary Education.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Building Plans.
Georgetown ISD Citizen’s Advisory Committee On July 14, 2015 the Georgetown ISD Citizen’s Advisory Committee unanimously voted to recommend to the Georgetown.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Oversight Committee Meeting Fourth Quarter 2015 January 26, 2016.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Planning for “capital” levy and future “capital” bonds What do you think? CRC staff meeting October 6, 2015 Everett Public Schools 1.
Floor Systems and Foundation Support
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Oconee County Schools Five Year Facility Study April 27, 2011.
Bond Project Update September 2017
Foundations of Technology Construction
Bond Oversight Committee
2015 School Bond Construction Program
APPLICATIONS OF TECHNOLOGY
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Capital Improvements Presentation
UNION GROVE ELEMENTARY REFERENDUM
Minuteman Vocational Technical Regional High School Progress
The summer of 2018 and all the work that has taken place
How & When to Get Permits for Work in Your Home
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
Concrete A structural material made by combining cement, sand, aggregate, and water.
Troy School District Bond Program – Series Construction Update
Foundations of Technology Construction
Capital Outlay Workshop
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen equipment campus- wide, resurfacing of the high school parking lot, roof repairs at Stone Middle School.

Rock was added to the south wing of Aaron Parker Elementary. Wood siding Matching stone

The $4.16 million designated for new construction enabled the North Lamar High School to meet the new ‘4x4’ curriculum requirements by adding additional science and computer labs.

NLISD maintenance crew, directed by Tommy Funderburg, moved the fiber optic cable.

Our technology team, directed by Glenda Parson, got the connections back up and working. These two teams saved the district some construction costs.

Construction equipment moved on sight 11/09/09. Prior to this start date the canopy from the high school to the special education building was removed and the grounds surrounding the site were prepared for the construction.

Site work begins

Trench for Fiber Optic

Drilled Pier

Science Lab Grade Beam

Computer Lab Grade Beam

Soil Retainer

Steel Beams

Plumbing Begins

Steel Construction

Snow!

Under Floor Piping Insulation

Under Floor Electrical

Steel Floor Decking

Floor Mesh

First Floor Slab

First Floor Above Slab Plumbing

Second Floor Concrete Slab

HVAC Duct Work

Interior Wall

Science Storage Area

Classroom

Science Classroom

New Wallway

Science Lab

Teachers first to use new computer labs.