Snow Melting 5) Calculating the Circuit Information Divide total tubing by max. circuit length (round up)

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Understanding a life-cycle approach Learning unit B: Exploring eco-efficiency Exercise: Sessel Manufacturing Inc. DEDICATED TO MAKING A DIFFERENCE.
HVAC523 Heat Sources.
Hopefully so you don’t end up with something like this!
Factor of Evaporation: lbs/hr steam produced per BHp.
Preferred Utilities Manufacturing Corp.
Outdoor Reset Options Basic Heating Control –Modulating mixing valve control –Supply temperature high limit –Seasonal pump activation –Boiler activation.
“Do not take anyone’s advice as to how this building should be assembled.”
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
Geothermal Heating & Cooling System Harnesses the free renewable energy in your own backyard to heat and cool your home. Economical - Can save you up.
Ground-Supported Slabs • Exterior Flatwork
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Michael Norgan Radiant Sales Manager Michigan – Indiana - Ohio.
Ground Loop Design. Heat Sources Horizontal ground loops  Collector pipework laid horizontally  Requires large land area  Cost.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Energy Efficient Heating and Cooling Systems For Today Geothermal Heating, Cooing And Hot Water Systems.
HVACR312 - Refrigeration Metering Devices.
Booster System Basics: Constant Speed Systems
Roth Industries Snowmelt Basics. Program Outline I. Introduction II. Applications III. Benefits IV. Classifications V. System Design VI. Installation.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Agricultural Structures: Insulation and Heat Flow
 A 'heat exchanger' may be defined as an equipment which transfers the energy from a hot fluid to a cold fluid. Here, the process of heating or cooling.
GeoMat™ Flat Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,351,005, 7,309,434,
Heat Loss & Gain Calculations 1. How Heat Moves in Homes Conduction is the transfer of heat through solid objects, such as the ceilings, walls, and floors.
Closure of Kern’s Method
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
Kern Method of SHELL-AND-TUBE HEAT EXCHANGER Analysis
Installing & Maintaining Irrigation Systems Ms. Gripshover Landscaping Unit 15.
ENERGY STAR Multifamily High Rise Program Testing and Verification Protocols Webinar – Part II August 2011.
Direct heating system ECOFLOOR Installation guide.
Heather Instasi Tulio Borel. Objectives Design a radiant heating system for a greenhouse located in Atascadero, CA Hot ethylene-glycol solution flowing.
NFPA 13: Installation of Sprinkler Systems
STEAM HEATING.
Hydronic Mechanical Controls
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Load.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Water piping design.
HVAC523 Circulator Pumps.
Lecture Objectives: Finish with thermal storage systems Plumbing Hydronic distribution systems –Chiller/Boiler – Storage – Building.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with thermal storage systems Learn about plumbing systems.
TEC 4607 Wind and Hydro Power Technologies Fall 2011.
1 Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
TEC 4607 Wind and Hydro Power Technologies Fall 2011.
© Irrigation Association Effect of Irrigation. © Irrigation Association Calculate Hydraulic Requirements Chapter 4:
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
ENTC-303Dr. Alvarado1 FLUID FRICTION AND PRESSURE LOSSES.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
S A Griffiths CM42 June 2015 Electrical & Control.
“Beyond the loop layout”.  Jeremy Neven, C.B.C.O. ◦ Chief Building Official ◦ Plumber ◦ HVAC Designer ◦
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Domestic Hot Water Recirculation Design
Exhaust Heat Recovery Systems
Lecture Objectives: Learn about thermal storage systems
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CORAYVAC® Design and Layout
Zurn Industries, LLC.
CONCRETE PAVEMENTS.
Lecture Objectives: Learn about plumbing system and pumps
Lecture Objectives: Learn about plumbing system and pumps
MI-CONTROL and MI-CONTROL-LL
Tracer Applications.
Applying radiant in non-hydronic applications
Presented by Mike Zacharias
Presentation transcript:

Snow Melting 5) Calculating the Circuit Information Divide total tubing by max. circuit length (round up)

Snow Melting 6) Water/ Glycol Design Selecting the percentage of glycol

Snow Melting 7) Flow Rates (gpm) gpm = Btus  T x 500 short form for snow melting  30 F° Btus 15,000 Calculate flow for each snow melting area Divide by number of circuits in area to get gpm per circuit Use flow per circuit to find pressure drop

Snow Melting 8) Pressure Drop gpm through 5/8" PEX = feet of head loss per foot of tubing Circuit length = 250’ Pressure drop = length x loss per foot 250 x = ft. head

Snow Melting 9) Pressure Drop and Flow Rate Adjustments Use the table to adjust the pressure drop and flow rates according to % Glycol mixture

Snow Melting10) Pump Sizing Add gpm of all areas together Take highest head loss in tubing Add any additional head loss (other piping, valves, etc.) Choose pump from manufacturer curves

Snow Melting Cross Sections Slab on grade with insulation

Snow Melting Cross Sections Pavers over sand or stone dust bed with insulation

Snow Melting Cross Sections Asphalt over sand or stone dust bed with insulation

Snow Melting Cross Sections Slab over structural slab

Snow Melting Construction Utilize expansion joints as with a radiant slab (100 foot perimeters, 25’ x 25’ max) Use bend supports and sleeves to protect tubing at all penetration points and expansion joints Insulate under snow melt area Insulate sides of slab (very high heat loss)

Snow Melting Tubing Layout: standard

Snow Melting Tubing Layout: stairs

Snow Melting Selecting the Control Package Basic Digital Snow Melting Control II package –Economical system required –Snow sensor cannot be mounted in the thermal mass

Snow Melting Basic Control Piping

Snow Melting Selecting the Control Package Advanced snow melting control package –Slab protection –Boiler protection –Manual override –WWSD (Warm Weather Shut Down) –CWCO (Cold Weather Cut Out) –Test sequence –Pump exercising

Snow Melting Advanced Control Piping Option 1

Snow Melting Advanced Control Piping Option 2

Snow Melting Advanced Control Piping Option 3

Climate Mat Header

Climate Mat Header after finish pour Assembled header Pressurized 20’ leaders

Climate Mat being rolled out.

Kyle Busch Racing – Garage - Radiant KYLE BUSCH GARAGE – HILLS SERVICE CO.  Project location – Mooresville, North Carolina  Contractor – Hills Service Company  Viega employees assisted in the installation of the Viega Climate Mat Radiant system for this 60,000 square foot race shop.  The Viega Climate Mat was selected due to the functionality and ease of installation in comparison to other radiant systems in the market.  This project will achieve a greater “GREEN” number or “LEAD POINTS” due to the use of Geothermal and having it tied into the Viega Radiant System.

Kyle Busch Racing – Garage - Radiant Main garage area prior to install. Jay & Kevin work diligently to find the Climate Mates to place in the garage and wash bay areas. Garry is busy hammering down the Climate Mate. Main garage after Climate Mate install. Example of the proper spacing and install of Climate Mat. Example of one of the connected manifolds for the Kyle Busch garage.