Subfloor Evaluation Prior to Installation Understanding the science of concrete slabs prior to installation of moisture sensitive floor covering materials.

Slides:



Advertisements
Similar presentations
FLOOR FINISHES Screeds Terrazzo (in-situ type) Ceramic Tiling
Advertisements

ARC313 Building Code II. Review What is the minimum bearing pressure allowed for soils to support foundations? 75 kPa How can you tell by looking at the.
SHOTCRETING K.V.SUBBA RAO.
Materials used in the external walls. Brick Bricks are probably the oldest manufactured material we have today. Although the method of production has.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
Polymer Floor & Wall Coatings: Selection, Preparation, Installation and Troubleshooting.
Tests to Verify Low Strength Concrete ACI Georgia Chapter Virgil D. Skipper Seminar June 2009 Robert Jenkins, P. E.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Presented By: Mike Mudrick 2012 ICRI Carolinas Chapter Fall Convention Coating Failures, Causes, Preventative Measures & Repairs Executive Development.
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
Ground-Supported Slabs • Exterior Flatwork
CE-303-Lecture #1 Fundamentals of Concrete Objectives To explain the basic concepts of concrete To explain briefly the properties of freshly mixed concrete.
The Choice of Professionals ™ Seth Pevarnik Manager of Technical Service.
Curing and Protection of Concrete
L&M Construction Chemicals Concrete Basics
Distress, Evaluation, and Repair of Historic Concrete Jarkko Simonen, P.E. Wiss, Janney, Elstner Associates, Inc.
Cutting Edge Solutions Using Advanced Self Leveling Materials ICRI National Convention April 14, 2010.
Properties of Fresh Concrete
Protection Of Reinforcement Steel From Corrosion Prepared By: Mohamed A. El-Reedy, Ph. D. © Dr. Mohamed A. El-Reedy.
Masonry Cement and Mortar
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Subfloor Preparation and Moisture Mitigation “an ounce of prevention is worth a pound of cure” Benjamin Franklin.
Introduction Dr Magnus Currie From Scotland, UK MEng Civil Engineering
Learning Objectives Relevance of fresh concrete properties
Volumetric Change of Repair Materials Low Shrinkage Materials.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Name Tandus.
Strength of Concrete.
Development of Strength. Development of strength: development of strength after placing of concrete. Curing: It is the procedures used for promoting the.
CRACK CONTROL IN CONCRETE MASONRY WALLS
Concrete Construction
Ag.Mechanics Pd. 2,4,5,6.  Name what the two aggregates are in the cement mixture.  What 3 things make up the cement mixture.
Presented by: Peter Emmons,
1. The Challenge Hospital-associated infections (HAIs) like MRSA continue to be a problem in health care facilities It is estimated that each year in.
Intro to Concrete 18.0 & 19.0 Class notes.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
Plain Concrete I. *Definition 1. Concrete: a hard, strong construction material consisting of a hardened or set mixture with such aggregates as sand, gravel,
Product Range Floor Hardeners Waterproofing Compounds
Finishing the Building
Silver Oak College Of Engineering & Technology.
Moisture Mitigation How they work and what to use.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Concrete Slab Quality Requirements. Who Controls Concrete Quality Polishing contractors have to perform work on a concrete floor slab in which they had.
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
Plastic Shrinkage Cracking How to make sure it happens!
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Concrete Countertops. Cast in place Pre – Cast Overlay.
Drying of concrete Exercise 10. Evaporation of water from K30 concrete Evaporated water kg/m 3.
FLOORWORX SD VINYL TILES & SHEETING_.  INTRODUCTION_  BENEFITS_  SUGGESTED SPECIFICATION_  INSTALLATION INSTRUCTIONS_  MAINTENANCE PROCEDURES_ 
RENAISSANC E CARPET TILES_.  INTRODUCTION_  BENEFITS_  SUGGESTED SPECIFICATION_  INSTALLATION INSTRUCTIONS_  MAINTENANCE PROCEDURES_  TECHNICAL.
University of Sydney – Structures CONCRETE Peter Smith 1998 Concrete Making and Testing l Unique material çMade specially for each job çHandling on job.
PRIMO SD VINYL TILES & SHEETING_.  INTRODUCTION_  BENEFITS_  SUGGESTED SPECIFICATION_  INSTALLATION INSTRUCTIONS_  MAINTENANCE PROCEDURES_  TECHNICAL.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
1 Property of Raven Industries, Inc. All Rights Reserved.
Patented Technology – Quality Results Ulti-Pave 3 Pavement Repair Mix 30-Minute Workability 3,000 PSI 3-Hour Set ® “A One Component, Rapid Hardening Cementitious.
How to Write A Good Concrete Moisture Testing Specification EP Floors Corp.
Curing Definition The process of prevention of loss of moisture from fresh concrete while maintaining satisfactory temperature regime (BS 8110) Fig: The.
STATIC CONTROL TILES & SHEETING PRIMO SD. INTRODUCTION  Static Dissipative flooring is essential for protecting sensitive equipment from static charge.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Floor Systems and Foundation Support
Substrate Identification Floors. Principal Substrates T & G floorboards Flooring grade boards Concrete Screeded concrete Tile Backer Boards Under Floor/Under.
CONCRETE CHEMICALS & APPLICATIONS
Chemical Admixtures In Concrete
FLOORWORX SD STATIC CONTROL TILES & SHEETING.
FLOORS Introduction: The purpose of a floor is to provide a level surface capable of supporting the occupants of a building, equipment and sometimes internal.
Interior Finishes and Detailing
إختبار وتقييم المنشآت الخرسانية
Floor Covering.
Presentation transcript:

Subfloor Evaluation Prior to Installation Understanding the science of concrete slabs prior to installation of moisture sensitive floor covering materials

ASTM F-710 and ACI 302.2R-06

ASTM F-710  Preparation of Concrete Slabs to Receive Resilient Flooring Determination of suitability of a concrete subfloor for resilient flooring Determination of suitability of a concrete subfloor for resilient flooring Suggested construction methods for concrete slabs Suggested construction methods for concrete slabs Suggested preparation methods of concrete floors for resilient flooring installation Suggested preparation methods of concrete floors for resilient flooring installation

Related ASTM Procedures  C 109/C 109M Test Method for Compressive Strength of Hydraulic Cement Mortars  C 309 Specification for Liquid Membrane-Forming Compounds for Curing Concrete  C 472 Test Method for Compressive Strength of Gypsum Cement  D 4259 Practice for Abrading Concrete  E 1155 Test Method for Determining FF/FL (Floor Flatness and Floor Levelness)  E 1486 Test Method for Determining Floor Tolerances Using Waviness, Wheel Path, and Levelness Criteria  E 1745 Specification for Plastic Water Vapor Retarders Used In Contact With Soil or Granular Fill Under Concrete Slabs  F 141 Terminology Relating to Resilient Floor Coverings  F 1869 Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride  F 2170 Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In Situ Probes

General Guidelines of ASTM F-710  Dry, clean, smooth and structurally sound…  Surface cracks and control joints should be filled…and provide a minimum of 3000 psi compressive strength in 28 days  Expansion joints shall not be filled…  Surface must be cleaned…  No asphaltic adhesive residues…  Shall be smooth and flat…within 3/16” in 10ft.

Testing a Slab per ASTM F-710  Removal of sealers, curing agents, bond breakers otherwise known as the “water drop test”  Moisture Testing Moisture Vapor Emissions Rate (MVER) Moisture Vapor Emissions Rate (MVER) In Situ RH (Relative Humidity) In Situ RH (Relative Humidity)  pH Testing

Moisture Testing per ASTM

Preparation of New & Existing Concrete Subfloors  New concrete must be cured and dried and in compliance with resilient floor covering manufacturer requirements  Existing concrete must be free from any adhesive residues, clean, dry and in compliance with resilient floor covering manufacturer requirements

Basic Concrete Slab Construction  Site evaluation Compressed soil Compressed soil Large aggregate (capillary break) Large aggregate (capillary break) Smaller aggregate Smaller aggregate  Moisture barrier specifications 0.010” thick reinforced film 0.010” thick reinforced film  Exterior Drainage and Landscaping concerns

ACI 302.2R-06  Guide for Concrete Slabs that Receive Moisture- Sensitive Flooring Materials Introduction Introduction Concrete Moisture Basics Concrete Moisture Basics Concrete Moisture Testing Concrete Moisture Testing Concrete pH Testing Concrete pH Testing Floor Covering Adhesive Manufacturers Recommendations Floor Covering Adhesive Manufacturers Recommendations Drying of Concrete Drying of Concrete Vapor Retarder/Barrier Vapor Retarder/Barrier Floor Covering Materials Floor Covering Materials Design and Construction Design and Construction

Introduction “The objective of this document is to reduce the potential for moisture-related problems in both slabs-on-ground and suspended slabs. It provides basic information on the concrete drying process, moisture behavior in concrete, testing for pH and moisture, and vapor retarders/barriers. Based on this information, recommendations for the design and construction of concrete slabs that will receive moisture-sensitive or pH sensitive flooring materials or coatings are presented.”

Flooring Moisture Issues

Concrete Moisture Basics  Understanding how water moves through hardened concrete is important in determining: Consequences of the moisture movement; Consequences of the moisture movement; Effectiveness of moisture testing methods; and Effectiveness of moisture testing methods; and Validity of flooring manufacturers’ warranty recommendations Validity of flooring manufacturers’ warranty recommendations

Moisture Sources  Water of Hydration Water required to complete chemical reaction Water required to complete chemical reaction Typically considered ~25% of cement by weightTypically considered ~25% of cement by weight  Water of Convenience Water used for ease of workability and placement Water used for ease of workability and placement Usually another 25% to 40% of cement by weightUsually another 25% to 40% of cement by weight  Moisture Vapor Transmission (MVT) Water of convenience evaporating Water of convenience evaporating 4” slab poured at.50 W/C evaporates >½ gallon per sq ft.4” slab poured at.50 W/C evaporates >½ gallon per sq ft. Water coming up through the concrete from under slab Water coming up through the concrete from under slab

Concrete Curing/Drying  After curing and before drying begins, the moisture distribution in a hardened concrete slab is reasonably uniform throughout the member thickness (Hanson 1968). As concrete dries, the amount and distribution of moisture changes (Hedenblad 1997).

Curing/Drying of Lightweight & Normal Concrete  Drying profiles differ for normal weight and lightweight concrete;  Lightweight concrete takes longer to dry than normal weight concrete; and  Normal weight concrete takes less than 90 days and lightweight concrete takes more than 180 days to reach 85% RH at the center of a 6 in. (150 mm) diameter specimen.

Effects of Moisture Movement  Warping or Curling Slab curls due to moisture loss Slab curls due to moisture loss Contractor grinds to bring into specification for flatness Contractor grinds to bring into specification for flatness Floor covering or moisture barrier applied Floor covering or moisture barrier applied Concrete Equilibrates Concrete Equilibrates Slab Relaxes and areas ground and now lower Slab Relaxes and areas ground and now lower

Effects of Moisture Movement  Joint Bulging Slab poured Slab poured Control Joints cut and due to normal slab shrinkage become “V” shaped Control Joints cut and due to normal slab shrinkage become “V” shaped Patching compounds installed Patching compounds installed Floor covering installed Floor covering installed Slab equilabrates and relaxes Slab equilabrates and relaxes Patching compound compressed out of joint. Patching compound compressed out of joint.

Effects of Secondary Moisture Exposure  Concrete slabs, properly prepared and under functional HVAC control typically take days to reach moisture levels suitable for “normal” floor covering installation Rewetting resets the dry time clock my several weeks Rewetting resets the dry time clock my several weeks

Concrete Moisture Testing  Standard test method, if applicable;  Acceptable test methods;  Frequency and location of testing;  Environment (before and during the test);  Surface preparation, if applicable;  Responsible testing party;  Acceptance criteria; and  Interpretation of results.

ASTM Supporting Test Procedures  ASTM E 1907, “Standard Guide to Methods of Evaluating Moisture Conditions of Concrete Floors to Receive Resilient Floor Coverings,”  ASTM D 4263, “Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method,”  ASTM F 1869, “Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride,”  ASTM F 2170, “Standard Test Method for Determining Relative Humidity in Concrete floor Slabs Using in situ Probes,” and  ASTM F 2420, “Standard Test Method for Determining Relative Humidity on the Surface of Concrete Floor Slabs Using Relative Humidity Probe Measurements and Insulated Hood.”

Concrete Moisture Testing

Concrete pH Testing  Factors effecting pH Testing: Wetting Time Wetting Time Test Kit Components Test Kit Components Carbonation Carbonation Surface Preparation Surface Preparation Water in the flooring adhesive Water in the flooring adhesive

Adhesive Recommendations  Vapor retarder/barrier  Concrete properties or materials  Curing  Surface finish  Floor flatness  Moisture limit  pH limit  Surface preparation  Repair

Typical Moisture Vapor Limits

Concrete Surface Criteria

Drying of Concrete  Water to Cement ration (w/c) is the main driver for concrete drying

Drying of Concrete  Thickness of concrete slab also impacts drying time

Vapor Retarder/Barrier  Polyethylene based plastic sheet  Maximum perm rating of 0.3 perms (1 grain per ft2/h per in. of mercury pressure.)  Placed in direct contact with slab or with a “granular blotter layer” between the sheet and concrete.

Floor Covering Materials  Maintain open communication between architect and engineer to ensure Division 9 specifications are in line with Division 3 requirements for concrete. Section Epoxy Terrazzo; Section Epoxy Terrazzo; Section Specialty Flooring; Section Specialty Flooring; Section Fluid-Applied Athletic Flooring; Section Fluid-Applied Athletic Flooring; Section Resilient Athletic Flooring; Section Resilient Athletic Flooring; Section Wood Flooring; Section Wood Flooring; Section Resilient Tile Flooring; Section Resilient Tile Flooring; Section Sheet Vinyl Floor Coverings; Section Sheet Vinyl Floor Coverings; Section Linoleum Floor Coverings; Section Linoleum Floor Coverings; Section Resinous Flooring; Section Resinous Flooring; Section Static-Control Resilient Floor Covering; Section Static-Control Resilient Floor Covering; Section Carpet; Section Carpet; Section Carpet Tile; Section Carpet Tile; Section High-Performance Coatings; and Section High-Performance Coatings; and Section Elastomeric Coatings. Section Elastomeric Coatings.

Floor Covering Materials  Effect of Moisture on Floor Covering Adhesive bond strength

Design and Construction  Specifications will usually include clauses related to: Testing; Testing; Moisture mitigation systems; Moisture mitigation systems; Vapor retarder/barrier; Vapor retarder/barrier; Concrete materials and properties; Concrete materials and properties; Curing; Curing; Protection; Protection; Surface preparation; Surface preparation; Repair materials; and Repair materials; and Floor covering adhesives. Floor covering adhesives.

ASTM F and ACI 302.2R-06

THANK YOU