Freezer Alarm &Backup Systems Preventing Sample Losses * * * * * * * * * * * * * * * * * * * * * * * * Joe DeFrancesco, Gina Koskela, Peter Sturman Oregon.

Slides:



Advertisements
Similar presentations
Wall Mounted J series Troubleshooting.
Advertisements

Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
B757 Review Questions.
Operating Functions.
Daikin Altherma™ Troubling Shooting
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Motorcycle product sheets
Utility Management Providence Health System - Oregon Environment of Care.
HVAC Commercial Ref.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Left Side Discharge Pressure Regulator
Full Authority Digital Engine Control
 Description of PressurePro System  Identify system components  Display and Operational Modes  Sensor alerts  Checking of tire pressures  Manual.
LAFA Food Distribution July 26, Introduction:
Motorcycle antitheft systems Spyball 6500 platform Benefits 6500 Description: compact motorcycle antitheft alarm and engine immobiliser. Arming/disarming.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Installation and Initial Start Up Worldwide Manufacturer of PSA Generators by Laco Remias, Service Engineer, Aftersales & Service.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
Fire Electrical Back Security
Dillard’s Energy Management
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Chapter 14: Inspection and Maintenance
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
Welcome Presentation On Office security system. Group Members: Md. Emdadul Haque Md. Sahed Hasan Md. Samsul Arefin Khokan Das.
FG Wilson Access 4000 Control Panel
Perfect solution for large building
March ) Pretreatment Tank 2) Aeration Chamber 3) Clarifier Chamber 4) Chlorinator 5) Holding Tank 6) Aerator Pump 7) Millenium Control Center 8)
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
NOTES 17 - Circuits What is a circuit? Circuit – a pathway for electric current to travel through.
LAFA Food Distribution
GSM sites Cooling systems description Standard Air Conditioner SystemEmergency Cooling SystemEnergy Saving Cooling System Air Conditioner Cooling system.
Introduction to Defrost
Utility Engineers, PC.  Generation  Transmission  Distribution.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
1 Industry leading Temperature & Humidity Control and Monitoring with Ethernet in-built Phasefale JouleTemp Click left mouse button to advance, “back”
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
E4 HVACR Electrical Installation
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
YOU’VE GOT THE POWER!. When the grid goes down, which type of system do you want for emergency power: battery or generator? Either type will get the job.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Planned Preventive Maintenance for Fridges To improve your fridge’s function do the following tasks all the time: 2) Defrost your fridge once a month OR.
shift to the Test Mode (Forced Operation).
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
"This document can not be used without Samsung's authorization"
PLC Millenium II Application Notes NEUSS November 2004.
E4 HVACR Electrical Installation
Presentation On Office security system
Exhaust, Electrical, and Ignition.
"This document can not be used without Samsung's authorization"
E4 HVACR Electrical Installation
Understanding Olympian Generator Set Schematics
Uninterruptible Power Supply
Objectives Learn about Electricity Pricing Electric systems.
Confidential Oilfree Scroll Compressor   Simplex/Multiplex SRL kW   Troubleshooting Hitachi Industrial Equipment Systems Co., Ltd. Air Compressor.
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Freezer Alarm &Backup Systems Preventing Sample Losses * * * * * * * * * * * * * * * * * * * * * * * * Joe DeFrancesco, Gina Koskela, Peter Sturman Oregon State University North Willamette Research and Extension Center Aurora, Oregon

Different modes of freezer and alarm failure Different modes of freezer and alarm failure Freezer malfunction experiences at NWREC Freezer malfunction experiences at NWREC Description of backup natural gas generator Description of backup natural gas generator Description of alarm system and phone dialer Description of alarm system and phone dialer Helpful hints to prevent loss of frozen samples Helpful hints to prevent loss of frozen samples Freezer Alarm &Backup Systems

Modes of Freezer and Alarm Failure Interruption of electrical power to facility Interruption of electrical power to facility Area-wide power outage; local power outage (power pole on road) Area-wide power outage; local power outage (power pole on road) Freezers, Alarm and Dialer system, need to have separate power source Freezers, Alarm and Dialer system, need to have separate power source Failure of individual freezers Failure of individual freezers Compressor failure (fan cover impediment; old age) Compressor failure (fan cover impediment; old age) Freezer plug accidently pulled Freezer plug accidently pulled Alarm failure due to circuit breaker failure Alarm failure due to circuit breaker failure High ambient temperature → overload of circuit breaker to freezers High ambient temperature → overload of circuit breaker to freezers Have battery back-up on alarms and dialer just incase back-up generator fails after a main power outage Have battery back-up on alarms and dialer just incase back-up generator fails after a main power outage Alarm batteries = 6 hr usage; 24 hr stand-by Alarm batteries = 6 hr usage; 24 hr stand-by UPS (dialer) battery = 2 hr usage; hr stand-by UPS (dialer) battery = 2 hr usage; hr stand-by

100 amp Normal service panel TRT Freezer UTC Freezer Alarm Prior to Alarm and Backup System

100 amp Normal service panel 100 amp Automatic transfer switch 7 kw Natural Gas Generator TRT Freezer UTC Freezer Alarm (w/ battery backup) Alarm w/ battery backup UPS (battery backup for dialer) Freezer Alarm and Backup System Dialer

Interruption of Electrical Power to Facility Interruption of electrical power is sensed by a Guardian 100 amp Automatic Transfer Switch (ATS) Interruption of electrical power is sensed by a Guardian 100 amp Automatic Transfer Switch (ATS) ATS simultaneously disconnects normal power supply to freezers and alarms ATS simultaneously disconnects normal power supply to freezers and alarms Once ATS disconnects electrical power, it activates a 7 kw natural gas generator and connects power to the freezers and alarms Once ATS disconnects electrical power, it activates a 7 kw natural gas generator and connects power to the freezers and alarms Generator is programmed to turn on once a week to test system Generator is programmed to turn on once a week to test system

100 amp Normal service panel 100 amp Automatic transfer switch 7 kw Natural Gas Generator TRT Freezer UTC Freezer Alarm (w/ battery backup) Alarm w/ battery backup UPS (battery backup for dialer) Freezer Alarm and Backup System Dialer

ATS Main Power Source Power from Generator Power to Alarms and Horn UPS Battery Phone Dialer Power to Freezers (2 separate circuits) Phone Line Power to Phone Dialer

Main Power Alarms, Horn, and Dialer TRT Freezer UTC Freezer Important: Separate circuits 1. UTC Freezer 2. TRT Freezer 3. Alarms, Horn, Dialer

Individual Freezer Failure Each freezer is equipped with temperature sensing alarm Each freezer is equipped with temperature sensing alarm When alarm set point (25°F) is exceeded for one hour, alarm system is activated When alarm set point (25°F) is exceeded for one hour, alarm system is activated Audible alarm (horn at freezer site) Audible alarm (horn at freezer site) Contact information posted on freezer doors Contact information posted on freezer doors Automatic phone dialer calls each of the pre-programmed numbers on the emergency contact list with a recorded message Automatic phone dialer calls each of the pre-programmed numbers on the emergency contact list with a recorded message Programmed to delay for answering, then to repeat message 3x each number, then 3 reps Programmed to delay for answering, then to repeat message 3x each number, then 3 reps System tested at beginning of season when freezers are empty (about every other month) System tested at beginning of season when freezers are empty (about every other month) Install individual circuit breakers to alarms; include battery backup Install individual circuit breakers to alarms; include battery backup

Freezer Alarm Schematic Automatic transfer switch UPS Auto phone dialer Freezer alarm Alarm horn

Temperature sensor for freezer to sound alarm

Dial on each freezer indicates status of operation (connected to temp gauge in freezer); high temp may be due to defrost ~ Working (refrigeration) ~ Defrost

Helpful Hints to Prevent Sample Loss Secure the freezer area Secure the freezer area Locks on freezer doors Locks on freezer doors Indoors, with cool ambient air, is best to prevent failure Indoors, with cool ambient air, is best to prevent failure Frozen jugs of water to keep freezers cool Frozen jugs of water to keep freezers cool Backup temp recorders in freezers to verify sample integrity Backup temp recorders in freezers to verify sample integrity Install alarm and backup systems; test regularly Install alarm and backup systems; test regularly