André Augustinus 16 June 2003 DCS Workshop Safety.

Slides:



Advertisements
Similar presentations
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
DSS Advisory Board Christoph Schäfer Rack Safety System.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
André Augustinus 16 September 2002 Safety issues.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Chiller control system Lukasz Zwalinski – PH/DT.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
The Software for the CERN Detector Safety System G. Morpurgo, R. B. Flockhart and S. Lüders, CERN IT/CO.
60kW Thermosiphon control system
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
External Data and DIP Oliver Holme 18 th January 2008.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003.
Safety Systems for ALICE
M.Tavlet, H.Taureg - ALICE
Presentation transcript:

André Augustinus 16 June 2003 DCS Workshop Safety

André Augustinus 16 June 2003DCS Workshop 2 Safety Systems  What is Safety: Safety of people (prevent injuries or worse) Safety of equipment (protect capital investment)  CERN Safety System Covers Level3 alarms (Fire, Gas etc.)  DCS ensures integrity through: Alarm reporting (for operator intervention) and automation Detailed control on detector level and control of infrastructure and services (with high granularity) Interlocks on detector level

André Augustinus 16 June 2003DCS Workshop 3 Context  Control and safety systems will act directly on the equipment at the experiment site; such as: Detectors with their related equipment Racks and crates Gas systems Cooling systems Magnets Power distribution Water distribution General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Technical Services provide power, water, primary gas (general services) and distribute them to the different locations (experiment services). Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 4 Context  Sensors monitor the state of the equipment: temperature (equipment, ambient air, water), humidity, water leak water-flow, Smoke and gas, status signals of the detectors  There are dedicated sensors for the different safety and control systems General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 5 CCS (cooling) Control systems  The various control systems are responsible for the overall monitoring and control of the detector or services.  They will take corrective action to maintain normal operation.  All control systems are interconnected. General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors monitor control DCS sub-system C DCS sub-system B DCS sub-system A MCS (magnets) GCS (gas) ST/CV (water) ST/EL (power) Trip Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 6 Safety system (CSS)  The safety for personnel is ensured by the CERN Safety System (CSS). It is required by law and conforms to relevant International, European, and National standards.  It has its own sensors and reacts globally, i.e. on whole buildings or caverns General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A CSS Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 7 Safety system (CSS) General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A CSS Smoke, Gas Leak TCR Fire Brigade to P2 Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 8 Local safety systems (e.g. MSS, Interlocks) General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A  Local safety systems preserve the integrity of well defined systems The Magnet Safety System protects the magnets Interlocks protect detectors MSS Water fail Ramp down magnet Gas fail Ramp down High Voltage Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 9 Is that all ? General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A  Does this cover all events?  What happens if a control room gets hot? Only action if individual items overheat (or burn…)  What happens if there is a water leak in the racks? Only action if electronics get wet and short-circuit…  What happens if T goes up in detector? Only action if one of detectors see it Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 10 Detector Safety System General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A  DSS covers some of the functionality that was covered by GSS in LEP times (and is not covered by CSS and DCS)  Name might be misleading, DSS covers more than only detector safety Think of it as experimental area surveillance system Water Leak DSS Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 11 Experiment DCS Detector Safety System General services: power, water Experiment services: gas, cooling, magnet Experiment: detectors, racks, crates Sensors DCS sub-system C DCS sub-system B DCS sub-system A  DSS is embedded in the experiment DCS system DSS Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 12 DSS project  Four LHC experiments defined requirements  JCOP project started May 2002  Prototype has been build by DSS team  Review has taken place earlier this month  Installation for CMS and LHCb this year  Installation for ALICE next year Will have to define requirements of first installation by the end of this summer

André Augustinus 16 June 2003DCS Workshop 13 DSS Implementation  A redundant PLC solution (Siemens) has been chosen for the ‘front-end’ (similar to the new safety system of the Mont Blanc tunnel)  CPUs are comfortably separated to minimize danger of accidental damage Cavern Surface Shaft Optical Link  Interconnection with optical link Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 14 DSS Implementation  Redundant cables running through two cable paths. Spares for all cables are foreseen. Cavern Surface Shaft Optical Link PROFIbus DSS COM CERN LAN  Internal DSS Network  Connection to outside world through “gateway” Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 15 DSU Layout Patch Panel Terminals to connect sensors / actuators Table / Drawer Control Room Panel, Gyro & Siren (not part of a DSU) External Crate with dedicated Monitoring Module 2 nd External Crate possible Ethernet Switch for DSS COM (in DSUs with CPU crate) CPU crate (in two DSUs) Redundant 24V Power Supply & a Distribution Module Front-End Display OPC Server / Gateway (in one DSU) Uninterruptible Power Supply (UPS) 52 units standard LEP rack (here: 56U) Based on slides of Stefan Lüders (DSS Team)

André Augustinus 16 June 2003DCS Workshop 16 DSS implementation  The ‘back-end’ (configuration and user panels) is based on PVSS  Maintenance and support will be done by a central team

André Augustinus 16 June 2003DCS Workshop 17 DSS  Will cover mainly water temperature and ambient temperature measurements; some water leak detection  A limited amount of detector inputs and outputs are foreseen Detector needs will be studied case by case

André Augustinus 16 June 2003DCS Workshop 18 Example  To illustrate the fact that the DCS, DSS and CSS systems are complimentary Use a counting room as example

André Augustinus 16 June 2003DCS Workshop 19 T T ambient T Rack T switch T ambient only for monitor If T Rack too high  act on equipment in the rack If T switcht too high  stop power to rack (hardwired) DCS

André Augustinus 16 June 2003DCS Workshop 20 T T water T1T1 T2T2 T3T3 T4T4 Vlv in Vlv out Water Leak Power close valves stop power If 2 out of ( T 1, T 2, T 3, T 4 ) too high  stop power If T water too high  stop power If valves closed  stop power If Leak  stop power (also to CR below!) and close valves If no Power  Signal det a and/or det b and/or det c If Det 1 or Det 2  Signal det a and/or det b and/or det c Det 1 Det 2 det a det b det c DSS

André Augustinus 16 June 2003DCS Workshop 21 T Smoke In case of smoke  stop power (to all counting rooms) CSS

André Augustinus 16 June 2003DCS Workshop 22 Summary  There is not much for you to do (for once…) The activity is concentrated in the central team, with the ‘pit operation’ team and Glimos But, let us know if you think of a parameter that could be input to the DSS and act on your detector or equipment