Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.

Slides:



Advertisements
Similar presentations
Bangladesh flooding Project By Tara and Alex. When? Where?
Advertisements

RIVER DRAINAGE BASINS.
1) Explain how each method works … 2) give good points & bad points of each strategy 3) Give viewpoints of different groups of people 4) Consider whether.
Managing Flooding Hard and Soft Engineering LO: to understand the types of hard and soft engineering used to control rivers and the advantages and disadvantages.
Managing Flooding Hard and Soft Engineering. HARD ENGINEERING This uses technology, large amounts of money to try and control the river. It can prevent.
Floods Hard and Soft Engineering. Hard Engineering This uses technology, large amounts of money to try and control the river. It can prevent floods in.
Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
Section 3: Stream Deposition
WIDESPREAD FLOODING IN NEW JERSEY AS LOCAL RIVERS OVERFLOW AFTER SPRING STORMS PASSAIGE, SADDLE, RAMAPO, POMPTON RIVER SYSTEMS OVERFLOW BANKS MARCH 7-13;
Floodwalls Washlands Hard or Soft engineering?
Today we are going to build a case study of flooding in Bangladesh. This will contrast with the MEDC case study of Boscastle that we have already studied.
Carlisle Case Study Using an Atlas, describe the location of Carlise.
Earth’s six water reservoirs Reservoir% Earth's Water% Usable Water Oceans97.54%----- Glaciers2.15%----- Shallow Groundwater0.31%96.9% Fresh Lakes/Streams0.009%2.8%
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
Flooding in Boscastle 16th August Map of Boscastle. Aerial Photo. MUST: Annotate images and diagrams to show the causes and effects of the Boscastle.
Year 7 Revision May MAPSKILLS 2.8 Ordnance Survey maps.
Case Study: UK Floods Cockermouth, Cumbria 19th November 2009
Prediction and prevention of river flooding. Forecasting Flooding In Britain, satellites and sophisticated modelling software are used to forecast future.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Chapter 2: Landforms of Georgia Lesson 4: How Do Humans Change Landforms? S5E1c: Students will relate the role of technology and human intervention in.
A 328ft (100m) section of the north bank of the River Derwent was under threat from erosion About 3,000 tonnes of limestone blocks were placed 20ft (6m)
NO TIME TO WASTE STATES IN THE MISSISSIPPI RIVER’S PATH TO ITS DELTA REGION HAVE ABOUT 2 WEEKS TO AVERT FLOOD AND HEALTH CARE DISASTERS Walter Hays, Global.
Flood and erosion defences on the river Mersey. We will learn: The different flood and erosion defences on the river Mersey The different flood and erosion.
LEDC CASE STUDY Flooding in Bangladesh. Effects of the floods Flood waters swept away and caused severe damage to railways, roads and bridges. This cut.
Case Study: UK Floods Cockermouth, Cumbria 19th November 2009
Crisis in Shrewsbury Flooding impacts and risk management.
LO:I can explain the effects of river flooding on people and the environment.
RIVER DRAINAGE BASINS. A RIVER SYSTEM ACTS LIKE A SYSTEM OF DOWNPIPES AND GUTTERING ON A HOUSE - IT ALLOWS THE MOVEMENT OF RAINWATER INTO THE SEA.
The Thames Estuary - London
FLOOD DEFENCES ALONG THE R. MEDWAY AROUND TONBRIDGE.
Why do you think this area will flood?. Protecting against flooding By the end of the lesson you will; 1)Have recapped the different causes of flooding.
What do you need to know? This resource looks at the difference between Hazard, Risk and Disaster!
Meandering Rivers WHAT IS A MEANDER?. Formation of Meanders.
Section 3: Stream Deposition
Label: Source Mouth Tributary Meander Vertical erosion Lateral erosion Can you mark on the meander where deposition and erosion would take place? Draw.
The River Clwyd Chapter 4 What happens to the river when there is too much water? Next Page.
Floods Hard and Soft Engineering Lo; to understand the sustainability of differing flood protection methods.
What are the management challenges associated with the development of river landscapes? Managing river landscapes is often about balancing socio-economic.
Impacts of Flooding and Flood Risk 1)To study the impacts of flooding 2)To understand how hydrologists try to forecast the likelihood of future floods.
WJEC GCSE Geography A Unit 1 – The Core A- The Physical World Theme 1 Water.
What are the problems of managing a river? Socio-economic and environmental needs?
Year 7 Revision May MAPSKILLS 2.8 Ordnance Survey maps.
Boscastle Floods, 16 th August Boscastle Floods, 16 th August 2004 – Causes:  Over 70mm of rain fell in just two hours  The ground was already.
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
November Average annual rainfall is about 2,000 millimetres, reported by the met office Cumbria is a region in North-East England The region has.
Hard v Soft Engineering You decide???. Hard v Soft Building a structure (often concrete and steel) to control the river. Essentially, dealing with the.
River flooding LS: Explain the soft and hard strategies of reducing flood risk. Write a case study for a flood event in an MEDC and LEDC and explain the.
Where in the World? New Orleans, USA.
Boscastle - the most frightening flood of the decade?
Flood management.
Analysis of Hydrographs
Construction Analysis Hydrographs
How can you manage floods?
Marium, Alex, Billy, Ollie
River Conwy - flood management
PowerPoint 5: Flood management strategies
Physical Landscapes in the UK - River Landscapes
What are the different strategies used to try and prevent or manage flooding? To be able to explain the advantages and disadvantages of the different methods.
The Drainage Basin The Hydrological (Water) Cycle: Drainage Basin –
Boscastle Flood Tash Merrett
OptiMIZING ROAD INFRASTRUCTURE FOR FLOOD PREPAREDNESS AND EMERGENCY AND POST EMERGENCY RESPONSE FRANK VAN STEENBERGEN
What causes rivers to flood?
LT Creek Floodplain Risk Management Study & Plan
Hard and Soft Engineering
Flood Management Objective: Compare hard and soft engineering approaches to flood management Outcomes: Identify the difference between hard and soft engineering.
PAPER 3: Geographical Applications
KEY IDEA: Weather Hazards
Flood defences.
Managing River Floods Natural Physical Causes of Floods
Presentation transcript:

Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed

Management of future floods at Cockermouth £4.4 million pound management scheme New flood defence walls will halt the spread of the river Funding from Government and local contributors River dredged more regularly to deepen the channel New embankments raise the channel height to reduce the likelihood of extra floods New floodgates at the back of houses in Waterloo street WmjNqbOAVcBKWgY-TljVG9zIRu-rMqE_http:// WmjNqbOAVcBKWgY-TljVG9zIRu-rMqE_

Within weeks of the floods in November 2009, the Environment Agency had published an updated Flood Management Plan for the River Derwent. Although it outlined the need for some small scale hard engineering strategies, the overall preference was for soft engineering approaches to flood defence in the area. Some of these are outlined in this presentation. Use it to make notes onto your diagram in your handout. C. Hard & soft engineering strategies to reduce the impact of flooding

i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the existing flood walls & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North

A section of the flood wall at Cockermouth. If the discharge were to rise, the flood wall could act to keep the water in the channel and away from the buildings.

The flood gate at the footbridge in Cockermouth. This gate can be closed during very high discharge to keep the water in the channel and prevent flooding.

i. Hard Engineering Where there already are existing properties close to the river, it is recognised that small scale hard engineering defences are required, for example at Cockermouth: Maintain the existing flood walls & flood gate – without these a further 119 properties would be at risk. In total, the Derwent has over 49km of flood walls. Cockermouth North Continue to dredge the channel in Cockermouth itself to keep it clear and free- flowing.

ii. Soft Engineering The preference will be for soft engineering strategies, however, as these are more sustainable. Use land use zoning to ensure new development does not occur in areas of high flood risk, for example to the west of the hospital. Cockermouth North

Building should be restricted in the area to the west of the hospital. This is a map produced by the Environment Agency showing areas at risk of flooding.

ii. Soft Engineering Use land use zoning to ensure new development does not occur in areas of high flood risk. Cockermouth North In the upper course, near Bassenthwaite Lake, flood defences for farmland should be removed to create safe flood zones on the floodplain around the Lake. Bassenthwaite Lake This will also help reduce the pollutants reaching Bassenthwaite, which is an SSSI.

The rapid overland flow from the Cumbrian Mountains can be allowed to be stored on the floodplain around Bassenthwaite Lake, reducing the discharge moving downstream towards Cockermouth.

Responses to the flood The government provided £1 million to help with the clean-up and repairs and agreed to pay for road and bridge repairs in Cumbria · The Cumbria Flood Recovery Fund was set up to help victims of the flood. It reached £1 million after just 10 days · Network Rail opened a temporary railway station in Workington The ‘Visit Cumbria’ website provided lists of recovery services and trades, and people who could provide emergency accommodation

Example question: For a specific riverine area explain how flooding has been managed (6)

For a specific area explain how the risks of flooding have been reduced (6) The River Derwent flows through Cockermouth and is located in Cumbria, England and suffered flooding in 2009 and Since the floods, various flood management strategies have been introduced in the area. The rivers were dredged and cleared of debris to increase the depth of the channel and reduce the chance of overflowing. Flood levees have been built around Cockermouth and the river banks raised here. Bridges have been rebuilt and strengthened at the base to withstand potential flooding. There is an improved monitoring of the river to allow better warnings next time and evacuate residents. Residents are also prepared through having sandbags and flood doors in their homes to reduce flood damage. Trees have been planted on upload slopes to increase interception which will reduce surface run-off and increase lag time so that the rivers do not fill so quickly and overflow. Also, building on floodplains has been reduced or removed so that soils are not so impermeable. Overall these strategies are quite sustainable since they balance the economic cost of management with the value of the land and properties being protected. Some residents may consider flood walls and levees to be unattractive however they will protect homes and businesses and so will be socially sustainable. And afforestation and clearing river drainage channels is environmentally sustainable since it improves how a river flows without using hard engineering which is unnatural.