First year report CEOS Working Group on Climate Mark Dowell EC/JRC.

Slides:



Advertisements
Similar presentations
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 WGISS – GEO Discussion.
Advertisements

CEOS-led response to the GCOS-IP Mitchell D. Goldberg CEOS Climate SBA Coordinator NOAA/NESDIS 1.
STRATEGY TOWARDS AN ARCHITECTURE FOR CLIMATE MONITORING FROM SPACE Report on Behalf of CEOS-CGMS Writing Group Mark Dowell EC/JRC.
CEOS-CGMS Working Group Climate, Darmstadt, Germany, 5-7 March 2014 Coordination Group for Meteorological Satellites - CGMS COORDINATION GROUP FOR METEOROLOGICAL.
Writing group on Architecture for Space- based Climate Monitoring Mark Dowell EC/JRC.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
Climate Monitoring Architecture and the ECV Inventory Mark Dowell European Commission Joint Research Centre.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Accomplishments and Challenges 2012 ….. report from the chair Kiran Kumar.
28 th CEOS Plenary Session John Bates NOAA CEOS Plenary, Agenda Item 13 Tromsø, Norway October 2014.
1 Report of the GCOS Space Rapporteur to AOPC-20.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 18 Steven Hosford on behalf of the Disasters Study Group Disasters Study Group.
Coordination Group for Meteorological Satellites - CGMS Climate Monitoring Architecture: Status and way forward Presented to CGMS-41 plenary session.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitch Goldberg.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
Status of Current WGISS GEO Tasks and Actions Satoko Horiyama MIURA JAXA Mission Operation System Office of Space Mission Application Directorate (MOSS)
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Mark Dowell and John Bates Report on the first 3 years of the CEOS Working Group on Climate.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS engagement for GEO and UNFCCC meetings in late 2012 GEOIX – engagement.
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Climate Monitoring Architecture and ECV Inventory Mark Dowell.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
Climate ECV Inventory and Report from UNFCCC/COP Mark Dowell European Commission – Joint Research Centre CEOS SIT-28 Meeting Hampton, Virginia, USA 14.
Climate side meeting 15:30-17:30, 3rd Nov 2009 Report of discussion.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
WMO Architecture for Climate Monitoring from Space Update for ICG WIGOS Jérôme Lafeuille (OBS/SAT/C/SBOS) Stephan Bojinski (OBS/SAT/SO/SUP) WMO; OBS/SAT.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
CGMS-42 CEOS-CGMS WP-01 V1, 11 May 2014 Coordination Group for Meteorological Satellites - CGMS Status report by the CEOS-CGMS Joint Working Group on Climate.
SIT-27 Meeting La Jolla, CA, USA March 26-28, CEOS Priorities for 2012 Timothy Stryker CEOS Executive Officer.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Sustained Coordinated Processing of Environmental Satellite Data for Climate Monitoring SCOPE-CM Sustained, Co-Ordinated Processing of Environmental Satellite.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Status Report – CEOS-CGMS Working Group on Climate Presented to CGMS-43 Plenary session, agenda item G.1.
CEOS Work Plan Andrew Mitchell - NASA WGISS-43
Pascal Lecomte - WGClimate Chair March 7th, 2016
Space Agency Response to the GCOS IP
CEOS Carbon Strategy – WGClimate Actions
Essential Climate Variables (ECVs) and the ECV Inventory
Joint Working Group Climate Report
Broader Coordination on Carbon Observations
Space Agency Response to the GCOS IP
Essential Climate Variables (ECVs) and the ECV Inventory
WGClimate Pascal Lecomte, Jörg Schulz (ESA, EUMETSAT)
The Joint CEOS/CGMS Working Group on Climate
CEOS/CGMS JWGC and status of actions to the IP
WGClimate Pascal Lecomte, Jörg Schulz (ESA, EUMETSAT)
CEOS/CGMS Working Group Climate
Update about WGClimate #9
Precipitation Virtual Constellation (P-VC)
CEOS SIT Chair Priorities
SIT Chair Priorities and SIT-33 Objectives
CEOS-CGMS WGClimate Jörg Schulz, EUMETSAT, WGClimate Chair
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
WG Climate Observations for Climate
CEOS Working Group on Climate (WGClimate)
Precipitation Virtual Constellation
VC/WG/AHT Working Day Outcomes
Presentation transcript:

First year report CEOS Working Group on Climate Mark Dowell EC/JRC

Committee on Earth Observing Satellites Working Group on Climate (WGClimate) Chair of CEOS WGClimate Mark Dowell (EC/JRC) Vice Chair John Bates (NOAA/NCDC) WGClimate was endorsed as a full CEOS WG (joining WGISS, WGCV and WGEdu) and will coordinate and encourage collaborative activities between the world’s major space agencies in the area of climate monitoring The Mission of the Working Group Climate (WGClimate) is to facilitate the implementation and exploitation of Essential Climate Variable (ECV) time-series through coordination of the existing and substantial activities undertaking be CEOS member agencies. This includes the numerous iterative steps involved in the creation of ECVs and ensuring ECV life cycle information is gathered, organized, and preserved for future generations

Membership Mark Dowell - EC/JRC (Chair) John Bates – NOAA (Vice Chair) Tamotsu Igarashi - JAXA Joerg Schulz - EUMETSAT Yang Jun - CMA Andy Shaw - UKSA/NCEO Pascal Lecomte - ESA John Dwyer - USGS Eric Lindstrom - NASA Didier Renaut - CNES Daniel Alejandro Vila - INPE Stella Melo - CSA Albrecht von Bargen - DLR Robert Husband – EUMETSAT Viittorio De Cosmo - ASI Mitch Goldberg – NOAA (Climate SBA) Brian Killough – NASA (SEO) Shelley Stover – NASA (SEO) Kerry Sawyer – NOAA (DCEO) Carolin Ritcher - GCOS Barbara Ryan - WMO Jerome Lafeuille - WMO Seonkyun Baek - GEO

WG Climate Facilitate implementation and exploitation of ECVs time- series ToR Activities… WG Climate Facilitate implementation and exploitation of ECVs time- series ToR Activities… Climate SBA Monitor progress of Climate SBA actions. 1.Coordination of CEOS response to GCOS IP 2.Progress reporting to UNFCCC/SB STA Climate SBA Monitor progress of Climate SBA actions. 1.Coordination of CEOS response to GCOS IP 2.Progress reporting to UNFCCC/SB STA Virtual Constellations WGISS WGEdu WGCV SEO Input for reporting GCOS/SBSTA Review docs Feedback on Priority Actions Gap & meta-analysis who does what ECV cal/val req Capacity Blg Portals, data access FCT & CFT

Terms of Reference The CEOS Climate Working Group will: –Review and assess, on behalf of CEOS, the generation of Fundamental Climate Data Records (FCDRs) and derived Essential Climate Variable (ECV) climate products supported by Member space agencies, complementary with existing entities and roles; –Contribute to the review of compliance of satellite missions and products with the GCOS Climate Monitoring Principles and with the “Guideline for the Generation of Datasets and Products meeting GCOS Requirements” (GCOS- 143); –Identify multi-agency implementation teams for each product and review their actions, and ensure that a coherent implementation plan exists for each and every product taking full account of other pertinent international initiatives such as SCOPE-CM and science programmes; –Make recommendations to the above teams and receive recommendations from them, for transmission to CEOS Agency Principals; –Ensure coherence of climate product generation supported by space agencies, including with other relevant international initiatives, in particular SCOPE-CM, and); –Undertake any other relevant activities as instructed by CEOS Chair.

First WGClimate meeting May – Frascati Co-located with SIT Almost all WG members + good involvement from other SIT participants

Priorities for WGClimate CEOS ECV Inventory: –Discussion on maturity index –Discussion on climate information stewardship issues Climate Monitoring Architecture –Logical architecture, basis for prioritizing WGClimate activities –Relation of physical architecture to ECV Inventory ECV by ECV analysis -> Assessment Outreach/Networking: both internal with other CEOS WGs and VCs & external SCOPE-CM/GSICS and WCRP

CEOS ECV Inventory Architecture ECV Assessments Stewardship & Maturity Index WGClimate

Representation at meetings Jan 2011: GCOS Satellite Supplement Update meeting Jan 2011: WMO-GCOS Continuity and Architecture Requirements for Climate Monitoring meeting Feb 2011: WGClimate technical meeting to discuss SEO support and Architecture (Dowell, Bates, Killough, Stover, Lecomte, Husband) Mar 2011: CEOS-CGMS Climate monitoring Architecture writing team meeting Apr 2011: WCRP-GCOS WOAP meeting Oct 2011: WCRP Open Science Conference

Why do we need a Climate Monitoring Architecture? Based on discussions three main "needs/usage scenarios" have emerged for a climate monitoring architecture: AAssist in promotion of a common understanding of the implementation implications of meeting the various space-related climate monitoring requirements (e.g. from GCOS) BTo support an assessment of the degree to which the currently implemented systems meet the requirements (and the generation of an action plan to address identified shortfalls/gaps/duplication) CTo improve our understanding of the end-to-end information flows and dependencies (i.e. from sensing through to decision-making)

Inventory Harmonization –GCOS Guidelines and GCMP –Logical Architecture –Maturity Index Align with existing MIM information requests Input for physical architecture Define common template for CEOS (but also CGMS)

Maturity Matrix Source J. Bates Ultimate ambition – derive a CEOS endorsed Maturity Matrix Starting point - NOAA effort Create a task within WGClimate, lead by research agencies (EL, PL), to review/modify improve One size may not fit all It is as much a tool to monitoring progress as it is to provide a snapshot of current capability

Relationship with WCRP There are different activities ongoing within WCRP (e.g. in GEWEX, WOAP) which are extremely compatible with WGClimate priorities: –Inventory/Physical Architecture – CEOS lead (?) –Assessments – WCRP lead (?)

Issue 1: ECV Assessments Need to be independent (?) Case for strong collaboration with WCRP Identify pilots: start with SST, other variables being considered precipitation, ozone But also VCs and WGCV (especially LPV) Main concern – additional resources needed for international “glue” –Once inventory has established roles & responsibilities we will use this to approach relevant agencies on an ECV basis

Issue 2: role of VCs Not all VCs are “created” equal We will focus on those where ECV implementation is a fundamental aspect of their ToR SST-VC as a pilot for the end-to-end assessment We will benefit from the other VCs knowledge of their community to identify appropriate groups

Issue 3: Inventory and MIM WGClimate can definitely benefit from CEOS MIM information call Urgent need for template – also basis for physical architecture Ongoing discussions on whether resulting inventory should be reintegrated with MIM