Simulation priorities for 2015 R. Bruce for task 5.2.

Slides:



Advertisements
Similar presentations
Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Advertisements

Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino,
FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
Critical beam losses during Commissioning & Initial Operation Guillaume Robert-Demolaize (CERN and Univ. Joseph Fourier, Grenoble) with R. Assmann, S.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Status of halo excitation studies at CERN R. Bruce, D. Banfi, M. Buzio, J. Barranco, O. Bruning, X. Buffat, R. Chritin, R. de Maria, M. Fitterer, M. Giovannozzi,
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
R. Bruce, Today’s meeting ATS optics proposed for use in 2015 (see LBOC, Evian) Several differences compared to nominal optics – Checks needed!
Stefano Redaelli, CERN, BE-ABP on behalf of the LHC Collimation Project and HiLumi WP5 LHC Collimation Status and Plans 2 nd Joint HiLumi LHC-LARP Annual.
Stefano Redaelli on behalf of the Collimation Project, HL-LHC-WP5, EuCARD, US-LARP teams LHC Collimation Upgrade plans The HiLumi LHC Design Study is included.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
Aperture in case of an asynchronous beam dump with ATS optics R. Bruce, E. Quaranta, S. Redaelli With valueable input from: A. Bertarelli, C. Bracco, F.
S. FartoukhLSWG Day, Monday 18th, ATS MDs for Run II S. Fartoukh for the ATS MD team  Reminder  Goal & overall strategy  Proposals for 2016/
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Work in progress: Improved models of collimation margins with TCT damage limit R. Bruce, L. Lari 1 Input and discussions: R. Assmann, A. Bertarelli, C.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Proposal for change of the reference emittance for the estimate of apertures, DA, etc. G. Arduini with input from: C. Bracco, R. Bruce, H. Burkhardt, R.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Gloria Corti, LHCb LHCb background on detector. Gloria Corti Page 2 Evaluating impact on experiment Increasing the inner coverage of the TT detector will.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
On behalf of the CERN Collimation Team and FLUKA team…
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Operating IP8 at high luminosity in the HL-LHC era
Ion Commissioning: Thursday & Friday
Tracking simulations of protons quench test
Status of MERLIN and Recent Developments
Task 2. 5: Beam-beam studies D. Banfi, J. Barranco, T. Pieloni, A
HL-LHC Aperture Update
On behalf of the CERN Collimation Team and FLUKA team…
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Update on loss maps for input to energy deposition studies
Upgrade Strategy for the Experimental Vacuum Systems
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
FCC-hh Machine Detector Interface
Asynchronous free ATS optics for LHC & HL-LHC S. Fartoukh, BE-ABP
Valloni A. Mereghetti, E. Quaranta, H. Rafique, J. Molson, R. Bruce, S. Redaelli Comparison between different composite material implementations in Merlin.
Energy deposition studies in IR7 for HL-LHC
Beam collimation for SPPC
Alice solenoid – orbit distortion
Introduction to dispersion suppressor collimation
The 4th International Particle Accelerator Conference, IPAC13
Week 35 – Technical Stop and Restart
Collimation margins and *
HL-LHC operations with LHCb at high luminosity
FLUKA Energy deposition simulations for quench tests
LHC Morning Meeting - G. Arduini
Presentation transcript:

Simulation priorities for 2015 R. Bruce for task 5.2

Cleaning performance Validate cleaning in different HL-LHC optics configurations – Pre-squeeze (done – M. Serluca, Merlin) Possibly study all points in squeeze – Merlin? – HL-LHC v1.1 – Flat beams – β*=10cm – Compare different collimator settings New materials – Cleaning performance with low-impedance TCSGs. Some work started (E. Quaranta) – Cleaning performance with more robust TCTs

TCTs in IR1/5 (1) Re-check baseline TCT settings and protected aperture – What is minimum setting allowed for cleaning? Simulations ongoing (H. Garcia): Cleaning simulations with scan of TCT setting. Get TCT inefficiency vs setting Possibly need input from experiments on tolerable background – What is minimum allowed setting for machine protection? Needed simulations: Asynchronous dump simulation with scan in TCT setting for TCT4 and TCT5 To estimate setting, include real damage limit of TCT (study W and MoGr) --> Need result of TCT damage limit study Investigate potential gain with improved phase advance MKD->TCT

TCTs in IR1/5 (2) Can we remove TCT4 if TCT5 is installed? – Verify cleaning and machine protection in different optics configurations. – Can we think of a configuration where TCT5 cannot protect the triplet well and the triplet aperture is critical?

Outgoing beam from experiments Protons: Check physics debris with TCLDs installed at locations suitable for ion operation – Can we open TCL6 if TCLD installed? – Synergy with task 5.3. Should we do this with SixTrack and/or FLUKA? Heavy ions: Track collision products in IR1/5 to provide starting conditions for FLUKA – With TCLD in proposed location: done (M. Schaumann) – Still missing: starting conditions on beam screen of impacted magnet without TCLDs – Optional: Provide starting conditions to FLUKA with orbit bump alleviation to quantify gain factor. Also for IR2

Experimental backgrounds Finish study of background in 2012 machine – Motivation: Study configuration with well-known machine conditions to learn and compare with 2011 study – Simulations: Beam-halo, beam gas (local, global), cross-talk (R. Kwee) Study gain in background with TCT5 – Tracking simulations with and without TCT5 provide starting conditions to FLUKA for IR shower simulation (started: R. Kwee) Study beam-halo background in different optics configurations – So far done only for round optics 15cm – Synergy with validation of cleaning – Provide inputs for FLUKA Beam-halo background with lighter TCTs – Synergy with tracking for cleaning validation

Advanced concepts Hollow e-lens – PhD student at CERN planned to start in 2015 using SixTrack – MERLIN studies planned at Huddersfield (H. Rafique) Crystals – PhD student at CERN planned to continue work of Daniele Mirarchi