Effects of Island Park Reservoir on sediment and phosphorus transport in the upper Henrys Fork watershed Rob Van Kirk Senior Scientist Henry’s Fork Foundation.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

April 4, 2008 Variation in salmonid bed-habitat conditions with sediment yields in Lagunitas and San Geronimo Creeks Marin County, California Barry Hecht,
Exploring a low tech, low cost method for volunteer phosphorus monitors Integrating research and extension in a southwest Michigan TMDL watershed Jane.
Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
U.S. Department of the Interior U.S. Geological Survey Prepared in cooperation with the Johnson County Stormwater Management Program Casey J. Lee U.S.
IMPROVING ESTIMATES OF SUSPENDED SEDIMENT CONCENTRATION AND FLUX IN THE LITTLE BEAR RIVER Brant Whiting, Jeffery S. Horsburgh and Amber S. Jones Utah Water.
The Effect of the Changing Dynamics of the Conowingo Dam on the Chesapeake Bay Mukhtar Ibrahim and Karl Berger, COG staff Water Resources Technical Committee.
Henry’s Lake Outlet: Flow and Sediment Assessment Sagar Neupane University of Idaho and Erika Ottenbreit, Helalur Rashid, and Joe Wagenbrenner Washington.
Physical modelling of the removal of Glines Canyon Dam & Lake Mills By Chris Bromley, Gordon Grant, Colin Thorne University of Nottingham / Oregon State.
Rapid and Torch Rivers August 2013 ESLA. Issue: Increasing Sediment 1993 – Aarwood to Torch River.
Sediment Movement after Dam Removal
1 The spring 2014 Myra Kraft Open Classroom Water: Challenge of Extremes Every Wednesday, 6pm – 8pm January 8 through April 9 West Village F, Room 20 Northeastern.
Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No March 26, 2013.
A Preliminary Evaluation of the Potential Downstream Sediment Deposition Following the Removal of Four Dams on the Klamath River Yantao Cui 1, Christian.
SENSORS, CYBERINFRASTRUCTURE, AND EXAMINATION OF HYDROLOGIC AND HYDROCHEMICAL RESPONSE IN THE LITTLE BEAR RIVER OBSERVATORY TEST BED Jeffery S. Horsburgh.
Impact of Sampling Frequency on Annual Load Estimation Amber Spackman Jones Utah Water Research Lab Nancy Mesner Watershed Science Jeff Horsburgh Utah.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Lecture ERS 482/682 (Fall 2002) Urbanization ERS 482/682 Small Watershed Hydrology.
Spokane River PCB Source Assessment Washington State Department of Ecology Spokane River Forum May
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Real-Time Water Quality Monitoring for Investigating the Strengths and Weaknesses of Existing Monitoring Techniques Little Bear River Basin Jeffery S.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Compliance Monitoring─Ensuring Effective Results Jim Younk Idaho Power Company.
USGS Water Resource Monitoring and Assessment Activities Salinity and other topics presented to the Garfield County Energy Advisory Board Dec. 1, 2005.
West Fork of the White River Stream Restoration Monitoring Dan DeVun Ecological Conservation Organization (501)
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
Bathymetry Changes Caused by a Tropical Storm Chris Scheiner and Gary Pelton US Army Corps of Engineers.
Materials Transport & NSCD Material Classes Velocity to Transport Relationships York NSCD Restoration PSY CCREP.
Processing of a Fine Sediment Pulse after Dam Removal Sediment Budget and Longitudinal Trends Chiloquin Dam Removal – Sprague River Matt Cox, Desiree Tullos,
Nicole Reid, Jane Herbert, and Dean Baas MSU Extension Land & Water Program W. K. Kellogg Biological Station Transparency tube as a surrogate for turbidity,
Changes in Phosphorus Concentrations and Loads in the Assabet River Following Mandated Reductions in Wastewater Treatment Plant Discharges U.S. Geological.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Middle Fork Project Project Description April 25, 2006.
Sediment Yield and Channel Processes. Definitions Suspend Sediment – sediment (orgranic or inorganic) which remains in suspension in water for a considerable.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Linking freshwater habitat to salmonid productivity Watershed Program 1 1. NW Fisheries Science Center 2725 Montlake Blvd. East, Seattle, WA
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Gary R. Wall and Timothy F. Hoffman U.S. Geological Survey
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Fairy Lake Annual General Meeting Dave Macpherson Water Management Technical Specialist Parry Sound District Ministry of Natural Resources.
Nutrient and Sediment Loading in Sougahatchee Creek and the Impacts on Aquatic Biota Report submitted to West Point Stevens and the Cities of Auburn and.
Robert M. Hirsch, Research Hydrologist, USGS September 6, 2012 Nitrogen, Phosphorus, and Suspended Sediment fluxes from the Susquehanna River to the Bay.
SPARROW: A Model Designed for Use With Monitoring Networks Richard A. Smith, Gregory E. Schwarz, and Richard B. Alexander US Geological Survey, Reston,
Abstract Man-made dams influence more than just the flow of water in a river. The build up of sediments and organic matter, increased residence times,
Note: This presentation contains only preliminary research results. If you have any questions, please contact Julie Vano at Thanks.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Watershed Origins of Sediment Loads
Hydrological changes resulting from dam construction
ISSUES RELATED TO THE FEDERAL RENEWABLE GOAL
The Boardman: A River Reborn
Precipitation-Runoff Modeling System (PRMS)
Conclusions & Future Work
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Evaluating the long-term future of fine sediment in Lake Powell
Upper Snake Reservoir Operations October 13, 2015
Kootenai Basin Spring/Summer Operations for 2016
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Stream Connectivity in the Clark Fork Watershed
Adult Returns and Juvenile Outmigration Data
Albeni Falls Dam Operations
Water Testing Project for the North Fork River
Gradient The land surrounding the river channel. Valley The middle section of the river. Upper Course The steepness of the river. Mid Course The part of.
Reservoir sedimentation
Lower Susquehanna River Watershed Assessment
Fisheries Adventure Learning—Boise Watershed Luke Kolar and Lee Brown.
Presentation by Graham Kissack
Kootenai Basin Spring/SummerOperations for 2016
Little River Ditches Watershed Monitoring
“Characteristics of Suspended Sediment and Flow in Downstream of Mekong River, Southern Vietnam” 5/22/2019 Duong Thai Bang (M2) (Supervised by Prof. Maki.
Presentation transcript:

Effects of Island Park Reservoir on sediment and phosphorus transport in the upper Henrys Fork watershed Rob Van Kirk Senior Scientist Henry’s Fork Foundation Ashton, Idaho Ken Lindke Statistical Consultant

U.S. Bureau of Reclamation –Clyde Lay, Megan Hecket, Mike Beus HFF Staff, Volunteers, and Interns –Taylor Burdge, Jeff Clemente, Matt Cahoon, Anne Marie Emery, Trevor Gordon, Sheryl Hill, Chau Ho, Sara Reese, Thacia Schmidt, Blair Tynes, Chris Wynn, Funders –Cross Charitable Foundation –CHC Foundation –Ishiyama Foundation –Spruance II Foundation –Individual donors to Campaign for Wild Trout Acknowledgments

Outline 1.Background 2.Objectives 3.Study area 4.Methods 5.Results a)Hydrology b)Suspended sediment c)Phosphorus 6.Conclusions

Background 20 miles of Henrys Fork downstream of IP Dam supports world-famous wild rainbow trout fishery Flat water of Harriman State Park is most popular Henrys Fork fishery worth $30-60 million annually Drawdown of Island Park Reservoir to minimum pool in 1992 delivered 50, ,000 tons of sediment to river Drawdown in 2013 was forecast at 10% of capacity

Objectives 1.Estimate suspended sediment (SS) load to river in late summer/early fall Estimate total phosphorus (TP) load to river 3.Estimate SS and TP loads into/out of IP Reservoir in Investigate relationships among SS, TP, flow, and reservoir volume 5.Infer physical/chemical/biological processes governing sediment and phosphorus fluxes 6.Relate TP to instream productivity (to be continued in 2016)

Henrys Fork Watershed

Study Area: Upper Henrys Fork

Methods 2013 –Sample SSC, TP, and turbidity at Flatrock and IP Dam 4 days per week, mid-Aug to mid-Oct –Sample multiple locations across channel (result: <1% of variability due to location in channel) 2014 (and ongoing…) –Add Sheridan Cr. site to sample input of tributaries to west end of reservoir –Ungaged trib inflow = Total reservoir inflow – HF inflow –Sample SSC, TP, OP, and turbidity 2 days/wk in center of channel (depth-integrated) –Establish permanent multiparameter sonde sites ARIMAX time-series models used for inference of concentrations between sampling dates

Hydrology—Mean hydrographs

Concentration vs. Flow

Suspended Sediment Loads: 2014

SSC versus Reservoir Volume

Comparison of 1992 and 2013

Total Phosphorus Loads: 2014

Total Phosphorus vs. SSC: 2014 TP positively correlated with sediment upstream of reservoir No correlation between TP and sediment below reservoir Note same axis scales on all three graphs Horizontal line shows 0.1 mg/L for reference

Fraction of TP as OP

Load summary SSTPSSTPSSTP Inflow NA ≈ 152≈ 2.7 Outflow 50, ,000 NA658 [640,735] 11.3 [11.2,11.6] ≈ 350≈ 6.4 Loads (tons) over the period Aug 12 to Oct 17. Where available, 95% CI is given in brackets. SS loads several orders of magnitude smaller than 1992 SS and TP loads ≈ 45% lower in 2014 than 2013 Irrigation demand was very high in 2013 Net export of both constituents in late summer/early fall

What happens to all of the P? Stream bottom in March. Same location in September. Seasonal growth of macrophytes in low-gradient reaches.

Macrophyte cover in Harriman Reach Differences between years due to weather differences.

Summer 2014 Dissolved Oxygen Highest productivity is between IP Dam and Pinehaven, in Harriman reach.

Conclusions Sediment and associated phosphorus is stored in reservoir during runoff SS and TP concentrations below reservoir independent of discharge or volume except when volume is < 60k ac-ft (45% of capacity) TP concentrations in river highest during late summer, when high fraction is OP SS and TP loads below reservoir higher during dry years, when irrigation delivery is high 10+ yrs of data will yield P and SS budgets… High P export drives high system productivity based on macrophytes, at least for now…

Questions?