The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.

Slides:



Advertisements
Similar presentations
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Advertisements

Case S-5_L-Reactor1 Case Study 5: L-Reactor Thermal Effluent.
Indiana Department of Environmental Management
Overview of CWA Section 316(a) Evaluations of Power Plants with Thermal Discharges in Maryland Presented at EPRI Workshop on 316(a) Issues: Technical and.
Clean Water Act SAFE 210. History/Amendments Recent major amendments were enacted in 1972, 1977, and – Established the National Pollutant Discharge.
Clean Water Act Permitting and Operational Discharges from Vessels An Overview February 2007.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Chapter 56 Workgroup Orientation Session The Road to Chapter 60 June 30, 2007.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
San Joaquin River Restoration Program State of the Rivers Symposium San Joaquin County Ms. Alicia Forsythe May 2, 2011.
Concentrated Animal Feeding Operation (CAFO) Regulations - Update Meg Collins Colorado Livestock Association & Landon Gates Colorado Farm Bureau Water.
Robert L. Burns, Jr., Esq. Buchanan Ingersoll & Rooney PC August 1, 2013 Impact of Environmental Regulation on Coal Combustion for Electrical.
Pennsylvania Draft Regulations for the Control of Mercury From Coal-fired Electric Generating Units Allegheny Section- AWMA Air Quality Issues Workshop.
Overview of Environmental Regulations and Drought Impacts in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT July 13, 2015.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Chapter 45 Environmental Protection and Global Warming.
Kensington Mine Tailings Impoundment Litigation
Clean Water Act Section 316(b) Proposal Regulations for Cooling Water Intake Structures at Existing Facilities April 6, 2011.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Hunton & Williams EPA’s New Rule for Cooling Water Intake Structures at “Existing” (Phase II) Facilities Kristy A.N. Bulleit Hunton & Williams 1900.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
1 EPA Regulatory Authority and PPCPs Octavia Conerly Health and Ecological Criteria Division Office of Water Office of Water October 26, 2005 October 26,
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
CWA §316(b) Phase III Rule - APPA’s “Back of the Envelope” Analysis Do The Potential Benefits Justify Further Regulation of Low Flow Power Producers? Presented.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Project Status South Delta Improvements Program Project Status November 2003.
Procedures to Implement the Texas Surface Water Quality Standards
Implementation of Phase II CWIS Rule
A quantification of groundwater seepage during drought and its importance for water quality modeling in the St. Vrain watershed Hannah Chapin Thomas Gerber.
Rules and Exceptions - The Costs of “Cheap” Coal.
Water Quality Certification for hydropower licensing in Wisconsin.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
1 Public Meeting Regarding US Steel’s Gary Work NPDES Permit Renewal September 26, 2007 IN Department of Environmental Management.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Paul Novak, IDEM 209 th Technical Committee Meeting October 6-7, 2015.
The Clean Water Act (1977, 1981, 1987) By: Jonas Szajowitz.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
PUBLIC HEARING September 15, Draft NPDES Permits for ArcelorMittal Facilities Indiana Harbor West, Central Wastewater Treatment Plant, Indiana.
Connie Brower NC DENR Division of Water Resources.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Proposed EPA Power Plant Cooling System Regulations.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
COOLING WATER INTAKE STRUCTURES RULE: § 316(b) Congressional Briefing October 5,
Department of Environmental Quality
Waste Discharge Permit: Paradise Irrigation District
Clean Water Act Regulations affecting Electric Utilities
City of Greeley Prepared for the Water Quality Control Commission
Water Quality Division Updates
Water Quality Standards Submittal & Review Process
Module 19a: Water Quality Certification
Department of Environmental Quality
Senior Campaign Representative Pennsylvania and Maryland
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
DEEP Changes to Pretreatment Programs
California’s Plan to Deal With Once-Through Cooling At
Senior Campaign Representative Pennsylvania and Maryland
National Act Regulated by EPA
John Tinger U.S. EPA Region IX
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Department of Environmental Quality
Enforcing the NAAQS Case Study Sean Taylor
316(B) COOLING WATER INTAKE STRUCTURES
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility draws water from the Connecticut River into a cooling system that varies from open cycle once through, cooling tower cooling to a closed cycle recirculating cooling tower configuration. Heated water from the cooling water system is discharged to the Connecticut River.

 The facility has two mechanical draft cooling towers. The CWIS as well as the thermal discharge outfall is located on the west side of the Connecticut River in Vernon Pool, an impoundment created by Vernon Dam.

 The Agency of Natural Resources administers the federal CWA in Vermont  Any discharge of pollutants to state waters require a (NPDES) discharge permit  Heat is a pollutant  Entergy is required to have a NPDES permit for the thermal discharge to the Connecticut River

 CWA 316(a) – the thermal discharge effluent limit must be more stringent than necessary to assure the protection and propagation of the balanced, indigenous population (BIP) of shellfish, fish and wildlife in the receiving waters.  CWA 316(b) - the location, design, construction and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.  Implementing federal regulations

316b focuses on the impacts of the CWIS  Entrainment – occurs when the cooling towers draw in aquatic organisms  Impingement – occurs when the flow of water traps aquatic organisms against grills or screens as the water is drawn into the CWIS.  Both result in injury or death of aquatic organisms.

 10 VSA Chapter 47  The Vermont Water Quality Standards, Section 3- 01B.1.b – The total increase from the ambient temperature due to all discharges and activities shall not exceed 1°F for cold water habitat except as provided in d.  Section 3-01B.1.d – The Secretary may set higher temperature limits if: 1)The discharge complies with all applicable provisions of the VWQS 2)A mixing zone of 200 feet is not adequate 3)After taking into to account the interaction of thermal effects and other wastes, the temperature will not result in thermal shock or prevent the full support of uses in the receiving waters.

Under the VWQS, the following are designated protected uses in the Connecticut River:  Aquatic Biota, Wildlife, and Aquatic Habitat  Aesthetics  Public water supply  Irrigation of crops and other agricultural uses  Swimming and other primary contact recreation  Boating, fishing and other recreational uses

The permit allows Entergy to discharge heated water to the Connecticut River. The permit sets thermal effluent limitations during specific time periods. Compliance with the temperature limits is measured at a downstream compliance point at Station 3 (approximately 1.5 miles downstream from the discharge) as compared to ambient as measured at Station 7 (located approximately 3.5 miles upstream of the discharge).

 The permitted discharge flow is up to 543 MGD and Entergy withdraws in excess of 125 MGD, actual intake flow for cooling purposes. The facility has not run the cooling towers year round since successful 316(a) and (b) demonstrations were made in 1978 (winter period) and 1991 (summer period).

The temperature limits for the period of October 15 through May 15 are as follows:  The temperature at Station 3 shall not exceed 65°F.  The rate of change of temperature at Station 3 shall not exceed 5°F per hour. The rate of change of temperature shall mean the difference between consecutive hourly average temperatures.  The increase in temperature above ambient at Station 3 shall not exceed 13.4°F.

The increase in temperature above ambient at Station 3 shall not exceed the limits set forth below: Station 7 (upstream)Increase in Temperature Above Ambient at Station 3: Above 63°F2°F >59°F, ≤63°F3°F ≥55°F, ≤59°F4°F Below 55°F5°F

Station 7 Temperature:Increase in Temperature Above Ambient at Station 3: Above 78°F2°F >63°F, ≤ 78°F3°F >59°F, ≤63°F4°F ≤59°F5°F The permit sets a temperature cap of 85° F at Station 3.

The permit includes effluent limits and monitoring frequencies from each discharge point. The permit also requires monitoring in the Connecticut River. The purpose of the Connecticut River monitoring regime was to assure that the discharges did not violate the Clean Water Act and applicable Vermont Water Quality Standards. The annual monitoring regime focuses primarily on the fish and other aquatic biota that inhabit the Connecticut River in and around the vicinity of Vernon.

 The discharge permit was renewed by the Agency in On September 30, 2005, Entergy applied for renewal of its discharge permit. The permit expired on March 31, Because Entergy submitted a timely application for renewal on which the Agency has not yet made a final decision, in accordance with 3 V.S.A. §814, Entergy may continue to operate under the terms and conditions of the expired permit. The Agency is currently working on the renewal permit.

On February 20, 2003, ENVY applied for an amendment to its 2001 discharge permit. The application essentially requested a §316(a) variance for an additional 1°F increase in thermal discharge during the period of May 16 through October 14. On March 30, 2006, the Agency amended the 2001 permit, granting the request for an increase during the June 16 – October 14 time period and denying the request for the May 16 – June 15 time period.

 The Agency’s permit amendment was appealed to the Environmental Court. The Court issued a final decision on November 24, 2008 substantially affirming the Agency’s permit decision. The Environmental Court’s decision was subsequently appealed to the Vermont Supreme Court. The Supreme Court’s decision was issued on December 18, 2009.

 The federal 316b rules have been the subject of protracted litigation in the federal courts in Riverkeeper vs EPA.  The US Supreme Court issued a decision in  EPA published draft rules on April 20,  EPA issued two Notices of Data Availability in June 2012 regarding impingement mortality limitations and the preliminary results of surveys of households' willingness to pay for incremental reductions in fish mortality.  The deadline for the final 316b rule is June 27, 2013.

 Once a tentative decision has been made, the Agency must notify the public, EPA, and affected states.  After a minimum of 30 days public notice and opportunity for a public informational hearing, the agency issues a permit decision and a response summary.  The permit decision may be appealed to the Environmental Division of Superior Court