1 Loudoun County, Virginia Board of Supervisors Public Hearing March 8, 2010 Powering a Better Tomorrow GEP/S Hybrid Energy Park ZMAP 2009-0005, SPEX.

Slides:



Advertisements
Similar presentations
2009 Transition Dynamics Enterprises, Inc. Used with permission. What You Need to Know about the Green Economy Add your name here.
Advertisements

Second Amendment to Cooling Water and Landfill Gas Sale and Purchase Agreements December 16, 2008.
Agreement between the Village of Owego and Inflection Energy.
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Federal Energy and Environmental Regulation Agencies and Laws
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Dominion Update November Dominion: In Virginia Headquartered in Virginia  More than 9,000 employees in the Commonwealth  Annual Virginia payroll.
Steve Irwin Public Outreach Coordinator. What is the Board’s role? Before any company can build a major utility facility, OPSB assures that it benefits.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
BIOMASS POWER PLANT Jo-Carroll Energy, Inc. (NFP).
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
CT Energy & Technology, LLC presents World’s largest renewable energy project utilizing Connecticut manufactured fuel cell technology.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Engineering Technology Division
DMME RAP Meeting September 24, EIA Regulation – Outline 9VAC15-20 “Guidelines for the Preparation of Environmental Impact Assessments for Oil or.
POWER & PROTECTION ELECTRICITY, ENVIRONMENT, SITING.
Federal Energy and Environmental Regulation Agencies and Laws
Page 1 3/13 – Lynchburg 4/23 – Fredericksburg 3/28 – Charlottesville 4/12 – Danville.
1 Loudoun County, Virginia Planning Commission Public Hearing December 17, 2009 Powering a Better Tomorrow GEP/S Hybrid Energy Park ZMAP , SPEX.
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
NORTH CENTRAL FLORIDA REGIONAL PLANNING COUNCIL REPORT AND RECOMMENDATION ALACHUA WEST DRI.
Municipal Tax Increment Financing
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Lorelei H. Oviatt, AICP Director Kern County Planning And Community Development Department August.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Greening of Fort Wayne, IN Partners for Pollution Prevention June 6, 2007.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Water Sources and Pollution. Where does our water come from? It comes from 2 sources: 1.Surface water: above ground in lakes and rivers. –Most large cities.
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
PowerButte: Solar Overlay Tim Snellings, Director Department of Development Services Photo courtesy of Shamim Mohamed A Place For Clean Energy.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
24 th Annual Sustainability and Environmental, Health & Safety Symposium March 25, 2015 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Chapter 20 Environmental Protection
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
The Chesapeake Bay: How is it Doing? An Overview of The Chesapeake Bay Watershed.
About Us Overview Off Grid Technologies is a premier engineering & consulting firm that specializes in renewable energy projects in commercial, industrial,
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Federal Energy and Environmental Regulation Agencies and Laws
Barriers and Challenges to Developing Renewable Energy Projects
FUEL CELLS.
SEQRA as a Tool to Review Energy Projects
Integrated Bilateral Agreement (IBA) 2018 to 2028
Presentation transcript:

1 Loudoun County, Virginia Board of Supervisors Public Hearing March 8, 2010 Powering a Better Tomorrow GEP/S Hybrid Energy Park ZMAP , SPEX & CMPT

2 Local Economic Stimulus During Construction: $183 million per year in revenues during 3 years of construction. 1,205 jobs during construction. One of the largest infrastructure projects in the Commonwealth of Virginia. Annual Local Government Revenue: Estimated $8 to $12 million in County real estate and personal property taxes per year. Estimated $1 million annual to Town of Leesburg Sewer and Water Fund from purchasing of treated effluent. ~Churma Economics & Analytics,“The Economic and Fiscal Benefit of a Proposed Energy Generating Plant in Loudoun County, VA.” November 12, 2009

Benefits Transition off of coal. Electrical generation near demand. Puts Loudoun in forefront of renewable energy by constructing Virginia’s largest solar array. Unique economic development opportunities. Significant annual tax revenue to Loudoun County. Educational opportunities. Energy reliability for the local community. Reduces energy importation. 3

A Unique Location Industrial Area 4 Luck Stone Quarry Overlay Loudoun Water Treatment Plant (future) Leesburg Airport Noise overlay Electrical transmission lines Gas Transmission Lines

5 Existing Resources Two underground natural gas lines on site. Lines from the Gulf Coast, Ohio Valley and liquid natural gas port. Redundancy allows a unique facility that will not need to burn oil or diesel. Natural Gas Transmission Two 230 KV and One 500KV Electrical transmission Lines. North/South and East/West Transmission Distribution. Between two major substations serving Loudoun County. Electrical Transmission Lines

What Are We Proposing? 6 Combined Cycle (Natural Gas and Steam) generator. Natural Gas peak energy generation. Virginia’s Largest Solar array. Wastewater effluent re-use. Best Available Control Technology facility. Low Stack Design. State-of-the-art technology.

Impacts on Energy Supply “In all of the system models that were studied the Green Energy Partners … proposed …generator resulted in a large reduction (between 18% and 21%) in reliance on external power to be delivered through the transmission system to serve the load in the Loudoun County and Leesburg area.” 7 ~ PowerGEM, “Leesburg Generation Study “ (7/7/09)

Energy Policy Revised General Plan – Energy and Communication Policies: “Electric generation facilities that use clean burning and environmentally sound and proven fuel sources for power generation can be located only where their impact on the surrounding land uses and the environment is compatible.” (Page 2-24). 8

9 Off-Setting Environmental Impacts Air Quality - Best Available Control Technology. Water Quality - Chesapeake Bay Cleanup. BMP/LID Only 19% of the site is impervious. Wetlands - No onsite impacts. Very Steep Slopes - No onsite impacts. Noise - Sound Attenuation condition of approval. Visual - Low profile, topographically concealed. Forest Resources - Replacing low quality area with high quality reforestation.

Off-Setting Environmental Impacts Continued Access Road relocation to avoid wetlands, environmentally sensitive resources and wood turtle habitat. Low stack design. Plume abatement. Zero discharge. Effluent re-use to remove harmful nitrates and phosphates from the Potomac River. No diesel fuel. 10

Air Quality “This plant will be designed with the most advanced air pollution control technology to reduce air discharges as any plant in the [United States], western Europe or Japan. This control system is deemed to be the best technology available by the US EPA and the South Coast Air Quality management District in Los Angeles, CA (considered by many to be the premier regulatory agency for controlling smog in the US).” ~ MACTEC,“Revised Air Quality Study of Green Energy Partners/Stonewall Solar and Natural Gas-Fired Power Plant at Leesburg VA,” November 20,

Cleaning up the Bay Re-using up to 3-5 million gallons per day of Leesburg’s waste water. Using treated effluent removes nitrates and phosphates from the Potomac River and the Chesapeake Bay. Zero discharge of water reuse from the energy plant into streams. 12

What Will You See? 13

What Will You See? 14

Plume Abatement Visible plume is caused by ambient conditions of low temperature and high humidity. Plume abatement reduces the visible plume by adding hot dry air to the saturated air leaving the cooling tower. Plume abatement included in Conditions of Approval. 15

Water Reuse Regulated by DEQ pursuant to State of Virginia Code regulation: 9VAC Chesapeake Bay regulated by the U.S. Environmental Protection Agency. Town of Leesburg is permitted by DEQ to withdraw up to 12 million gallons of water per day with no requirement to discharge. Leesburg is currently using between 5 and 6 million gallons per day. The average flow of the Potomac is 18 billion gallons per day. Town of Leesburg has previously negotiated to sell the reuse of its treated effluent. A 2003 Chesapeake Bay Foundation study found that “wastewater discharged from sewage treatment plants is the second largest source of nitrogen pollution in the Chesapeake Bay.” 16

Planning Commission Approval After two public hearings and two worksessions, the Planning Commission on March 3 rd, 2010, recommended approval by an 8-1 vote. Commissioners noted in their findings the environmental benefits of using the treated effluent, which will remove nitrates and phosphates from the Chesapeake Bay. Paying our share: We went beyond mitigating our impacts by proffering cash for a historical narrative, off-site stream monitoring and off-site county trail enhancements. 17 We will plant meadowland habitats conducive to flora and fauna in the solar array area. Commissioners called the project a “win, win, win” and a “great project for the County.”

Required Federal and State Regulatory Approvals Permit/ApprovalRegulating AgencyRequired Date FAA Aeronautical StudyFederal Aviation Administration Received by GEP/S Air Quality PermitVirginia Department of Environmental Quality Prior to construction VPDES Construction Stormwater Permit Virginia Department of Conservation and Recreation Prior to start of any land disturbance and construction Virginia Joint Permit Application ACOE, VRMC, VDEQ, USFWS, NMFS Prior to construction VDOT Land Use PermitVirginia Department of Transportation Prior to construction of access road entrance Water Quality VPDES Water Discharge Permit Virginia Department of Environmental Quality Prior to any regulated discharges 18

Required Federal and State Regulatory Approvals 19 Permit/ApprovalRegulating AgencyRequired Date Virginia Pollution Abatement Permit Virginia Department of Environmental Quality Prior to any regulated discharges Electrical Interconnection Service Agreement PJMPrior to connection to transmission system Certificate of Public Convenience and Necessity (CPCN) VA SCC – Division of Energy Regulation Prior to commercial operations DEQ SupplementVirginia SCC and Department of Environmental Quality Prior to issuance of CPCN 1) Natural Heritage and Threatened and Endangered Species Virginia Department of Conservation and Recreation 2) Geology and Mineral Resources Virginia Department of Mines, Minerals and Energy

Required Federal and State Regulatory Approvals Permit/ApprovalRegulating AgencyRequired Date 3) Virginia Water Protection Program Virginia Department of Environmental Quality 4) Threatened or Endangered Plants and Insects Virginia Department of Agriculture and Consumer Services 5) Marine ResourcesVirginia Marine Resources Commission 6) Game and FisheriesVirginia Department of Game and Inland Fisheries 7) Historic ResourcesVirginia Department of Historic Resources Exempt Wholesale Generator Determination Federal Energy Regulatory Commission Prior to commercial operations date 20

21 Create a prototypical energy facility to be located near demand Utilize treated effluent that cleans up the Potomac River Decrease demand for coal power importation via high-tension lines Increase local grid reliability Utilize existing natural gas and electric infrastructure Low stack design Utilizing property topography to decrease visual impact Plume eliminator technology to reduce visual impact Sound suppresser technology to reduce noise impacts 100% natural gas Energy independence reliant on proven natural U.S. reserves Economic development diversification Significant increase in local tax revenue Green Energy Partners Goals

Thank You! Please visit us online at any questions or comments to

Hybrid Energy Park is proposing 52% open space that meets the definition as defined in the Revised General Plan. All development within the Transition Policy Area will be clustered with 50% – 70% open space and the full implementation of the Green Infrastructure polices. (RGP, page 8-3) 70% open space pertains to Rural Villages, see RGP, page