Public/Private Partnerships for Water & Wastewater Systems 2006 ACMA Summer Conference Loews Ventana Canyon Resort Tucson, Arizona.

Slides:



Advertisements
Similar presentations
From Preferred Bidder to Financial Close
Advertisements

Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Georgia Solar Energy Association (GSEA) Jason Bodwell Senior Program Manager GEFA March 20, 2014.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Preliminary Budget March 18, Previous Year’s Budget Reductions Elimination of Teaching Positions Special Education/Two Elementary Elimination.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Marcy Mealy Procurement Specialist CDBG Program
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
PROJECT DELIVERY SYSTEMS
1 Nassau County NY United Water Partnership The US Conference of Mayors Mayors Water Council April 30 – May 1, 2015 Rob Walker Chief Deputy County Executive,
Guaranteed Investment Contracts Chapter 9 Tools & Techniques of Investment Planning Copyright 2007, The National Underwriter Company1 What is it? Traditional.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
MODULE “STRATEGY DEVELOPMENT”
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Practical Ways for Towns to Save Money with Clean Energy Projects Doreen Hamilton April 30, 2014.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Financing Urban Public Infrastructure
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Using Value for Money Analysis to Evaluate Highway Public-Private Partnership Projects ARTBA P3 Conference Washington, DC, July 15-17, 2015 Patrick DeCorla-Souza,
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
PennDOT CNG Fueling Stations P3 Project for Transit Pennsylvania Public Transportation Association Conference April 8, 2015 Pennsylvania.
Eric S. Petersen Partner Hawkins Delafield & Wood LLP New York, NY United States Conference of Mayors Mayors Water Council Meeting Washington,
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
CONFIDENTIAL Virginia WaterJAM 2010 Christopher D. Lloyd September 22, 2010 Public Private Partnerships – Statutory Frameworks.
Stave Lake Water Supply and Treatment Project Business Case for P3 Canada Fund Funding Request AMWSC April
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
The Evolving Roles and Responsibilities of Gas Utilities In Today’s Markets Presented by: Hank Linginfelter Executive Vice President, Utility Operations.
June 20, 2012 Outsourcing Physical Plant Should I ???
Governor’s Tax Simplification Task Force Overview and Impact on City of Phoenix Presentation to Phoenix Chamber of Commerce January 15, 2013.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
ESOP Advisors, Inc. -- Employee Ownership and Government Privatization © ESOP Privatization of Government Operations ESOP Advisors, Inc. April, 2002.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Two Heads are Better Than One Patrick Callahan, Snyder & Associates Handouts and presentation are available online at
Commercial Matters Dublin Waste to Energy Project.
Public-Private Education Facilities and Infrastructure Act.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Atlantic Connection 2011 Roundtable Discussion Public Private Partnerships: What's in it for my Government?" 6th Annual Economic & Financial Development.
Preparing for negotiation  Understand client’s business intention and goals  Measure positioning of your client and the opposite party: the purpose.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 Fleet Sourcing Project Presented to the City Council By Wayne Corum, Director Equipment Services Department (ESD) November 17, 2009.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
One East Broward Blvd., Suite 1800
Irvine Ranch Water District Distributed Energy Storage Case Study
CIFA 2016 Workshop Performance Based Infrastructure
PROJECT DELIVERY METHODS
Preparing for Negotiation & Drafting Business Contracts
Procurement.
Controlling Project Cost and Schedule
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
The Role of Private Sector in Capital Budgeting
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Public/Private Partnerships for Water & Wastewater Systems 2006 ACMA Summer Conference Loews Ventana Canyon Resort Tucson, Arizona

2 Overview  Background & Introduction Joseph Graziose, Vice President Business Development, Severn Trent Services  Understanding Public/Private Partnerships  Benefits/Challenges of a Public/Private Partnership  Procurement Approaches  Key to a Successful Partnership  Public/Private Partnership Structures/Models  Case Studies  Questions & Answers

3 Options for Public/Private Partnerships  Public ownership Private operations Private design construction –Improvements –New facilities Public or private funding  Private ownership & provision of services by private company or utility  Lease/sale facilities & provision of services by private company or utility

4 Why Consider a Public/Private Partnership?  Potential cost savings Design/construction of capital improvements Operations  Risk reduction  Improved performance  Need for alternative financing

5 Benefits of a Public/Private Partnership  Single point of contact/accountability  Improved levels of customer service  Regulatory compliance  Availability of technical resources  Access to the latest technology  Cost control  Volume purchase discounts  Availability of capital  Maintenance management systems  Streamlined procurement

6 Challenges  Loss of control  Loss of public accountability  Personnel impacts/employee concerns  Complexity of the transaction

7 Procurement Approaches & Strategy  Request for Qualifications (RFQ)  Request for Proposals (RFP)  RFQ/RFP (Two Step)  Hybrid approaches Request for Qualifications & Expressions of Interest (RFQEI) Draft RFP (for Comment)/Final RFP Expanded RFP – Menu Approach

8 Procurement Process  Setting objectives  Selecting a procurement strategy  Defining service & key terms & conditions for business arrangements  Preparing the request for proposals  Interacting with prospective proposers  Evaluation of proposals  Selection & contract negotiations

9 Service Agreement $$$ Fee Effluent River Existing Clean Water Wastewater Collection & Pumping Distribution & Transmission Equity $$$ Loan Agreement $$ Billing Service Well Description of the Municipal Water & Wastewater Services Market Engineering Firms Financial Advisors Law Firms OperateStart UpConstructDesign Performance Guarantees Customers Water System Tax-Exempt and/or Taxable Bonds Debt and Equity Financing Bonds Existing Wastewater Plant With Capital Improvements & Sludge Disposal Municipality State & Federal Regulations Public/Private Partnership

10 Public/Private Partnership Structures OwnershipOperationAgreementModel IPublicPrivate5 to 20 yearsO&M of system constructed through traditional design/ bid/build delivery method IIPublicPrivate10 to 25 yearsDesign/Build/Operate (DBO) IIIPrivate 25+ yearsDesign, Build, Own, Operate and Maintain (DBOOM) There are three basic structuring approaches based on project ownership, construction and operation:

11 Service Agreement $$$ Fee $$ Service Customers Engineering Potential Scope of Services Legal Financial Private Contractor Regulatory Compliance QA/QC O&M of Plants Distribution & Collection Customer Service Capital Improvements Pretreatment Programs Municipality

12 Advantages  Maintain Control Over Process  Change-Orders Easily Accommodated  Well-Tested/Universally Accepted  Competitive Bidding at All Levels Disadvantages  Generally More Costly  Can Take Longer  Poor Incentive Structure/Risk Allocation  Limited Recourse if Things Go Wrong Traditional Project Delivery Approach (Design/Bid/Build) Government Grants Operations Design Engineer EquipmentConstruction Financing General Contractor Municipality

13 Advantages  Single Point of Accountability  Risk Assumption by Developer  Shorter Project Schedule  Reduced Costs Disadvantages  Project scope defined by Performance rather than by Design Specs  Legal and Procurement Barriers Financing Alternative Delivery Structures: DB/DBO/DBOOM EquipmentConstruction Project Developer Municipality OperationDesign Performance Guarantee

14 Key to a Successful Partnership  Equitable risk allocation  Reasonable financial security  Attainable & objective performance standards  Well defined work scope & division of responsibilities  Mechanism to monitor performance  Communications & reporting

15 Public/Private Partnership Case Study: Pasadena, Texas 3 WWTPs – 10 MGD, 4 MGD, 7 MGD Background:  History of non-compliance  Costs continued to rise, year after year  Non-existent maintenance programs  Overstaffed  Lack of leadership & management

16 Pasadena, Texas City’s Approach  Procurement through an RFP  Standard O&M contract  Maintenance cap fixed by City  O&M of the City’s 3 wastewater treatment plants  Guaranteed compliance  No layoffs

17 Pasadena, Texas Selection & Negotiation Process  City selected Severn Trent  Severn Trent hired all existing personnel Better salaries & benefits Recognized seniority  Severn Trent began detailed transition process  Severn Trent began immediate process changes & achieved compliance

18 Pasadena, Texas Summary  The City achieved immediate savings of over $800,000 per year.  Within 3 months, 2 consent orders were lifted.  Flow restrictions were lifted at 2 of the plants, allowing for an increase in capacity.  The partnership between Severn Trent and the City has continued from the initial 5-year term in 1994 through today.

19 Public/Private Partnership Case Study: Boyertown, Pennsylvania Water & Wastewater Systems Background:  Retirement of key operations personnel  Challenge of finding qualified staff  Compliance & operational issues at WWTP

20 Boyertown, Pennsylvania Borough’s Approach  Procurement through an RFP  Standard O&M contract  Maintenance cap fixed by Borough  O&M of the Borough’s: 0.75-MGD wastewater treatment plant 1.6-MGD water treatment plant 5 pump stations  Guaranteed compliance  No layoffs

21 Boyertown, Pennsylvania Selection & Negotiation Process  Borough selected Severn Trent  Severn Trent hired all existing personnel Leased Water Superintendent for four months until his retirement Recognized seniority Better salaries & benefits  Severn Trent began detailed transition process  Severn Trent began immediate process changes & achieved compliance

22 Boyertown, Pennsylvania Summary  The Borough saved nearly $500,000 by eliminating unnecessary capital improvements; additional savings of $60,000 per year due to process changes.  Severn Trent operations in Boyertown have been recognized: Safety awards from Eastern Pennsylvania WPCOA and Pennsylvania WEA Commendation from the Department of Environmental Protection  Scope expanded to include collection and distribution systems and meter reading in  The partnership between Severn Trent and the Borough has continued – and grown – from the initial 5 year term in 1994 through today.